Loading...
HomeMy WebLinkAboutSP201400002 Review Comments Special Use Permit 2014-04-04Ar!"I l' Ilu"- R � O se COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 April 4, 2014 Christopher Mantle 301 East High St Charlottesville, VA 22902 cmantle @mckeecarson.com RE: SP 2014 -00002 Montessori Community School Dear Mr. Mantle: Staff has reviewed your initial submittal for the above referenced application for the amendment to the conditions of previously approved special use permit SP2009- 00001. We have a few comments and questions about your proposal. Our comments are listed below. Plannine Comprehensive Plan: Initial comments on how your proposal generally relates to the Comprehensive Plan are provided below. Comments on conformity with the Comprehensive Plan are provided to the Planning Commission and Board of Supervisors as part of the staff report. The removal of fencing requirements and minor amendments to the concept plan do not impact the overall use and character of the site. This use is in conformity with the recommended land use of the Pantops Master Plan of Urban Density Residential, which accommodates institutional uses such as places of worship, public and private schools, and early childhood education centers including day care centers and preschools. Neighborhood Model: Many of the applicable neighborhood model principles were addressed in the 2007 concept plan, particularly with regards to open space, relegated parking and site planning that respects terrain. However, it is not clear to staff if these features are still part of the overall concept- plan-forthe site since- only-the Phase -1 concept site plan-has - been submitted with this amendment. Please clarify if the future phases of development are still part of the plan as well as the previously submitted stormwater management, utilities and tree conservation exhibit dated January 16, 2007. Concept Plan: As noted above, the Concept Plan submitted for this SP amendment only shows Phase 1 of the project. The previously approved SP allows for development of the site in conformity with the January 16, 2007 conceptual plan which shows the phasing and planned improvements for the entire site (4 phases). Is your intention to only update Phase 1 of this concept plan? If so, please provide an updated plan showing the new Phase 1 configuration incorporated with previously approved phases 2 -4 so staff has one reference document for reviewing future development applications. Timeframe for Development: Your previously approved SP requires construction to commence on or before March 11, 2015. Does this timeframe still suit your needs? Zoning The following comments related to zoning matters have been provided by Ron Higgins: No objections. Entrance Corridor: The following comments related to the Entrance Corridor Guidelines have been provided by Margaret Maliszewski: The removal of fences from any phase of the proposed development is not expected to have an impact on the Entrance Corridor. The design of any new fence that is visible from the Entrance Corridor requires the review and approval of the Architectural Review Board. No chain link fence shall be visible from the Entrance Corridor. VDOT The following comments were provided by Troy Austin of VDOT: 1. It appears that the request is primarly for the removal of fencing from the originally approved special use permit for the site 2. Provided that the enrollment and;or site trip generation.does not significantly change, VDOT has no objections to this special use permit. Minor adjustments in building -footprints and locations of proposed buildings on site should not significantly impact the trip generation for the site. RWSA /ACSA The following comments were provided by -Alex Morrison of ACSA: All ACSA comments have been addressed by the applicant. The ACSA hereby approves the plan /document /project described above. The following comments were provided by Victoria Fort for the RWSA: 1. Capacity issues for sewer that may affect this proposal. None Known 2. Requires Rivanna Water and Sewer Authority Capacity Certification. Yes X No 3. Water flow or pressure issues that may affect this proposal. None Known 4. "Red Flags" regarding service provision (Use attachments if necessary). None Known Fire /Rescue The following comments were provided by Robbie Gilmer: No Comments or objections SP Conditions At this point in the review process, we anticipate that amending the previously approved conditions of for the Special Use Permit to remove requirements for fencing and stipulate that no chain link fence shall be visible from the Entrance Corridor and all future fencing visible from the Entrance Corridor require ARB approval. We would like applicant feedback on the desired approach for the conceptual site plan and timeline. Action after Receipt of Comments After you have read this letter, please take one of the actions identified on "Action After Receipt of Comment Letter" which is attached. Resubmittal If you choose to resubmit, please use the attached form. There is no fee for the first resubmittal. The resubmittal date schedule is