Loading...
HomeMy WebLinkAboutWPO201400020 Review Comments Bond Estimate 2014-04-30Project Name: Keswick Club - Driving Range Improvements WPO file number: WP0201400020 Erosion and Sediment Control Bond Estimate Item Item Number stablizatim (PS, TS) length channel (SCC, matted) length check dam sift fence (SF) construction entrance (CE) $5,000.00 wash rack 2700.0 ft safety fence (SAF) $13,500.00 rip -rap, placed depth $0.00 diversion (DD, FD, RW D) $13.00 $25,220.00 0 ft $0.00 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in ST -1 earthwork for trap/basin 6 height of dam at toe 2 ft out at high side 12 ft height of fill at face 2 ft cut at face 4 ft length of dam 38 ft length of cut 80 ft tap width 2.5 ft width of cut 20 ft (area above transition) 13 sf (area below transition) 112 sf (total width of dam) 4 ft (total width of cut) 52 ft (height below transition) 0 ft (depth below transitior 8 ft (area below transition) Did (area above transition; 144 sf (total fill volume) 183 cy (total fill volume) 758.5 cy length of spillway 12 ft (TOAL CV estimate) 765 cy width of spillway 20 ft (spillway stone tons) 13.8 tons ST -2 earthwork for traplbasin height of dam at toe 2 ft of at high side 8 ft height of fill at face 2 ft cut at face 4 ft length of dam 46 ft length of cut 60 ft tap width 2.5 ft width of cut 20 ft (area above transition) 13 sf (area below transition) 112 sf (total width of dam) 4 ft (total width of cut) 44 ft (height below transition) 0 ft (depth below transitior 4 ft (area below transition) 0 s (area above transition; 72 sf (total fill volume) 22.1 cy (total fill volume) 408.9 cy length of spillway 18 ft (TOAL CV estimate) 416 cy width of spillway 20 ft (spillway stone tons) 20.7 tons ST -3 earthwork for trap/basin height of dam at toe 2 ft cut at high side 14 ft height of fill at face 2 ft cut at face 4 ft length of dam 39 ft length of cut 130 ft tap width 2.5 ft width of out 20 ft a above transition) 13 st , a. ea below ti -dion) 112 sf (total width of dam) 4 ft (total width of cut) 56 ft (height below transition) 0 ft (depth below transitior 10 ft (area below transition) 0 s (area above transition; 180 sf (total fill volume) 18.8 cy (total fill volume) 1405.9 cy length of spillway 15 ft (TOAL CV estimate) 1412 cy width of spillway 20 ft (spillway stone tons) 17.3 tons ST -4 earthwork for traplbaen height of dam at toe 2 ft cut at high side 6 ft height of fill at face 2 ft cut at face 4 ft length of dam 46 ft length of cut 120 ft tap width 2.5 ft width of cut 20 ft (area above transition) 13 sf (area below transition) 112 sf (total width of dam) 4 ft (total width of cut) 40 ft (height below transition) 0 ft (depth below transitior 2 ft (area below transition) Did (area above transition; 36 sf (total fill volume) 22.1 cy (total fill volume) 657.8 cy length of spillway 18 ft (TOAL CV estimate) 665 cy width of spillway 20 ft (spillway stone tons) 20.7 tons ST -5 earthwork for trap/basin height of dam at toe 2 ft of at high side 8 ft height of fill at face 2 ft cut at face 4 ft length of dam 34 ft length of of 40 ft tap width 2.5 ft width of cut 20 ft (area above transition) 13 sf (area below transition) 112 sf (total width of dam) 4 ft (total width of cut) 44 ft (height below transition) 0 ft (depth below transitior 4 ft (area below transition) 0 s (area above transition; 72 sf (total fill volume) 16A cy (total fill volume) 272.6 cy length of spillway 7 ft (TOAL CV estimate) 278 cy width of spillway 20 ft (spillway stone tons) 8.1 tons ST -6 earthwork for trap/basin height of dam at toe 2 ft of at high side 8 ft height of fill at face 2 ft cut at face 4 ft length of dam 34 ft length of of 35 ft tap width 2.5 ft width of cut 20 ft (area above transition) 13 sf (area below transition) 112 sf (total width of dam) 4 ft (total width of cut) 44 ft (height below transition) 0 ft (depth below transitior 4 ft (area below transition) 0 s (area above transition; 72 sf (total fill volume) 16A cy (total fill volume) 238.5 cy length of spillway 8 ft (TOAL CV estimate) 244 cy width of spillway 20 ft (spillway stone tons) 9.2 tons structures for basin riser height 0 ft riser diameter 0 in (riser unit price) $0.00 barrel length 0 ft base plate or fdn 0 barrel diameter 0 in u t price) $0.00 barrel collars 0 baffle length 0 ft sift fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) $5,000.00 wash rack 2700.0 ft paved construction entrance $13,500.00 rip -rap, placed depth $0.00 width survey and layout (price per 0.1 mi.) acres mobilization Stream crossing (computed independently) No. Unit Unit Cost Cost 0 ft (installed) 0 ft 12.0 acres $5,000.00 $60,000.00 2700.0 ft $5.00 $13,500.00 ft $5.00 $0.00 1940 ft $13.00 $25,220.00 0 ft $0.00 $0.00 0 0 O ft width O ft 0 0 ft width 0 ft O ft channel width O ft 1 1 1 0 0 ft length 0.0 ft 0.0 (tons) 0 tons 12 traps and basins 6 $13.00 $9,945.00 $50.00 $690.00 $13.00 $5,408.00 $50.00 $1,035.00 $13.00 $8,645.00 $50.00 $1,035.00 $13.00 $3,614.00 $50.00 $405.00 $13.00 $3,172.00 $50.00 $460.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $100.00 $0.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $3,500.00 $0.00 $60.00 $0.00 $9,000.00 $500.00 $0.00 4/30/2014 Project Name: Keswick Club - Driving Range Improvements WPO file number: WPO201400020 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed cost sum $165,850.00 prat mg" $24,877.50 contingency $19,072.75 Total $209,810 4/30/2014