Loading...
HomeMy WebLinkAboutWPO201400021 Review Comments Erosion Control Plan 2014-04-30i" ,. `IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Riverside Village — Early Grading Plan WP0201400021 Plan preparer: Shimp Engineering [Justin @shimp - engineering.com] Owner or rep.: GORDONSVIL,LE REALTY INVESTMENTS INC Plan received date: 18 April 2014 Date of comments: 30 April 2014 Reviewer: Max Greene The Early Grading Erosion & Sediment Control Plans (WP0201400021) submitted 18 April 2014 has received Engineering Review and appear to meet Albemarle County minimum checklist items for engineering approval. 2 additional copies of the water protection plans will be submitted for approval and distribution during the pre - construction meeting. The forms and instructions to request the Water Protection Ordinance Bond amount can be found on the Community Development Department Web site at http: / /www. albemarle.org/upload/images/ forms_ center / departments /CommunityDevelopment/f orms/ bonds /Bond_ EstimateReguestForm.pdf You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures. Once the E &SC bond has been posted and the extra copies are received, you may contact the Department of Community Development to arrange a pre - construction meeting with a County Erosion & Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. [17- 204.G] An approved erosion and sediment control plan shall be void if the owner fails to obtain a grading, building, or other permit for activities involving land disturbing activities within one (1) year after the date of the approval. File: E &SC Approval letter.doc i" ,. `IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Riverside Village — Early Grading Plan WP0201400021 Plan preparer: Shimp Engineering [Justin @shimp - engineering.com] Owner or rep.: GORDONSVIL,LE REALTY INVESTMENTS INC Plan received date: 11 March 2014 Date of comments: 9 April 2014 Reviewer: Max Greene The Early Grading Plans (WP0201400021) submitted 11 March 2014 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. The following items will be adequately addressed prior to final Early Grading Plan approval: 1. All topography should be at least visually field verified by the designer within the last year [ 18- 32.6.6, 14 -302, Policy for date] Please state this on the plan. 2. Limit of disturbance appears to run off the page. Please show all areas on the plan. 3. Please show dust controls on the plan. 4. Please note on the plan that it will be critical for the contractor to keep the roadside ditch separate from the site so no off -site water enters the sediment basin #1, or else the basin will need to be enlarged to accommodate the additional drainage area. 5. Please show the stock pile areas for topsoil or state where the topsoil will be taken off - site. 6. Please update management strategies and sequences notes for this site. Appears to be for another site near a fire station. 7. Does site have excess fill or cut material in excess of 10,000 cubic yards? If so, please show or state on plans along with location of waste or borrow area. 8. Please show staging, parking, and/or materials storage areas or other construction related areas on the plan. 9. Please place a sediment trap at the top of DD to catch the runoff from the proposed drainage swale. The drainage swale perpendicular to a diversion will cause the diversion to fail. 10. Please address MS -19 requirements. 11. Please place a note on the plans for the contractor to maintain the drainage divide to the basins as shown on the plans to prevent overloading either basin. 12. Basin #2 needs safety fence and signage. 13. Please show the dewatering snout on the basin details. 14. Please clarify the location and design of the emergency spillways from the basins. 15. Anti -seep collar for sediment basin #1 detail will need to match the calculations. Engineering Review Comments Page 2 of 2 16. Please show the baffles required to achieve the 2:1 inlet to outlet ratio and construction details. 17. Please show a typical section for each temporary channel or diversion, referenced from the plan sheets. Existing ground should be shown at the maximum cross -slope on the plan. 18. VDOT approval for entrance location will be required. Due to requested changes additional comments or conditions may be forthcoming prior to final plan approval. Once these comments have been addressed, please submit 3 copies of the revised plans, calculations, and narratives to Current Development Engineering along with the required review fee and transmittal form. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene @albemarle.org to schedule an appointment. [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: CDDEl_esc_MRG_Riverside Village - Early Grading Plan.doc Riverside Village WPO file number: WP0201400021 Erosion and Sediment Control Bond Estimate Item Item Number stablizatim (PS, TS) sift fence (SF) safety fence (SAF) diversion (DD, FD, RW D) temporary slope drain (TSD) earthwork for trap/basin structures for basin earthwork for trap/basin structures for basin sift fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance pipe length height of dam at toe height of fill at face length of dam tap width (area above transition) (total width of dam) (height below transition (area below transition) (total fill volume) length of spillway width of