provided for your convenience. Notification and Advertisement Fees Recently, the Board of Supervisors amended the zoning ordinance to require that applicants pay for the notification costs for public hearings. Prior to scheduling a public hearing with the Planning Commission, payment of the following fees is needed: $106.40 Cost for newspaper advertisement $200.00 Cost for notification of adjoining owners (minimum $200 + actual postage /$1 per owner after 50 adjoining owners) $306.40 Total amount due prior to Planning Commission public hearing Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the Board hearing is needed: $106.40 Additional amount due prior to Board of Supervisors public hearing $412.80 Total amount for all notifications Fees may be paid in advance. Payment for both the Planning Commission and Board of Supervisors public hearings may be paid at the same time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of anew date. Feel free to contact me if you wish to meet or need additional information. I can be reached at rfalkenstein @albemarle.org or 434 - 296 -5832, ext. 3272. Sincerely, Rachel Falkesntein Senior Planner Planning Division enc: Action After Receipt of Comment Letter Legal Ad Payments and Public Hearings Resubmittal Schedule Resubmittal Form DEPARTMENT OF COMMUNITY DEVELOPMENT ACTION AFTER RECEIPT OF COMMENT LETTER Within 30 days of the date of this letter, please do one of the following: (1) Resubmit in response to review comments (2) Request indefinite deferral (3) Request that your Planning Commission public hearing date be set (4) Withdraw your application (1) Resubmittal in Response to Review Comments If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date as published in the project review schedule. The full resubmittal schedule may be found at www.albemarle.org in the "forms" section at the Community Development page. Be sure to include the resubmittal form on the last page of your comment letter with your submittal. The application fee which you paid covers staff review of the initial submittal and one . resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) (2) Request Indefinite Deferral If you plan to resubmit after 30 days from the date of the comment letter, you need to request an indefinite deferral. Please provide a written request and state your justification for requesting the deferral. (Indefinite deferral means that you intend to resubmit /request a public hearing be set with the Planning Commission after the 30 day period.) (3) Request Planning Commission Public Hearing Date be Set At this time, you may schedule a public hearing with the Planning Commission. However, we do not advise that you go directly to public hearing if staff has identified issues in need of resolution that can be addressed with a resubmittal. After outstanding issues have been - resolved -and or when you- are-ready to request a public hearing, staff will set your public hearing date for the Planning Commission in accordance with the Planning Commission's published schedule and.as mutually agreed by you and the County. The staff report and recommendation will be based on the latest information provided by you with your initial submittal or resubmittal. Please remember that all resubmittals must be made on or before a resubmittal date. By no later than twenty -one (21) days before the Planning Commission's public hearing, a newspaper advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule) Your comment-letter will contain the actual fees you need to pay. Payment for an- additional newspaper advertisement is also required twenty -two (22) days prior to the Board of Supervisors public hearing. These dates are provided on the attached Legal Ad Payments for Public Hearings form. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that have not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. (4) Withdraw Your Application If at any time you wish to withdraw your application, please provide your request in writing. Failure to Respond If we have not received a response from you within 30 days, we will contact you again. At that time, you will be given 10 days to do one of the following: a) request withdrawal of your application, b) request deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of these choices is made within 10 days, staff will schedule your application for a public hearing based on the information provided with your original submittal or the latest submittal staff received on a resubmittal date. Fee Payment Fees may be paid in cash or by check and must be paid at the Community Development Intake Counter. Make checks payable to the County of Albemarle. Do not send checks directly to the Review Coordinator. FEE SCHEDULE FOR ZONING APPLICATIONS A. For a special use permit: 1. Additional lots under section 10.5.2.1; application and first resubmission Fee...:........................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 2. Public utilities; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ...........:................... ........................