Loading...
HomeMy WebLinkAboutWPO201400040 Review Comments Erosion Control Plan 2014-05-28�pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Cash Corner (Howard Property) Verizon Wireless Tier II PWSFI Plan preparer: Justin Yoon, Clark - Nexsen Architecture and Engineering [1331 L Street, NW, Suite 600, Washington, DC 20005, www.clarknexsen.com] Owner or rep.: Alan B. Howard [2176 Lindsay Road, Gordonsville, VA 22942] Stephen Waller, AICP, Verizon Wireless [536 Pantops Center — PMB #405, Charlottesville, VA 22911; stephen- waller&gmail.com Plan received date: 06- May- 201416 April 2014 Date of comments: 28 May 2014 Reviewer: John Anderson A. Stormwater Management Plan - requested 1. Fee /Application for SWM- Please contact reviewer to discuss WPO (stormwater management review) prior to submitting fee, plans, or supporting documentation. Pre - application discussion may limit need or extent of possible revisions. Certain changes will be required under SWM review, and revision prior to initial SWM application submission could save time. There is also a pending date, July 1St, when the regulations will change, and this could affect this project. B. Erosion Control Plan (WP0201400040) 1. Erosion and Sediment Control Plan Narrative, a 12 -p supporting document with Appendix should be numbered. Transfer Erosion and Sediment Control VESCH details, instructions, or measures to the plans. Unless ESC information is included on plan sheets, there is little chance it will be noticed or enacted during construction. 2. Remove or re -title sheet C -4, titled Enlarged Site Plan. Site Plans cannot be approved as part of WPO Application (Also, sect. C., item 1, below). E &S Legend, Sheet C -4A, includes culvert inlet protection (IP) and outlet protection (OP). Please show IP and OP for new 15" entrance pipe located at intersection of access drive and Lindsay Road (sheet C -413, or C -41)). 4. Sheet C -4G, Note 8: "Perform site clearing to the limits shown on the plans." Limits of disturbance are not shown; please show LOD on plans. 5. Identify off -site disposal areas. Identify construction staging area. Identify stockpile locations. 6. Show tree protection (TP) for 14" OAK, sheet C -4C, if tree is to be saved (tree shown near Alan B. Howard deed book information). Engineering Review Comments Page 2 of 3 7. Page 11 of the ESC Plan Narrative states that "Topsoil will be used to help provide a suitable growth medium for vegetation." Please identify topsoil locations, with specific details (spec 3.30, TO). Page 11 also states "Sediment shall be removed and the impoundment restored to its original dimensions when sediment has accumulated to one -half the design depth." This statement appears to relate to a sediment trap or basin not shown on plans. Please clarify. 8. Page 8 of the ESC Plan Narrative states that "During construction, the contractor will divert runoff around disturbed areas to reduce the amount of stormwater which could come into contact with exposed soils. One method of creating a diversion is by installing temporary dike /swales within the area of work." Please identify diversion dikes in plan view that correspond with stated plan to divert runoff during construction. Diverted runoff must release to a sediment trap or basin. 9. Plan views show an 11' -12' wide driveway. Narrative describes a 20 -ft driveway. Please clarify (show access drive 20 -ft wide, or revise narrative). 10. Remove sheets C -5, A -1, but include typical access road cross section elsewhere. C. Site Plan (SDP201400021) 1. Separate from WPO. Site plan may not be approved as part of a WPO. 2. ESC and a SWM Plan must be approved prior to final site plan approval (ESC Plan Review: requested changes, above). 3. Entrance, sheet C -4G: Replace Private Entrance Detail with VDOT Private and Low - Volume Commercial Entrance Detail {ref: VDOT Road Design Manual, Appendix F, Access Management Design Standards for Entrances and Intersections, Section 4, Private and Low Volume Commercial Entrances) Detail, below- Engineering Review Comments Page 3 of 3 Pipe culvert if necessary Ditch flow line Shoulder Entrance details, including widths shown I on this sheet, may be modified to meet specific site requirements as directed or I approved by the Engineer when based on I sound engineering principles. — Edge of Roadway Pavement Roadway Pavement FIGURE 4 -1 PRIVATE ENTRANCE AND LOW VOLUME COMMERCIAL ENTRANCE DETAIL Rev. 1113 4. Sheet C -5: Specify finished material (driveway surface: crusher run, No. 25, No. 26, etc); specify depth of surface (if stone; 1 -2" required). 5. Provide adequate stopping sight distance —ref: VDOT Road Design Manual, Appendix F, Private and Low Volume Commercial Entrances, item 1. Show adequate sight distance for access drive entrance at Lindsay Road, on plans. File: WP0201400040 -cash corner (howard property) Verizon- 052814 12 FT. Minimum; 24 F1. Maximum Width Surfaced 10 o o d 16 Ft. Minimum Width Y m Graded " R =20' Minimum a 1-2 ° 3 m Ld '6-a — Edge of Roadway Pavement Roadway Pavement FIGURE 4 -1 PRIVATE ENTRANCE AND LOW VOLUME COMMERCIAL ENTRANCE DETAIL Rev. 1113 4. Sheet C -5: Specify finished material (driveway surface: crusher run, No. 25, No. 26, etc); specify depth of surface (if stone; 1 -2" required). 5. Provide adequate stopping sight distance —ref: VDOT Road Design Manual, Appendix F, Private and Low Volume Commercial Entrances, item 1. Show adequate sight distance for access drive entrance at Lindsay Road, on plans. File: WP0201400040 -cash corner (howard property) Verizon- 052814