Loading...
HomeMy WebLinkAboutWPO201300054 Review Comments Bond Estimate 2014-05-19Project Name: Crozet Phase 2 Watermain Replacement Project WPO file number: WP0201300054 Erosion and Sediment Control Bond Estimate Item Item Number stablizatim (PS, TS) 0.4 acres $5,000.00 sift fence (SF) 200.0 it Culvert inlet protection (CIP) $1,000.00 Utility Stream Crossing $200.00 $800.00 outlet protection (OP) length 0 ft width channel (SCC, matted) length 0 ft vndth check dam depth in channel 0 ft channel width instruction entrance (CE) $0.00 wash rack 1 $0.00 paved construction entrance 2 survey and layout (price per 0.7 mi.) acres 0.4 traps and basins mobilization $2,000.00 $2,000.00 Stream crossing (computed independently) 0 $3,500.00 No. Unit Unit Cost Cost (installed) 5/14/2014 0.4 acres $5,000.00 $1,950.00 200.0 it $5.00 $1,000.00 4 $200.00 $800.00 1 $1,500.00 $1,500.00 0 ft 0 $0.00 $0.00 0 ft $0.00 0 ft 1 $0.00 $0.00 2 $2,000.00 $4,000.00 1 $2,000.00 $2,000.00 0 $3,500.00 $0.00 0 $200.00 $500.00 $0.00 Cost sum $11,950.00 prof mgmt $1,792.50 contingency $1,374.25 Total $15,120 5/14/2014