Re: SDP2013 -00044 Old Trail Village Block 113 & 3C
Dear Mr. Newberry:
We have reviewed the final site plan for Old Trail Village, Block 1, Phase B and Block 3, Phase
C dated July 1, 2013 with revisions dated 9127113, 1120114, 2111114, 3]5114, and 3124114 as
submitted by Roudabush, Gale & Associates and offer the following comments:
1. It has been determined that there needs to be a minimum of 3 feet of right -of -way behind
the curb and gutter to allow for maintenance of the curb and gutter. This site plan does
not need to be resubmitted for this item. The right -of -way can be addressed with the final
subdivision plat.
2. The pavers, sidewalk, and street trees along Ashlar Avenue will not be maintained by
VDOT. An easement for the sidewalk and street trees will need to be provided on the
final plat and a maintenance agreement with Albemarle County will need to be provided.
3. The site plan appears to be in compliance with VDOT standards and specifications, and
VDOT has no objection to site plan as submitted.
At least 48 hours prior to construction, a pre - construction conference needs to be held with the
inspector from this office in attendance. In addition, a Land Use Permit issued through this
office will be necessary for any and all work that will occur within dedicated right -of -way. If
you need additional information concerning this project, please feel free to contact me.
Sincerely,
--/ Al&�'
Troy Austin, P.E.
Area Land Use Engineer
Culpeper District