Loading...
HomeMy WebLinkAboutSP201400012 Review Comments Special Use Permit 2014-06-06COUNTY OF ALSEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 June 6, 2014 David Mitchell 2619 Hydraulic Rd Charlottesville, VA 22901 dmitchell @gemc.com RE: SP 2014 -00012 Westgate /Barclay Dear Mr. Mitchell: Staff has reviewed your initial submittal for the above referenced application for the amendment to the conditions of previously approved special use permit SP1994 -18. We have a few comments regarding your proposal which are listed below. Planning Initial comments on how your proposal generally relates to the Comprehensive Plan and Neighborhood Model are provided below. Comments on conformity with the Comprehensive Plan and Neighborhood Model are provided to the Planning Commission and Board of Supervisors as part of the staff report. Comprehensive Plan:, The relocation of existing office space does not impact the overall use and character of the site. This use is in conformity with the recommended land use of the Places29 Master Plan of Urban Density Residential, which calls for multifamily and single - family residential with a desired density.between 6.01 and 34 units per acre. Secondary uses desired within Urban Density Residential include retail, commercial, and office uses that support-the neighborhood. Neighborhood Model: The apartment complex was constructed prior to the establishment of the Neighborhood Model and-the limited scope of the proposed amendment does not warrant full consideration of the Neighborhood Model Principles. Existing Neighborhood Model principles on site such as Mixture of Housing Types and Affordability and Pedestrian Orientation are not expected to be impacted by the proposed office relocation. The principle of relegated parking is not fully addressed by the office relocation. The proposed office will use a portion of existing parking fronting on Hydraulic Road. Though this parking area already exists, other options for parking should be considered or opportunities for screening the parking. Visibility of parking as well as the principle of Buildings and Space of Human Scale will be addressed by the required ARB application for the building expansion. Zoning The following comments related to zoning matters have been provided by Ron Higgins: 1. Site is in Entrance Corridor overlay district. Building additions will require ARB approval. .2. Office space appears to be reduced with parking remaining the same. This should be verified (total sq. ft. of office use and parking required). 3. Indicate number of dwelling units recovered and the resulting total for the PRD complex (not to exceed 35 dwelling units /acre). Entrance Corridor: The following comments related to the Entrance Corridor Guidelines have been provided by Margaret Maliszewski: 1. The existing development predates the establishment of the Hydraulic Road Entrance Corridor. The development does not meet several of the EC guidelines, including those related to frontage tree spacing and location, and the use of retaining walls (a-tall concrete retaining wall fronts the corridor along most of the property's frontage). The mature trees in the development are a positive contribution to the appearance of the site, but it appears that an addition to #2617 in the location illustrated will require the removal of at least one of those mature trees. An alternate location-for the addition that would not eliminate-trees could result in a more appropriate appearance for the EC and is recommended. Alternatively, replacement trees could be planted in locations close to the Hydraulic Road frontage in the general vicinity of the tree to be removed, but planting area appears-to be limited. 2. ARB review and approval will be required for the addition in-the location. shown. Compatibility with-the surroundings will be a requirement. ENGINEERING The following comments related to engineering matters have been provided by John Anderson: Engineering does not object to proposal, but notes that Water Protection Ordinance (WPO) requirements apply since proposal will increase impervious area. Calculation of pre- and post - development stormwater runoff is required (see AC Code Ch. 17). Identifying options that meet WPO requirements may be challenging in this instance, yet possible options include converting existing impermeable areas to a more pervious state, or utilizing existing SWM facilities if possible. Please accept notification that approved VSMP plans are requisite to obtain site plan (or site plan amendment) approval. VDOT Comments from Troy Austin of VDOT are attached. RWSA /ACSA The following comments were provided by Alex Morrison of ACSA: All ACSA comments have been addressed by