$500.00 3. Day care,center; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 4. Home occupation Class B; application and first resubmission Fee............................................................................ .................:............. ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 5. 5. Amend existing special use permit; application and first resubmission Fee.......................................................................:.... ............................... ..................:...$1,000.00 Each additional resubmittaI ....................................... ............................... ........................$500.00 6. Extend existing special use permit; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 7. All other special use permits; application and first resubmission Fee............................................................................ ............................... ......................$2,000.00 Each additional resubmittal ........................................................... ............................... $1,000.00 8. Deferral of scheduled public hearing at applicant's request Fee............................................................................. ............................... ........................$180.00 B. For amendment to text of zoning ordinance: Fee................................................................................... ............................... .......................$1000.00 C. Amendment to the zoning map: 1. Less than 50 acres; application and first resubmission Fee............................................................................ ............................... ......................$2,500.00 2. Less than 50 acres; each additional resubmission Fee............................................................................ ............................... ......................$1,250.00 3. 50 acres or greater; application and first resubmission Fee............................................................................ ............................... ......................$3,500.00 4. 50 acres or greater; each additional resubmission Fee............................................................................ ............................... ......................$1,750.00 5. Deferral of scheduled public hearing at applicant's request Fee......................:................................................. ..............................I .... ........................$180.00 D. Board of Zoning Appeals: 1. Request for a variance or sign special use permit Fee.............................................................................. ............................... .......................$500.00 2. For other appeals to the board of zoning appeals (including appeals of zoning administrator's decision) — Fee (to be refunded if the decision of the zoning administrator is overturned) .......$240.00 hT. Required notice: 1. Preparing and mailing or delivering up to fifty (50) notices: Fee............................................................................. ............................... ........................$200.00 plus the actual cost of first class postage 2. Preparing and mailing.or delivering, per notice more than fifty (50): Fee............................................................................... ............................... ..........................$1.00 plus the actual cost of first class postage 3. Published notice: Fee.............................................................................. ............................... .........................Actual cost Legal Ad Payments and Public Hearings Planning Commission Public Hearing Board of Supervisors Public Hearing Payment Deadline Legal Ad Run 1 Legal Ad Run 2 PC Date 12/23/13 12/30/13 1/6/14 1/14/14 1/6/14 1/13/14 1/20/14 1/28/14 1/13/14 1/20/14 1/27/14 2/4/14 2/3/14 2/10/14 2/17/14 2/25/14• 2/10/14 2/17/14 2/24/14 3/4/14 2/24/14 3/3/14 3/10/14 3/18/14 3/10/14 3/17/14 3/24/14 411/14 3/31/14 4/7/14 4/14/14 4122/14 4114114 .4/21/14 4/28/14 5/6/14 4/28/14 5/5114 5/12/14 5/20/14 5/12/14 5/19/14 5/26/14 6/3/14 5126114 6/2/14 6/9/14 6/17/14 6/23/14 6/30/14 7/7/14 7/15/14 7/7/14 7/14/14 7/21/14 7/29/14 7/14/14 7/21114 7/28/14 8/5/14 7/28/14 8/4/14 8/11/14 8/19/14 8/18/14 8/25/14 9/1/14 9/9/14 911114 9/8/14 9/15/14 7/23/14 9/15/14 9/22/14 9/29/14 10/7/14 9/29/14 10/6/14 10/13/14 10/21/14 10/13/14 10/20/14 10/27/14 11/4/14 10/27/14 11/3/14 11/10/14 11/18/14 11/17/14 11/24/14 12/1/14 12/9/14 11/24/14 12/1/14 12/8/14 12/16/14 Bold Italics denotes a change due to a County holiday 12/10/2013 Payment Deadline Legal Ad Run 1 Legal Ad Run 2 BOS Date 12/16/13 12/23/13 12/30/13 1/8/14 12/23/13 12/30/13 1/6/14 1/15/14 1/13/14 1/20/14 1/27/14 2/5/14 1120114 1/27/14 2/3/14 2/12/14 2/10/14 2/17/14 2/24/14 3/5/14 2117114 2/24/14 3/3/14 3/12/14 3/10/14 3/17/14 3/24/14 4/2/14 3/17/14 3/24/14 3/31/14 4/9/14 4114114 4/21/14 4/28/14 5/7/14 4/21/14 4/28/14 5/5/14 5/14/14 5/12/14 5/19/14 5/26/14 6/4/14 5/19/14 5/26/14 6/2/14 6111/14 6/9/14 6/16/14 6/23/14 7/2/14 6/16/14 6/23/14 6/30/14 7/9/14 7/14/14 