Loading...
HomeMy WebLinkAboutSUB200400132 Review Comments Bond Estimate 2014-05-21Subdivision Name: Glenwood Station Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB200400132 Item Road Name station 10 +00 to 31 +00 aggregate base blotted or prime &double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6) ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cm (15 to 48 ") pipe, rcp, cm (15 to 48 ") pipe, rcp, cm (15 to 48 ") pipe, rcp, cm (15 to 48 ") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) \\ Cob- dts01 \CityViewLnk \Docs\ 2004 \SUB \SUB200400132 \RP_bond_est 21May2014.xlsx 5/21/2014 No. Unit Unit Cost Cost installed % compete cost remaining road length 2100.0 ft 6.0 in d 0.0 ft L 18.0 ft W 0.0 ton $35.00 $0.00 0% $0.00 0.0 ft L 18.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $100.00 $0.00 0% $0.00 1.0 in d 1000.0 ft L 24.0 ft W 147.0 tons $120.00 $17,640.00 0% $17,640.00 0.0 ft $13.00 $0.00 0% $0.00 1000.0 ft $15.00 $15,000.00 0% $15,000.00 1000.0 ft $17.00 $17,000.00 0% $17,000.00 1 ft $350.00 $350.00 0% $350.00 0 each $200.00 $0.00 0% $0.00 0 each $200.00 $0.00 0% $0.00 0 Each 0 each $150.00 $0.00 0% $0.00 0 ES @ 3000 0.0 ft $17.00 $0.00 0% $0.00 0 each $3,500.00 $0.00 0% $0.00 0 each $500.00 $0.00 0% $0.00 0 ft $450.00 $0.00 0% $0.00 15.0 in d 0 ES -1,2 0 EC-1 0.0 ft $35.00 $0.00 0% $0.00 24.0 in d 0 ES -1,2 0 EC-1 0.0 ft $50.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 0 EC-1 0.0 ft $40.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 0 EC-1 0.0 ft $40.00 $0.00 0% $0.00 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 0.0 ft L 0.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 0.0 cy $4.00 $0.00 0% $0.00 0.0 cy $9.00 $0.00 0% $0.00 0.0 ft L 0 mi. 0 Isum $2,000.00 $0.00 0% $0.00 0.0 ft L 0 mi. 0 Isum $2,000.00 $0.00 0% $0.00 0Isum $500.00 $0.00 0% $0.00 0.0 ft L 0 inc of 500' 0 each $200.00 $0.00 0% $0.00 0.0 ft L 0 inc of 500' 0 each $200.00 $0.00 0% $0.00 1000.0 ft L 2 inc of 500' 3 each $200.00 $600.00 0% $600.00 0.0 ft L 0 inc of 500' 0 each $200.00 $0.00 0% $0.00 0.0 ft L 0 inc of 500' 0 each $200.00 $0.00 0% $0.00 0 ft $1.00 $0.00 0% $0.00 0.0 ft L 0 mi. 0 Lanes $2,000.00 $0.00 0% $0.00 0.0 ft L 0 mi. 0 Lanes $150.00 $0.00 0% $0.00 0.0 ft L 0 mi. 0 Lanes $100.00 $0.00 0% $0.00 $50,590.00 $50,590.00 cost sum proj mgmt $7,588.50 $7,588.50 contingency $5,817.85 $5,817.85 \\ Cob- dts01 \CityViewLnk \Docs\ 2004 \SUB \SUB200400132 \RP_bond_est 21May2014.xlsx 5/21/2014 Subdivision Name: Glenwood Station Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB200400132 Item Road Name No. Unit Unit Cost Cost installed % compete cost remaining Total $64,000 $64,000 \\ Cob- dts01 \CityViewLnk \Docs\ 2004\ SUB \SUB200400132 \RP_bond_est_21 May20l4.xlsx 5/21/2014