Loading...
HomeMy WebLinkAboutSUB201400063 Review Comments Preliminary Plat 2014-05-20COMMONWEALTH of VIRQINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner May 20, 2014 Mr. Christopher Perez Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SUB- 2014 -00063 Fontana Phase 4C Preliminary Plat Dear Mr. Perez: We have reviewed the preliminary plat for Fontana, Phase 4C dated 11/21/08 with revisions dated 416110, 6117110, 1120111, 6125112, 11114112, 1116/13 and 417114 as submitted by Terra Engineering and Land Solutions PC and offer the following comments: 1. Storm sewer calculations and open channel calculations need to be provided for review. 2. Profiles for the storm sewer need to be submitted for review. 3. Pavement design calculations need to be provided for review. 4. VDOT expects that there will be on- street parking on each of these roads. The typical section should be revised to accommodate this condition. 5. The intersection sight lines need to be shown at each of the street connections in accordance with the Road Design Manual. 6. There appears to be 2 parallel storm sewers along the frontage of lots 19 through 22. What is the purpose of the second storm sewer? 7. It appears that the storm sewer along Brunello Court will be in conflict with the proposed street trees. This situation needs to be corrected. 8. Standard CD -1's are required at each location along the roadway that the section goes from a cut to a fill section. Per the profile for Brunello Court, there are several locations that this occurs and the CD -1's should be shown on the profile. 9. The outlet for the detention pond is to a proposed storm sewer manhole located in the roadside ditch along Via Florence Road. This manhole should be located outside of the ditch. Additional detail is needed on this outlet as it relates to the roadside ditch and the right -of -way. Most of these items typically will be addressed with the road plan submittal. If you need additional information concerning this project, please feel free to contact me. Sincerely, //UV ha,�; Troy Austin, P.E. Area Land Use Engineer Culpeper District WE KEEP VIRGINIA MOVING