Loading...
HomeMy WebLinkAboutSDP201300065 Review Comments Final Site Plan and Comps. 2014-07-08County of Albemarle Department of Community Development Memorandum To: Daniel Hines (dhines @bohlereng.com) From: Megan Yaniglos- Senior Planner Division: Planning Services Date: Februarx- 1014 Rev1: July 8, 2014 Subject: SDP- 2013 -065 Fifth Street Station- Final Site Plan The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] Requirements: 1. [32.5.2 (i); Proffer 1(G)] Provide a sidewalk from the parking to the bus stop within the park and ride lot. The whole site needs to be shown on the final site plans, including all of Bent Creek Road, and improvements. While this information was shown on the road plans, it also needs to be on the final site plans. Staff needs to verify that the Proffer is being met and that the park and ride lot landscaping is being provided. Rev1: Comment addressed. 2. [32.5.2 (p)] The conservation checklist will need to be signed prior to signing of the final site plan. Rev1: Comment to be addressed when final site plan is ready for signature. 3. [Proffer #1 -G] Coordinate the location of all transit stops with CAT. Provide documentation from CAT that they approve any stops with this site plan. Rev1: Comment not addressed. Provide documentation from CAT. 4. [Proffer 10(D)] Provide engineering documentation that states the Wegman's and the site meet the Best Management Practices to be reviewed and approved by the County's Program Authority. Also provide written documentation that the Thomas Jefferson Foundation has approved the proposed roof material color for the building. Rev1: 5. [32.7.9.5] Some of the street trees that are being shown conflict with the proposed retaining walls. Revise the road plans and the final site plan so conflicts are resolved. Rev1: Comment addressed. 6. [32.6.2] All easements will need to be submitted for review and approval prior to final site plan approval. (ie off site grading, landscaping, drainage, etc) 7. [4.17] Proposed lighting must have a half a foot candle or less at the property lines and rights of way. Revise the lighting plan or request a special exception under 4.17.5 Rev1: Footcandles along Bent Creek Parkway exceed the requirement of 0.5 footcandles. A special exception will need to be submitted and approved for having street lighting. 8. [4.17] Proposed light type "OA' is not a full cut off light. Replace with a fixture that is full cut off Rev1: Can you clarify if the lumens for the fixture "W1" LED is for a single bulb or a combination? 9. [Proffer 1(D)(1)] "The first final site plan for the Property shall reserve the Landfill Segment, including pedestrian and bicycle accommodations and the dedication of related drainage, slope and utility easements, for future dedication to the County at the County's request and in the County's sole discretion." Please show this information on the final site plan. Any easements being dedicated will need to be done through an easement plat. Rev1: Comment addressed. Please contact Megan Yaniglos at the Department of Community Development 296 -5832 ext. 3004 for further information. 2