HomeMy WebLinkAboutSDP200700111 Review Comments Letter of Revision 3 2014-04-17•
�_ illy IIIII�.
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
April 17, 2014
Haden Place, LLC
706 Rose Hill Drive
Charlottesville VA 22903
RE: Letter of Revision (LOR) # 3 for SDP - 2007 -111 Revised Final Site Plan of Haden Place.
Dear Sir,
This letter is in response to the attached LOR request letter dated March 13, 2014. The
Department of Community Development hereby grants approval of a LOR for the improvements
described in the letter and shown on the attached sheets (T1, S2, S3, and S5) on plans dated 3 -20-
14.
The current proposal modifies the previously approved site plan by removing the 3 way stop sign
intersection of Haden Way (state rd) and Haden Lane (state rd), installing a proposed power pole
on Haden Lane (state rd), expanding an island on Haden Lane to capture existing power pole,
removing steel bollard barricade at intersection of Haden Way (state rd) and Killdeer Lane (state
rd), add detail for Road Widening of Haden Lane(state rd), reduction in median strip width on
Haden Place (private rd) to allow for Fire and Rescue clearance requirements, also install no
parking signage on fire lane alley to allow for Fire and Rescue clearance requirements, Haden
Place (private rd) Island Roundabout CG2 instead of EOP, specify CG2 in place of CG3 along
Haden Alley (private alley), revised ST23 to grate top structure, install crosswalk striping at all
locations to stop bars, add split -rail fences above stormwater management facility, swap the
playground and green garden lot in open space D and E.
This is the 3rd LOR for this site. A total of three (3) LORs are allowed before all changes to
the plan are required to be submitted in the form of a site plan amendment.
Sincerely,
Christopher P. Perez
Senior Planner
Attachments: Letter of Request — March 13, 2014
Summary of Proposed Revisions- March 17, 2014
Approved Revised Final Site Plan/LOR #3
Copy: MSC c/o Trey Steigman
Rebecca Ragsdale — Permit Planner
SDP - 2007 -111
Application for
Letter of Revision
Final Site Plan Name and Number: Haden Place
Letter of Revision = $100
SDP200700111
�YrmN�Pf
.�c`t °� atr��,
�
Contact Person (Who should we call /write concerning this project ?): Trey Steigman, Vice President, Development
Address c/o: MSC, P.O. Box 5306 City Charlottesville State VA Zip 22905
Daytime Phone 43 977 -4181 xl05Fax# 43 295 -8025 E -mail tsteigman @msc— rents.com
OtivnerofRecord Haden Place, LLC
Address
706 Rose Hill Drive
City Charlottesville
State VA Zip 22903
Daytime Phone 43 293 -4542 Fax# (_� E -mail wwghomes@aol.com
Applicant (Who is the Contact person representing ?): Haden Place, LLC
Address 706 Rose Hill Drive
Daytime Phone (43!� 293 -4542 Fax C__)
City Charlottesville State VA Zip 22903
SUBMITTAL REQUIREMENTS:
[0 The appropriate fee,
N The site plan number that the change applies to,
® A request letter describing the proposed changes from the owner or authorized agent,
0 4 copies of the plan that shows the proposed changes,
E -mail wwqhomes@aol.com
Changes must be shown on the sheet or sheets from the approved final site plan, or on an 1 I" X l7" copy of that portion of the
approved final site plan.
Owner /Applicant Must Read and Sign
I hereby certify that the information provided on this application and accompanying information is accurate, true and correct to the best of
my knowledge, pd belief -
Signature of Owner, Agent Date
Wendell W. Gibson, Member
Print Name Haden Place, LLC
FOR OFFICE USE ONLY
Amount$J(J�) DatePaidJ -
LOR #
(434) 293 -4542
Daytime phone number of Signatory
L
#�- 4`02 C0 1�924
County of Albemarle
Department of Community Development
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126
1/1/2013 Page 1 of 1
Haden Place
Final Site Plan — LOR #3
SDP - 2007 -111
Summary of Proposed Revisions — March 17, 2014
1. Remove three (3) way stop sign intersection on Haden Lane — VDOT 10/17/2012
2. Add overhead utility lines pole at intersection on Haden Lane — VDOT 10/17/2012
3. Expand /shift island on Haden Lane to capture existing overhead utility lines pole — VDOT 10/17/2012
4. Remove steel bollard barricade, allow Phase B parking and sidewalk on Killdeer Lane — VDOT 10/17/2012.
5. Haden Lane — Road Widening — S5 — detail additions — VDOT 2/14/2013 & 3/18/2013
6. . Haden Place median strip adjustment, fire lane alley no parking signage addition — ACFR 3/26/2013
7. Haden Place — Island Roundabout — specify CG -2 in place of EOP — 5/2/2013
8. Haden Alley - specify CG -2 in place of CG -3 — 6/14/2013
9. ST 23 — revise to grate top structure — VDOT 9/10/2013
10. Install cross -walk striping at all locations of stop bars — VDOT 9/10/2013
11. Add split -rail fence above stormwater management facility — ACCD 9/13/2013
12. Playground — relocation to Open Space D — 3/12/2014