HomeMy WebLinkAboutSDP201300042 Review Comments Final Site Plan and Comps. 2014-04-04�� OF A
i"
A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: New Hope Church — Site Plan SDP201300042
Plan preparer: Blackwell Engineering [fax 540- 349 -0321]
Owner or rep.: New Hope Community Church; Michael Henderson Trustee
Plan received date: 26 March 2014
Date of comments: 4 April 2014
Reviewer: Max Greene
The Site plan (SDP201300042) submitted 26 March 2014 has received Engineering Review
and does not appear to meet Albemarle County minimum checklist items for approval. The
following items will be adequately addressed prior to Final Site Plan approval.
1. Site Plan:
a. Final site plan appears to match the phase 1 proposal from the approved Initial
Site Plan. No additional comments at this time.
2. Stormwater Management Plan:
a. A SWM Plan, Application and Fee are required.
b. Forebay does not appear to meet the minimum requirements of the State
Stormwater Management Handbook.
3. Erosion and Sediment Control Plan:
a. An E &SC plan, Application and fee are required. The Early Grading plan needs
to be replaced as stated in the Early grading Approval Letter dated 24 September
2013.
Once these comments have been addressed, please submit 3 copies of the revised plans, calculations, and
narratives to Current Development Engineering along with the required review fee and transmittal form.
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review
comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene @albemarle.org to
schedule an appointment.
[17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be
included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the
omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as
provided under paragraph (B).
File: CDDEl- sdp -MRG -New Hope Church.doc