COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Festiv fare WP0201400013
Plan preparer: Meridian Planning Group [tmiller @merdianwbe.com]
Owner or rep.: TREM COMMERCIAL RENTALS LLC
Plan received date: 21 February 2014
Date of comments: 21 October 2013
Reviewer: Max Greene
The Erosion & Sediment Control Plans (WP0201400013) submitted 21 February 2014 has received
Engineering Review and appear to meet Albemarle County minimum checklist items for engineering
approval. Please submit 2 additional copies of the plan for approval stamp and distribution during the pre -
construction meeting.
The forms and instructions to request the Water Protection Ordinance Bond amount can be found on the
Community Development Department Web site at
http:// www .albemarle.org /upload/images /forms center /departments /Community Development/forms /bond
sBond_ Estimate _Request _Form.pdf
The County requires a Stormwater ManagementBMP Facilities Maintenance Agreement document
recorded with the "Clerk of Circuit Court".
Please use the following links for the SWM agreement and procedures:
http:/ /www. albemarle. org /upload /images /forms_ center / departments /Community_ Development /forms /Engi
neering and WPO Forms/Plan Review -
_Stormwater_ Management _BMP_ Facilities _ Maintenance—Agreement _Procedures.pdf
http:/ /www. albemarle. org /upload /images /forms_ center / departments /Community_ Development /forms /Engi
neering and WPO Forms/Plan Review -
_Stormwater_ Management _BMP_ Facilities _ Maintenance_Agreement.pdf
You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246
for further information on bonding procedures and Maintenance Agreements.
Once the E &SC bond has been posted and the SWM agreement recorded, you may contact the Department
of Community Development to arrange a pre - construction meeting with a County Erosion & Sediment
Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for
additional control measures required to protect the site, additional fees will be required.
[17- 204.G] An approved erosion and sediment control plan shall be void if the owner fails to obtain a grading, building, or other
permit for activities involving land disturbing activities within one (1) year after the date of the approval.
File: E &SC Approval letter.doc