Loading...
HomeMy WebLinkAboutWPO201400046 Review Comments Stormwater Management Plan 2014-06-12i" ,. `IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Timberwood Square WP0201400046, SDP201400039 Plan preparer: Dominion Engineering [mmyers @dominioneng.com] Owner or rep.: HIGHLIFE LLC C/O DOWNER REALTY Plan received date: 13 May 2014 Date of comments: 10 June 2014 Reviewer: Max Greene The Development Plans (WP0201400046, SDP201400039) submitted 13 May 2014 have received Engineering Review and do not appear to meet Albemarle County minimum checklist items for approval. The following itemized list is to assist in meeting the Albemarle County requirements for approval: Site Development Plan: a. Content: The site plan must not contain the erosion control plan, stormwater management plan, road /street plans, or mitigation plan. These must be separate documents, to be reviewed and bonded separately, and not part of zoning documents or zoning enforcement, or zoning letters of revision, or permanent land records, etc. They will be removed and submitted as separate documents with corresponding cover pages and required information. b. Date and source of the topographic information: [18- 32.6.2] All topography should be at least visually field verified by the designer within the last year and stated on the plan sheet. C. Proposed slopes 3:1 slopes will have Low Maintenance Ground Cover (not Grass) specified on plan. [Design Standards Manual, Section 8] d. Please show the deed book and page numbers for the existing easements on the property. e. Please show all radii for curbs. f. Please show widths of parking islands. Minimum island width is 3' for safety. g. Cul -de- sac /turn- around areas do not appear to meet the minimum requirements and will be designed in accordance with the Department of Fire and Rescue. 2. Erosion and Sediment Control Plan: a. Proposed lots #25 - #32 will be restricted from receiving building permits until the site is stabilized and WPO inspector can release the basin for building construction. b. A variance is required for the alternative basin design. i. A turbidity curtain will be required in the existing pond. ii. Additional protective measures may be required for variance approval. iii. This is the link to the application form for the variance request: http:// www.albemarle.org/upload/images /forms center /departments /Com munity_Development/forms/Engineering—and _WPO_Forms/WPO_- Application Erosion & Sediment Control Plan.pdf C. Diversion should be moved back to the silt fence location to capture more of the site work. The inlet protections over the existing storm water pipe should be blocked in a manner that does not allow water to enter pipe (leave pipe riser sections on while excavating area). The final Swale shaping can occur with the removal of the Engineering Review Comments Page 2 of 2 sediment basin. d. Plan appears to show significant amount of soil being removed over the existing 4.5' stormwater system pipe. How much cover does the existing pipe have to lose? Should the existing pipe be damaged during construction, then a delay in the project could occur while a new plan is reviewed for approval. 3. Stormwater Protection Plan: a. Plan proposes to utilize the private pond Arber Lake in the Forest Lakes Subdivision. Approval by the Forest Lakes Home Owners Association is required. Please submit legal record of ability to utilize pond. b. Not all impervious areas to the existing pond appear to be included in the calculations. Please provide actual imperious areas to the existing pond in the calculations (Estes Park, day care, and Shopping center). Once these comments have been addressed, please submit 3 copies of the revised plans, calculations, and narratives to Current Development Engineering along with the required review fee and transmittal form. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene @albemarle.org to schedule an appointment. [17- 204.f] An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B). File: CDDE1 _sdp,esc,swm_MRG_Timberwood Square.doc