the applicant. The ACSA hereby approves the plan /document /project described above. The following comments were provided by Victoria Fort-for the RWSA: 1. Capacity issues for sewer that may affect this proposal. None Known 2. Requires Rivanna Water and Sewer Authority Capacity Certification. Yes X No 3. Water flow or pressure issues that may affect this proposal. None Known 4. "Red Flags" regarding service provision (Use attachments if necessary). None Known Fire /Rescue The following comments were provided by Robbie Gilmer: No Comments or objections. SP Conditions The following SP Conditions were approved with SP 94 -18: 1. Use shall be limited to_2619 and 2621 Hydraulic Road plus addition shown on Attachment C, dated 5 /17/94 and initialed by D.D. F. (copy attached) -2. Additional shall be of similar fagade to the existing building 3. Use shall be limited to property management service. At-this point in the review process, we anticipate recommended conditions of approval-for the Special Use Permit will provide an update of the. previous conditions. Additional information will be forthcoming regarding SP conditions. Action after "Receipt of Comments After you have read this letter, please take one of the actions identified on "Action After Receipt of Comment Letter" which is attached. Resubmittal If you choose to resubmit, please use the attached form. There is no fee for the first resubmittal. The resubmittal date schedule is provided for your convenience. Notification and Advertisement Fees Recently, the Board of Supervisors amended the zoning ordinance to require that applicants pay for the notification. costs for public hearings. Prior to scheduling a public hearing with the Planning Commission, payment of the following fees is needed: • $200.00 Cost for notification of adjoining owners (minimum $200 + actual postage /$1 per owner after 50 adjoining owners) • Cost for newspaper advertisement will be forthcoming. Newspaper advertisements are required for both Planning Commission and Board of Supervisor's public hearing. Total amount for all notifications will be forthcoming, pending advertising costs from Daily Progress. Fees may be paid in advance. Payment for both the Planning Commission and Board of Supervisors public hearings may be paid at the same time. Additional notification fees will not be required unless a deferral takes place and adjoining owners need to be notified of a new date. Feel free to contact me if you wish to meet or need additional information. I can be reached at rfalkenstein @albemarle.org or 434 - 296 -5832, ext. 3272. Sincerely, - Rachel Falkenstein Senior Planner Planning Division enc: Action After Receipt of Comment Letter Legal Ad Payments and Public Hearings Resubmittal Schedule Resubmittal Form DEPARTMENT OF COMMUNITY DEVELOPMENT ACTION AFTER RECEIPT OF COMMENT LETTER Within 30 days of the date of this letter, please do one of the following: (1) Resubmit in response'to review comments (2) Request indefinite deferral (3) Request that your Planning Commission public hearing date be set (4) Withdraw your application (1) Resubmittal in Response to Review Comments If you plan to resubmit within 30 days, make sure that the resubmittal is on or before a resubmittal date as. published in the project review schedule. The full_ resubmittal schedule may be found at www.albemarle.org in the "forms" section at the Community Development page. Be sure to include the resubmittal form on the last page of your comment letter with your submittal. The application fee which you paid covers staff review of the initial submittal and one resubmittal. Each subsequent resubmittal requires an additional fee. (See attached Fee Schedule.) (2) Request Indefinite Deferral If you plan to resubmit after 30 days from the date of the comment letter, you need-to request an indefinite deferral. Please provide a written request and state.your justification for requesting the deferral. (Indefinite deferral means that you intend to resubmit /request a public hearing be set with the Planning Commission after the 30 day period.) (3) Request Planning Commission Public Hearing Date be Set At-this-time, you may schedule a public hearing with'the Planning Commission. However, we do not advise that you go directly to public hearing if staff has identified issues in need of resolution that can be addressed with a resubmittal. -After outstanding issues have been resolved and /or when you are readyto request -a public hearing, staff will set your public hearing date for the Planning Commission in accordance with the Planning Commission's published schedule and as mutually agreed by you and the County. The staff report and recommendation will be based on the latest information provided by you with your initial submittal or resubmittal. Please remember that all resubmittals must be made on or before a resubmittal date. By no.later than twenty -one (21) days before the Planning Commission's public hearing, a newspaper advertisement fee and an adjoining owner notification fee must be paid. (See attached Fee Schedule) Your comment letter will contain the actual fees you need to pay. Payment for an additional newspaper advertisement is also required twenty -two. (22) days prior to the Board of Supervisors public hearing. These dates are provided on the attached Legal Ad Payments for Public Hearings form. