Loading...
HomeMy WebLinkAboutWPO201400043 Review Comments Erosion Control Plan 2014-05-20�� OF A i" A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Keswick Country Club Minor Site Plan Amendment Pole Barn at Golf Maintenance Facility WP0201400043 Plan preparer: Roudabush Gale & Assoc. Inc. [ageorge @roudabush.com] Owner or rep.: Plan received date: Date of comments: Reviewer: KESWICK CLUB LLC 09 May 2014 20 May 2014 Max Greene The Stormwater Protection Plans (WP0201400043) submitted 09 May 2014 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. The following items will be adequately addressed prior to final plan approval: 1. Sanitary sewer line will be shown on profile to ensure adequate spacing. 2. Per soils information the ground water table may be too high for this application. 3. Per soils information bedrock may be encountered prior to full depth of excavation. 4. Infiltration testing is required for this Stormwater Management Practice. What is the perk rate for the 2 areas? 5. System must be designed to drain down in less than 72 hours. 6. Pre - treatment or other method of preventing debris from entering underground system will be shown. 7. Overflow or bypass system should be included to prevent water from backing up into the gutter. 8. Does the gutter system contain the 10 year storm event? 9. A Storm Water Maintenance Agreement will be recorded prior to final plan approval. The links for SWM Agreement and Procedure: hllp:// www.albemarle.org /upload/images /forms center /departments /Community Development/forms/E ngineering and _WPO_ Forms/Plan _Review _- Stormwater Management BMP Facilities Maintenance Agreement.pdf hllp:// www.albemarle.org /upload/images /forms center /departments /Community Development/forms/E ngineering and _WPO_ Forms/Plan _Review _- Stormwater Management BMP Facilities Maintenance Agreement Procedures.pdf The owner may contact Ana Kilmer for additional information for SWM agreement requirements. Once these comments have been addressed, please submit 2 copies of the revised plans, calculations, and narratives to Current Development Engineering along with the required review fee and transmittal form. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene @albemarle.org to schedule an appointment. [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: CDDEI_swm_MRG_Keswick Country Club Minor Site Plan Amendment Pole Barn at Golf Maintenance Facility.doc