HomeMy WebLinkAboutSDP201400019 Review Comments Major Amendment, Preliminary Plan 2014-05-29Ellie Ray
From: Alex Morrison [amorrison @serviceauthority.org]
Sent: Thursday, May 29, 2014 11:34 AM
To: Ellie Ray
Subject: SDP201400019: CHO Airport Surface Parking Expansion - Major
Ellie,
I have reviewed the above referenced plan. The ACSA is still awaiting 3 copies of the plan along with a water data sheet
from the applicant so we can conduct a utility construction review. In the meantime I wanted to provide comments on
the copy I have so they can make revisions before submitting 3 copies. My comments are as follows:
• Call out a TS &V on the existing line for the FHA. A water shutdown is not feasible to cut in a tee because it will
affect all domestic and fire protection for the airport. A TS &V will allow the water main to remain in service
while construction occurs.
• Extend the proposed easement around the FHA so it extends 10' off all sides.
• Add any applicable ACSA detail (FHA, pipe installation and easement). The details can be found on our website
(www.serviceauthority.org) under Engineering — General Construction Specifications.
• Show existing trees within the ACSA waterline easement along Bowens Loop that are to remain (per ARB) and
add a call out note. The ACSA will review the locations and determine if they can remain. If the trees are allowed
to remain, the ACSA will have no obligation to replace the trees in the event of a waterline excavation.
Let me know if you have any questions. The plans should be submitted directly to the ACSA and addressed to the
attention of Jeremy Lynn.
Alexander J. Morrison, EIT
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434 - 977 -4511 Ext. 116