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that have not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. (4) Withdraw Your Application If at anytime you wish to withdraw your application, please provide your request in writing. Failure to Respond If we have not received a response from you within 30 days, we will contact you again. At that time, you will be given 10 days to do one of the following: a) request withdrawal of your, application, b) request deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of these choices is.made within .10 days, staff will schedule your application for a public hearing based on the information provided with your original submittal or the latest submittal staff received on a resubmittal date. Fee Payment Fees may be paid in cash or-by check and must be paid at-the Community Development Intake Counter. Make checks payable to-the County of Albemarle. Do not send checks directly to the Review Coordinator. FEE SCHEDULE FOR ZONING APPLICATIONS A. For a special use permit: Extend existing special use permit; application and first resubmission 1. Additional lots under section 10.5.2.1; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Fee............................................................................ ............................... ......................$1,000.00 7. Each additional resubmittal ....................................... ......... ....................... ........................$500.00 2. Public utilities; application and first resubmission Fee............................................................................ ............................... ......................$2,000.00 Fee............................................................................ ............................... ......................$1,000.00 $1,000.00 8. Each additional resubmittal ....................................... ............................... ........................$500.00 3. Day care center; application and first resubmission Fee............................................................................. ............................... ........................$180.00 B. For amendment to text of zoning ordinance: Fee............................................................................ ............................... ......................$1,000.00 Fee................................................................................... ............................... .......................$1000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 4. Home occupation Class B; application and first resubmission Fee:. ...............::........................:................:............... ............................... .............:........$1,000.00 2. Less than 50 acres; each additional resubmission Each additional resubmittal ....................................... ............................... ........................$500.00 5. 5. Amend existing special use permit; application and first resubmission 3. 50 acres or greater; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Fee............................................................................ ............................... ......................$3,500.00 Each additional resubmittal ....................................... ............................... ........................$500.00 4. 6. Extend existing special use permit; application and first resubmission Fee............................................................................ ............................... ......................$1,000.00 Each additional resubmittal ....................................... ............................... ........................$500.00 7. All other special use permits; application and first resubmission Fee............................................................................ ............................... ......................