Loading...
HomeMy WebLinkAboutSDP201300061 Review Comments Final Site Plan and Comps. 2014-03-04 (3)pF AL Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 March 12, 2014 Chris Haine, Planning & Development Manager Edens 7200 Wisconsin Ave, Ste 400 Bethesda, MD 20814 RE: ARB- 2013 -157: Stonefield Phase 2 (Costco) Final Site Plan and Building Plans Dear Chris, I have reviewed the plan with revision date of 2/24/2014 submitted for the above -noted application and I have the following comments. 1. The Sign -Vue fixture does not appear to be a full cutoff fixture and the "will be full cutoff' note is unclear. Please replace the Sign -Vue fixture with a fixture that is full cutoff according to the County's definition. 2. The XA -3 fixture in the fixture type table on LT -0 says the pole fixture is 18' high. Please revise the height to 17'6 ", to meet the ARB's 20' limit, including the 2'6" base. 3. ARB comment 19 required that the color of the garage doors match the adjacent wall. The matching colors were shown in the drawings displayed at the December 16 2013 meeting and on the elevations that were recently submitted. However, the finish schedule identifies #7 "cool gray stone" for the wall surface and #32 "tan" for the doors. Revise #32 say "to match cool gray stone ". 4. The AR, GT, and AG quantities listed in the plant schedule appear to be short by 1 each. Please confirm/correct the quantities. 5. 73 EA, 9 AG, 3 EK and possibly 2 AR make sense when distinguishing between "total" and "permanent" landscaping in Block G. However, the 14 PA and 2 of the AG don't. Please adjust the schedules to add 14 PA and 2 AG to the "permanent" schedule. 6. The EK shrubs should be listed as 30" high at planting in the landscape schedules. 7. There still appear to be conflicts between trees and pipes. Several trees are located on top of the pipe that runs along the south side of the site. Other trees are located on top of pipes or very close to pipes in various other locations throughout the site. The trees should be shifted to avoid the conflicts without reducing plant quantities. Alternatively, confirm that the pipes are deep enough to avoid conflicts. We are happy to meet with you to review the locations of the conflicts or to coordinate on this issue in any other workable manner. Please provide: 1. One set of revised drawings addressing each of these conditions. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner cc: ARB- 2013 -157 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Margaret Maliszewski DATE: PROJECT NAME: ARB- 2013 -157: Stonefield Blocks F and G - Costco Submittal Type Requiring Revisions O indicates Submittal Code County Project Number # Copies Erosion & Sediment Control Plan E &S # Copies Distribute To: Mitigation Plan (MP) I M. Maliszewski Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan RP Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan PSP Final Site Plan or amendment FSP Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB- 2013 -157 1 Other: Please explain: (For staff use only Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB I M. Maliszewski