April 4, 2014
William M. Eschenfelder
Delta Airport Consultants, Inc.
9711 Farrar Court, Suite 100
Richmond, Va 23236
RE: SDP201400019 CHO Airport Surface Parking Expansion — Major Amendment
Dear Sir:
Your Major Amendment application has been reviewed. In order for the amended site plan to be
approved the following revisions are required:
1. [32.5.2(a)] Clarify why TMP 32 -49 is included in "Project Information" as no work appears to be
proposed on this parcel. If TMP 32 -49 is indeed part of the project, owner information should be
provided or easements may be necessary.
2. [32.5.2(a)] It looks as if both grading work and the very edge of the new parking lot are proposed
outside of the parcel limits; please clarify.
3. [32.5.2(a)] Remove LI from the zoning note as the Airport parcel is zoned RA. Add EC (Entrance
Corridor).
4. [32.5.2(a)] Add a north point to the Landscape Plan.
5. [32.5.2(a)] Display the Landscape Plan at a standard scale.
6. [32.5.2(b)] One of the upper rows of parking in the new employee parking lot is labeled as 19 spaces
when there are just 18 shown on the plan; please revise.
7. [32.5.2(b)] List the total number of existing and proposed parking spaces in addition to the overall
total.
8. [32.5.2(b)] Provide the maximum amount of paved parking and vehicular circulation in the project
area for use in landscape plan calculations.
9. [32.5.2(d)] The critical slopes ordinance was recently amended to create a Steep Slopes Overlay
map for the development areas. The slopes shown on this plan are now considered "managed steep
slopes "; revise all `critical slopes' references to `managed steep slopes'.
10. [32.5.2(e)] Show all existing landscape features and clearly label what is being removed and what is
intended to remain.
11. [32.5.2(f)] Revise the water supply protection note to indicate that this parcel is within a water supply
protection area.
12. [32.5.2(1)] Provide the right -of -way and pavement width of Dickerson Road.
13. [32.5.2(1)] Provide the pavement width for the proposed entrance off of Dickerson Road.
14. [32.5.2(1)] Provide the pavement width for the modified entrance off of Bowen Loop along with the
associated travelway width. One -way access aisles must have a minimum 12' width.
15. [32.5.2Q,k,l)] Verify that the location(s) and dimensions of all existing or proposed utilities and utility
easements including water, sewer, drainage, telephone, cable, electric and gas are shown on the
plan. Label any existing easements with the Deed Book and Page Number or the easement number
reference from the Airport Property Map.
16. [32.5.2(m)] Show the distance to the centerline of the nearest existing street intersection from the
proposed ingress and egress location.
17. [32.5.2(n)] Label and dimension any existing walkways.
18. [32.5.2(n)] Show the proposed lighting on the layout, grading, and utility sheets to verify that no site
conflicts exist.
19. [32.5.2(n)] Sign location and design are not reviewed or approved on a Site Plan application; a
separate sign application is required. Please remove all sign design information. Sign locations
should also be removed or labeled as `future sign location to be reviewed and approved with a sign
application'.
20. [32.5.2(n)] Label blank areas around the proposed parking lot with the intended ground
cover /surface treatment.
21. [32.6.1(a)] The site development plan must be sealed, signed and dated by an authorized preparer
(licensed architect, engineer, land surveyor or landscape architect).
22. [32.6.2(f)] Clarify the transition between the existing travelway and the existing parking lot at the
modified entrance off of Bowen Loop; is there curbing along the edge of the parking lot?
23. [32.6.2(h)] Remove one of the `inspections' signature lines from the signature panel.
24. [32.6.20)] Verify that all utilities and utility easements are shown and labeled on the landscape plan;
it appears that some utilities shown on other sheets aren't present.
25. [32.6.20) & 32.7.9.4(a)] Several of the proposed plantings have utility conflicts; move all landscaping
away from existing and proposed utilities and outside of any utility easements. Documentation of
authorization from the easement holder to plant within their easement must be provided for any plants
remaining within easements.
26. [32.6.20) & 32.7.9.4(a)] The plant schedule lists 20 Amelanchier grandiflora but only 18 are shown
on the plan. Similarly, the plant schedule lists 12 Acer rubrum while 14 are shown on the plan.
Clarify and revise if necessary.
27. [32.6.20) & 32.7.9.4(b)] Existing trees may be preserved in lieu of planting new plant materials in
order to satisfy the landscaping and screening requirements of section 32.7.9 or to meet conditions of
approval, subject to the agent's approval. It seems that some of the Landscape Plan requirements
may be proposed to be met with existing vegetation. If this is the case, the landscape plan should
show the trees to be preserved, the limits of clearing, the location and type of protective fencing,
grade changes requiring tree wells or walls, and trenching or tunneling proposed beyond the limits of
clearing. In addition, the applicant shall sign a conservation checklist approved by the agent to insure
that the specified trees will be protected during construction. Except as otherwise expressly approved
by the agent in a particular case, such checklist shall conform to specifications contained in the
Virginia Erosion and Sediment Control Handbook, pp III -284 through III -297, and as hereafter
amended. This checklist must be signed, dated and included on the plans.
28. [32.6.20) & 32.7.9.4(d)] The landscape plan shall verify that it satisfies the minimum landscaping
and screening requirements of Section 32. See comments below.
29. [32.6.20) & 32.7.9.5] Provide a note indicating the number of street trees required and the number
provided.
30. [32.6.20) & 32.7.9.6] Provide a note to demonstrate that an area a minimum of 5% of the paved
parking and vehicular circular area is landscaped in shrubs and trees. See section 32.7.9.6(a) for
additional information.
31. [32.6.20) & 32.7.9.6] Provide a note listing the number of parking lot trees required and the number
provided. See section 32.7.9.6(b) for additional information.
32. [32.6.20) & 32.7.9.8] The tree canopy requirement for this site is 10 %; provide information to verify
that this requirement is being met.
33. [32.6.20)] ARB approval of the landscape plan is required.
34. [32.6.2(k) & 4.17] Light poles are shown on the landscape plan, but no photometric plan is included
in the plan set. A complete lighting plan including photometric information, a luminaire schedule, and
legible cutsheet(s) must be submitted for review. The lighting plan must also be reviewed and
approved by the ARB.
35. [Comment] If any off -site easements are required, they must be recorded prior to site plan approval.
36. [Comment] This amendment cannot be approved until all comments from the Site Review
Committee (SRC) have been addressed. Any comments not available at the time of the SRC
meeting will be forwarded once received.
Staff has provided references to provisions of Chapter 18 of the Code of the County of Albemarle. The
Code is kept up to date by the County Attorney's office. The Code may found on the County Attorney's
website which may be found under "Departments and Services" at Albemarle.org.
In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to submit
a revised final site plan to address all of the requirements within six (6) months after the date of this letter
the application shall be deemed to have been voluntarily withdrawn by the developer.
If you have any questions about the comments please feel free to contact me.
Sincerely,
L L CJ. (2ab
Ellie Carter Ray, CLA
Senior Planner
Planning Division