7/21/14 7/28/14 8/6/14 7/21/14 7/28/14 8/4/14 8/13/14 8/11/14 8118/14 8/25/14 9/3/14 8/18/14 8/25/14 9/1/14 9/10/14 9/8/14 9/15/14 9/22/14 10/1/14 9/15/14 9/22/14 9/29/14 10/8/14 10/13/14 10/20/14 10/27/14 11/5/14 10/20/14 10/27/14 11/3/14 11/12/14 11/10/14 11/17/14 11124/14 12/3/14 11/17/14 11/24/14 12/1/14 12/10/14 2014 Submittal and Review Schedule Special Use Permits and Zoning Map.. Amendments. Resubmittal Schedule. Written Comments.and Earliest Planning Commission Public Hearing* Resubmittal Dates Comments to applicant for decision on whether: to proceed to Public Hearing'* Request for PC Public Hearing / Legal Ad Payment Due`** Planning Commission Public Hearing No sooner tha:n'` COB Auditorium Monday Wednesday Monday Tuesday 06" 20!;3 WDe614 2013 Dec 23 2013 _ Jan 14 NOU£18 2D13 ; `_ ec 1`8;32013 Jan 06 Jan 28 Dec 2.201:3 k Tue DecBV 2093 i, `` Jan 06 Jan 28 . Deo 16 "2013 Jan 15 Feb 03 Feb 25 Jan 06 Feb 05 Feb 10 Mar-04 Tue Jan:2.1 Feb 19 Feb 24. Mar 1:8 Feb 03 Mar 05 Mar 10 Apr 01 .Tue Feb 18 Mar 19 :Mar 31 Apr22' Mar 03 Apr 02. Apr 14 May 06 Mar 17 Apr 16 Apr 28 May,20 Apr:07 _ May 07 May 12 _ Jun 03 Apr 21 May 21 May26 Jun 17 May 05 Jun04 Jun::23 Jul 15 Ma 19 Jun 1.8 Jun.23 Jul 15 Jun 02 Ju102 Jul 07, Ju129 Jun 16 Jul 16 Jul 28 Aug 19 Jul 07 Aug 06 Aug 18: Sep 09 Jul 21 Aug 20 :Tue Sep 02 Sep: 23 Aug 04 Sep. 03 Sep 15' Oct.07 Aug 18` Se 17 Sep 29. Oct 21 Tue Sep 02 Oct 01 Oct 13 NoviO4 Sep 15 Oct 15 Oct :27 Nov 18 Oct 06 Nov::05 Nov1:7 Dec 09 Oct 20 Nov 19 Nov 24 Dec 16 Nov 03 - Dec 03 Dec 22Jan 132015 :yl Nov 17 Dec 17 Dec 22�Jan Dec 01 Dec 31 pin-,27, .5, Dec 15 K . , °';Jan 145201.5 ,,Feb 2w2Q1`, �Feb,24 "2 .,r Jan,05,2015x Feb420�1Y Feb 9x2015 Mar-`032015 ...r Bold italics = submittallmeeting.dayis different.due to a hofida . Dates,OtWad iji k`'r ndrare notr2D:14 _.� .,...; .._.... :fix ' W ` ... & 2015 dates-are tentative. *The reviewing planner will contact applicant to discuss comments =of reviewersand advise that changes that are needed are significant enough:towarrant ar:additionol submittal or advise.that:the the project is ready:for a public Bearing. if changes needed: are minor, the'.planner willsdvise that the project ggto public hearing.. - The ,legal;ad deadline`.isahe last.date at. which' an applicant can decide:whether-taresubmit or go to public hearing. If an applicant decides to go.:'to.public hearing "'against the advice of the reviewing'planner. a' recommendation for denial will likely result. Generally; the applicant:will will have:onty one opportunity to defer the PC:public_hearing for.the. project once it has b6en:advertised for public hearing, deferrals:will.not tie allowed except in extraordinary circumstances such as:a °major change in1he project proposal by the applicant or more'. issues identified bystaff that. have not previously been brought to.the applic antis: attention. FOR OFFICE USE ONLY SP # or ZMA # Fee Amount $ Date Paid By who? Receipt # Ck# By: Resubmittal of information for Special Use Permit or 6 Zoning Map Amendment PROJECT NUMBER: SP2014 -00002 PROJECT NAME: Montessori Community School ❑ Resubmittal Fee is Required ❑ Per Request Resubmittal Fee is Not Required Rachel Falkenstein Community Development Project Coordinator gmu Z, 11q 1q Signature I Date Montessori Community School c/o Christopher Mantle 434- 979 -7522 Name of Applicant Phone Number Signature FEES Date Resubmittal fees for Special Use Permit -- original Special Use Permit fee of $1,000 First resubmission FREE ❑ Each additional resubmission $500 Resubmittal fees for original Special Use Permit fee of $2,000 ❑ First resubmission FREE ❑ Each additional resubmission $1,000 Resubmittal fees for original Zoning Map Amendment fee of $2,500 ❑ First resubmission FREE ❑ Each additional resubmission $1,250 Resubmittal fees for original Zoning Map Amendment fee of $3,500 ❑ First resubmission FREE ❑ Each additional resubmission $1,750 ❑ Deferral of scheduled public hearing at applicant's request — Add'1 notice fees will be required I $180 To be raid after staff review for public notice: Most applications for Special Use Permits and Zoning Map Amendment require at least one public hearing by the Planning Commission and one public hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing a legal advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice are required before a Zoning Map Amendment may be heard by the Board of Supervisors. The total fee for public notice will be provided to the applicant after the final cost is determined and must be paid before the application is heard by a public body. u _ .� .I / A u �/7�`/►/ 11►YW.1%1[41110111 URI I_WIN 11:123 Ell go I-Wo IEK111WO 9:3R Preparing an d mailing or delivering up to fifty (50) notices $200 + actual cost of first -class postage Preparing and mailing or delivering each notice after fifty (50) $1.00 for each additional notice +actual cost of first -class postage Legal advertisement (published twice in the newspaper for each public hearing) _ Actual cost (minimum of $280 for total of 4 publications) County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 6/7/2011 Page 1 of 1