spillway riser height riser diameter barrel length barrel diameter height of dam at toe height of fill at face length of dam tap width (area above transition) (total width of dam) (height below transition (area below transition) (total fill volume) length of spillway width of spillway riser height riser diameter barrel length barrel diameter length length depth in channel rip -rap, placed depth width survey and layout (price per 0.1 mi.) acres mobilization Stream crossing (computed independently) 0 ft pipe diameter 0 in 8 ft of at high side 14 ft 8 ft cut at face 6 ft 80 ft length of cut 50 ft 8 ft width of cut 50 ft 192 sf (area below transition) 372 sf 16 ft (total width of cut) 90 ft 0 ft (depth below transitior 6 ft 0 sf (area above transition; 296 sf 568.9 cy (total fill volume) 1237.0 cy 55 ft ,TOAL CV estimate) 1427 cy 6 it (spillway stone tons) 253 tons 3.4 it $154,864.50 30 in ., or u,if price) $65.00 47 ft base plate or fall 1 24 in . n t mice) $50.00 barrel collars 1 baffle length 120 ft 6.6 ft of at high side 7 ft 5.6 ft cut at face 3 ft 50 ft length of of 720 ft 8 ft width of cut 40 ft 107.52 sf (area below transition) 136 sf 112 ft (total width of cut) 60 ft 1 ft (depth below transitior 4 ft 5.6 sf (area above transition; 104 sf 2095 . cy (total fill volume) 1075.6 cy 60 ft (TOAL CV estimate) 1145 cy 6 ft (spillway stone tons) 27.6 tons 2.5 ft 30 in ., unit price) $65.00 41 ft base plate or fdn 1 24 in n t mice) $50.00 barrel collars 1 baffle length 140 ft 0 ft width 0 ft 0 ft width 0 ft 0 ft channel width 0 ft 0 ft length 0.0 ft 0.0 (tons) 0 tons 11.64 traps and basins 2 No. Unit Unit Cost Cost 0 (installed) $0.00 11.6 acres $5,000.00 $56,200.00 320.0 ft $5.00 $1,600.00 940.0 ft $5.00 $4,700.00 1760 ft $13.00 $22,860.00 1 $0.00 $0.00 $13.00 $18,551.00 $50.00 $1,265.00 $221.00 $200.00 $200 $2,350.00 $200.00 $200 $50.00 $6,000 $13.00 $14,885.00 $50.00 $1,380.00 $162.50 $200.00 $200 $2,050.00 $200.00 $200 $50.00 $7,000 0 $100.00 $0.00 0 $200.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 0 $2,000.00 $0.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 $60.00 $0.00 $6,820.00 $500.00 $0.00 cost sum $154,864.50 prq mg" $23,229.68 contingency $17,809.42 Total $195,910 4/30/2014 OF ALg vlttcmi� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Riverside Village — Early Grading Plan WP0201400021 Plan preparer: Shimp Engineering [Justin @shimp - engineering.com] Owner or rep.: GORDONSVIL,LE REALTY INVESTMENTS INC Plan received date: 11 March 2014 Date of comments: 9 April 2014 Reviewer: Max Greene The Early Grading Plans (WP0201400021) submitted 11 March 2014 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. The following items will be adequately addressed prior to final Early Grading Plan approval: 1. All topography should be at least visually field verified by the designer within the last year [ 18- 32.6.6, 14 -302, Policy for date] Please state this on the plan. 2. Limit of disturbance appears to run off the page. Please show all areas on the plan. 3. Please show dust controls on the plan. 4. Please note on the plan that it will be critical for the contractor to keep the roadside ditch separate from the site so no off -site water enters the sediment basin #1, or else the basin will need to be enlarged to accommodate the additional drainage area. 5. Please show the stock pile areas for topsoil or state where the topsoil will be taken off - site. 6. Please update management strategies and sequences notes for this site. Appears to be for another site near a fire station. 7. Does site have excess fill or cut material in excess of 10,000 cubic yards? If so, please show or state on plans along with location of waste or borrow area. 8. Please show staging, parking, and/or materials storage areas or other construction related areas on the plan. 9. Please place a sediment trap at the top of DD to catch the runoff from the proposed drainage swale. The drainage swale perpendicular to a diversion will cause the diversion to fail. 10. Please address MS -19 requirements. 11. Please place a note on the plans for the contractor to maintain the drainage divide to the basins as shown on the plans to prevent overloading either basin. 12. Basin #2 needs safety fence and signage. 13. Please show the dewatering snout on the basin details. 14. Please clarify the location and design of the emergency spillways from the basins. 15. Anti -seep collar for sediment basin #1 detail will need to match the calculations. Engineering Review Comments Page 2 of 2 16. Please show the baffles required to achieve the 2:1 inlet to outlet ratio and construction details. 17. Please show a typical section for each temporary channel or diversion, referenced from the plan sheets. Existing ground should be shown at the maximum cross -slope on the plan. 18. VDOT approval for entrance location will be required. Due to requested changes additional comments or conditions may be forthcoming prior to final plan approval. Once these comments have been addressed, please submit 3 copies of the revised plans, calculations, and narratives to Current Development Engineering along with the required review fee and transmittal form. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene @albemarle.org to schedule an appointment. [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: Villua: - Euik G idiny, Han.doc