Loading...
HomeMy WebLinkAboutARB201300185 Review Comments Final Site Plan and Comps. 2014-03-18• ^�- 11�illr IlIIf1.�• COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 March 18, 2014 Maggie Hennessy Hazen & Sawyer, P.C. 4011 Westchase Blvd Suite 500 Raleigh, NC 27607 RE: ARB- 2013 -185: GAC Upgrade for Crozet Water Treatment Plant Dear Ms. Hennessy, I have reviewed the drawings with revision date of March 3, 2014 submitted for the above - referenced project and I have the following comments. 1. The wall fixturehas been changed to a full cutoff style; however, the previously proposed fixture is still listed in the luminaire schedule. The luminaire schedule and photometrics should correspond to the proposed fixture. Please revise the drawings accordingly 2. Lighting specs were submitted to show that dark bronze is the color selected for the wall fixtures, in lieu of adding the note to the luminaire schedule. The note does not have to be in the luminaire schedule, but it does need to be a part of the site plan, as does the fixture cut sheet. Since the luminaire schedule appears on a separate sheet of the site plan, it is recommended that that sheet be revised to include the color note and the fixture cut sheet. Please provide: 1. One set of revised sheets addressing these conditions. Include updated revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff s review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner cc: Albemarle County Service Authority, 168 Spotnap Road, Charlottesville VA 22911 File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Margaret Maliszewski DATE: PROJECT NAME: ARB- 2013 -185: GAC Upgrade for Crozet Water Treatment Plant Submittal Type Requiring Revisions ( ) indicates submittal Cade County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 1 Margaret Maliszewski Waiver Request WR Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA Preliminary Site Plan (PSP) Final Site Plan or amendment FSP Final Plat (FP) Preliminary Plat PP Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2013 -185 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 1 Margaret Maliszewski