$2,000.00 Each additional resubmittal ........................................................... ............................... $1,000.00 8. Deferral of scheduled public hearing at applicant's request Fee............................................................................. ............................... ........................$180.00 B. For amendment to text of zoning ordinance: Fee................................................................................... ............................... .......................$1000.00 C. Amendment to the zoning map: 1. Less than 50 acres; application and first resubmission Fee............................................................................ ............................... ......................$2,500.00 2. Less than 50 acres; each additional resubmission Fee............................................................................ ............................... ......................$1,250.00 3. 50 acres or greater; application and first resubmission Fee............................................................................ ............................... ......................$3,500.00 4. 50 acres or greater; each additional resubmission Fee............................................................................. ............................... .....................$1,750.00 5. Deferral of scheduled public hearing at applicant's request Fee............................................................................. ............................... ........................$180.00 D. Board of Zoning Appeals: 1. Request for a variance or sign special use permit Fee............................................................................. ............................... ........................$500.00 2. For other appeals to the board of zoning appeals (including appeals of zoning administrator's decision) — Fee (to be refunded if the decision of the zoning administrator is overturned) .......$240.00 N. Required notice: 1. Preparing and mailing or delivering up to fifty (50) notices: Fee............................................................................. ............................... ........................$200.00 plus the actual cost of first class postage 2. Preparing and mailing or delivering, per notice more than fifty (50): Fee ...........................................................................:... ............................... ..........................$1.00 plus the actual cost of first class postage 3. Published notice: Fee.............................................................................. ............................... .........................Actual cost Legal Ad Payments and Public Hearings Planning Commission Public Hearing Board of Supervisors Public Hearing Payment Deadline Legal Ad Run 1 Legal Ad Run 2 PC Date 12/23/13 12/30/13 1/6/14 1/14/14 1/6/14 1/13/14 1/20/14 1/28/14 1/13/14 1/20/14 1/27/14 2/4/14 2/3/14 2/10/14 2/17/14 2/25/14 2/10/14 2/17/14 2/24/14 3/4/14 2/24/14 3/3/14 3/10/14 3/18/14 3/10/14 3/17/14 3/24/14 4/1/14 3/31/14 4/7/14 4/14/14 4/22/14 4114114 4/21/14 4/28/14 5/6/14 4/28/14 5/5/14 5/12/14 5/20/14 5/12/14 5/19/14 5/26/14 6/3/14 5126114 6/2/14 6/9/14 6/17/14 6/23/14 6/30/14 7/7/14 7/15/14 7/7/14 7/14/14 7/21/14 7/29/14 7/14/14 7/21/14 7/28/14 8/5/14 7/28/14 8/4/14 8/11/14 8/19/14 8/18/14 8/25/14 9/1/14 9/9/14 911114 918/14 9/15/14 9/23/14 9/15/14 9/22/14 9/29/14 10/7/14 9/29/14 10/6/14 10/13/14 10/21/14 10/13/14 10/20/14 10/27/14 11/4/14 10/27/14 11/3/14 11/10/14 11/18/14 11/17/14 11/24/14 1 2/1 /14 12/9114 11/24/14 12/1/14 12/8/14 12/16/14 Bold Italics denotes a change due to a County holiday 12/10/2013 Payment Deadline Legal Ad Run 1 Legal Ad Run .2 BOS Date 12/16/13 12/23/13 12/30/13 1/8/14 12/23/13 12/30/13 1/6/14 1/15/14 1/13/14 1/20/14 1/27/14 2/5/14 1120114 1/27/14 2/3/14 2/12/14 2/10/14 2/17/14 2/24/14 3/5/14 2117114 2/24/14 3/3/14 3/12/14 3/10/14 3/17/14 3/24/14 4/2/14 3/17/14 3/24/14 3/31/14 4/9/14 4114114 4/21/14 4/28/14 5/7/14 4/21/14 4/28/14 5/5/14 5/14/14 5/12/14 5/19/14 5/26/14 6/4/14 5/19/14 5/26/14 6/2/14 6/11/14 6/9/14 6/16/14 6/23/14 7/2/14 6/16/14 6/23/14 6/30114 7/9/14 7/14/14 7/2-1/14 7/28/14 8/6/14 7/21/14 7/28/14 8/4/14 8/13/14 8/11/14 8/18/14 8/25/14 9/3/14 8/18/14 8/25/14 9/1/14 9/10/14 9/8/14 9/15/14 9/22/14 10/1/14 9/15/14 9/22/14 9/29/14 10/8/14 10/13/14 10/20/14 10/27/14 11/5/14 10/20/14 10/27114 11/3/14 11 /12/14 11/10/14 11/17/14 11/24/14 12/3/14 11/17/14 11/24/14 12/1/14 12/10/14 2014 Submittal and Review Schedule Special Use Permits and Zoning Map.Amendments Resubmittal Schedule Written Commentsand Earl iest'Plannin.g Commission Public Hearing* Resubmittal Dates Comments'to a.ppli cant. foe decision on Whether, to proceed to Public. Hearing'* Request -for PC Public Hearing /: Ad Payment Duel;! Planning 'Commission Public Hearing No. sooner than* COB Auditorium Monday Wednesday Monday. Tuesday. NovlaZ013 m Dec 4w2d13 , spec 232073. _. Jan 14 N60;0 A wDea'8 w Jan 06 Jan 28 J D.ec2�2013 due Dec;312Q1<: Jan 06 Jan 28 06 2013 Jan 15 Feb 03 Feb25 Jan 06 Feb 05 Feb 1.0: Mar 04 Tue Jan,21 Feb 19 Feb 24. Mar 1:8 Feb 03 Mar:05 :Mar 10 Apr 01 Tue.Feb 18 Mar 19 Mar 31 Apr22 Mar 03 Apr'02 Apr 14 May 06 Mar 17' Apr 16 Apr28 May20 Apr07 ... _ May 07 May 12 . Jun 03 Apr 21 May 21 May26 Jun 17 May 05 Jun',04 Jun.23 Jul 15 May1:9 Jun 1:8 Jun.23 Jul 15 Jun 02 Ju102 Jul 07 Ju129 Jun 1.6 Jul 16 Jul 28 Aug 1:9 Jul 07 Aug 06 Aug 18 Sep''09 Jul 24 Aug 20 Tue Sep 02 Sep-23 Aug 04 Sep. 03 Sep 15 Oct D7 Aug IS Se 17 Se 29 Oct 21 Tue Sep 02 :Oct 01 Oct 1.3 Nov: 04 Sep 15> O.ct 15 Oct':27 Nov 18 Oct 06 Nov::05 Nov 17 Dec 09 Oct 20 Nov 19 Nov 24 Dec 16 Nov 03: Dec 03 Dec 22 Jan13M201 Nov 17 Dec 17 Dec 22 na1A3215 Dec 01 Dec 31 :lan52:015 , ..M , :Jan272015t Dec 15 t,Jan,14 °20,1�5Feb,.22015 a,' ",,, ,-'2176b' 24201w5 '. Jan 05 2'0`5 nFeb 4201'5 ,,..,,FFeb 9.201£5 Mar�032015 Bold italics = 'submittal /meetin .da is different due to a ftlida . 2015 dates are tentative. *The reviewing planner Will contact applicant tddiscuss comments.of reviewers and advise that changes that.are needed are significant enough to warrant an. additional submittal or advise that the the project is ready.for a public hearing. If changes needed are minor,' the.planner• will ,advise thatthe project go to publich,earing. `*'The legal,ad deadline is °the last.date at which arrapplicant can decide;whether to resubmit or go to public hearing. If. an applicant decidesto.goto.public hearingagainst*e advice of the: reviewing:plannu, a recommendation for denial will likely result. Generally, the applicant will will have only one opportunity to defer the PC public heanngfor the :project once it has'been.advertised for public hearing. Additional deferralsmill not be allowed except in extraordinary circumstances such as.a°major change inthe project' proposal by'the applicant or more issues identified bystaff that have not`previously been brought to:the applicants attention. FOR OFFICE USE ONLY SP # or ZMA # Fee Amount $ Date Paid By who? Receipt # Ck# By: Resubmittal information for Special Use Permit or sr Zoning Map Amendment • ��RGINIP PROJECT NUMBER: SP X I OW 9 - PROJECT NAME: �S � UXk LJ j- - Resubmittal Fee is Required 171. Per Request Resubmittal Fee is Not Required Community Development Project Coordinator Name of Applicant Phone Number Signature Date Signature FEES . Date Resubmittal fees for original Special Use Permit fee of $1,000 $200 + actual cost of first -class postage First resubmission FREE r Each additional resubmission 500 p�SS_ e Resubmittal fees for original Special Use Permit fee of $2,000 j- First resubmission FREE F—j Each additional resubmission $1,000 « ?� b� Y' �,"h q . "wf. wJ1' k�' ,fit !`1A+a'•GA����.@ FIN Resubmittal fees for original Zoning Map Amendment fee of $2,500 r First resubmission FREE j Each additional resubmission $1,250 f.. a wK3 i4 g .5r .-:... VA` I . ,. .. ,,, ... . ,•... .... , .,.t. ,. Resubmittal fees for original Zoning Map Amendment fee of $3,500 r First resubmission FREE j— Each additional resubmission $1,750 ��r � 111 1 4BO4 ' xta ,,:' `� �°N' ''` 9hz ''��.. �� .,p � �,.�� iC._ �s. �m *t.._. V� F� k Deferral of scheduled public hearing at applicant's request - Add'I notice fees will be required $180 To be paid after staff review for public notice: Most applications for Special Use Permits and Zoning Map Amendments require at least one public hearing by the Planning Commission and one public hearing by the Board of Supervisors, Virginia State Code requires that notice for public hearings be made by publishing a legal advertisement in the newspaper and by-mailing letters to adjacent property owners. Therefore, at least two fees for public notice are required before a Special. Use Permit or Zoning Map Amendment may be heard by the Board of Supervisors. The total fee for public notice will be provided to the applicant after the final cost is determined and must be paid before the application is heard by a public body. MAKE CHECKS TO COUNTY OF ALBEMARLE/PAYMENT AT COMMUNITY DEVELOPMENT COUNTER Preparing and mailing or delivering up to fifty, (50) notices $200 + actual cost of first -class postage Preparing and mailing or delivering each notice after fifty (50) $1.00 for each additional notice+ actual cost of first -class postage Legal advertisement (published twice in the newspaper for each public hearing) Actual cost (minimum of $280 for total of 4 publications) County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, .VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 6/7/2011 Page 1 of 1