Loading...
HomeMy WebLinkAboutARB201400055 Review Comments Preliminary Site Plan 2014-06-13ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB- 2014 -55: Royal Orchard Wireless Facility Review Type Preliminary Review of a Site Development Plan Parcel Identification 05300000000200 Location Approximately 185' north of I64, approximately 1800' east of the Nelson County line Zoned Rural Areas (RA), Entrance Corridor (EC) Owner /Applicant Royal Orchard Land Corp.Nelocitel, Inc., (Cheryl L. Taylor) Magisterial District White Hall Proposal To install a 68' tall steel monopole with associated equipment. Context The site is located in a densely wooded rural area. ARB Meeting Date June 23, 2014 Staff Contact Margaret Maliszewski HISTORY: The ARB has reviewed no previous proposals for this site. PROJECT DETAILS The proposed monopole location is approximately 185' north of the property line along I64. The property line is approximately the same distance from the paved road. The reference tree is a 24" Chestnut Oak with a height of 69.8'AGL. The proposed monopole is a 68' tall steel pole, with base at 1673.2' AMSL, and top at 1741.2' AMSL. 1 array of 3 flush - mounted panel antennas is proposed. The antennas measure approximately 73" tall x 12" wide x 7.1" deep. 6 TMAs (tower mounted amplifiers) are to be installed below the antenna array. The TMAs are smaller than the antennas. An existing gravel road is to be repaired and improved to provide access to the 60' x 60' lease area. The lease area is to be enclosed with chain link fence. Pole, antennas, cables and ground equipment are to be painted SW 6090 java brown. ANALYSIS FOR THE CERTIFICATE OF APPROPRIATENESS FOR THE GROUND EQUIPMENT AND BASE STATION A Certificate of Appropriateness from the ARB is required for the base equipment portion of a proposed telecommunications facility in the Entrance Corridors. The ARB may impose conditions on the Certificate of Appropriateness, based on the EC Guidelines, and consistent with Section 5.1.40 of the Zoning Ordinance. Ref Guideline Issue Recommendations Accessory structures and equipment 17 The following should be screened to The ground equipment is not expected to be visible from the EC. The None. eliminate visibility from the Entrance wooded area between the equipment and the road, and the elevation of EC that the balloon was visible and Corridor street: e. Mechanical equipment the site above the EC, both help eliminate visibility. the consistent wooded backdrop, the ANALYSIS REGARDING VISIBILITY OF THE MONOPOLE The ARB may act in an advisory capacity to the Agent as to whether the facility is being sited to minimize its visibility. Ref Guideline Issue Recommendations Development paftern 33 The relationship of buildings A balloon test was conducted for this proposal on May 9, 2014. The Given the limited distance along the and other structures to the weather was clear. Route 250 and I64 were traveled to determine EC that the balloon was visible and Entrance Corridor street and to visibility. See Attachment A for a vicinity map. The balloon was the consistent wooded backdrop, the other development within the visible from a vantage point in front of the property, for only a few proposed location of the facility is corridor should be as follows: seconds (approximately 50' driving at the posted speed), when expected to sufficiently minimize the f. The placement of structures traveling eastbound on I64. From this vantage point the balloon was visibility of the monopole such that on the site should respect approximately 150 yards away. When the balloon was visible, it no impact on the Entrance Corridor is existing views and vistas on and was viewed with a wooded mountain backdrop. anticipated. around the site. I.IUUTIu/: W&OaRMI]UIUINOIMIY[13M Re - ag rding the Certificate of Appropriateness for the ground equipment and base station: Because the proposed facility is consistent with all applicable guidelines, staff recommends approval of the Certificate of Appropriateness as proposed. Regarding visibility of the monopole: Staff recommends that the ARB forward the following recommendation to the Agent: The ARB finds that the proposed location of the facility will sufficiently minimize the visibility of the monopole from the Entrance Corridor. TABLE A This report is based on the following submittal items: Sheet # Name Revision Date T -1 -Drawing Title Sheet 4/17/2014 SP -1 Survey 4/17/2014 A -0 Site Plan 4/17/2014 A -OA Area Plan 4/17/2014 A -1 Compound Plan 4/17/2014 A -2 Tree Height Diagram 4/17/2014 A -3 Shelter Details 4/17/2014 A -4 Details 4/17/2014 A -5 Details 4/17/2014 E &S -1 Erosion & Sediment Control Plan 4/17/2014 E &S -2 Erosion & Sediment Control Plan 4/17/2014 E &S -3 Erosion & Sediment Control Details 4/17/2014 E &S -4 Erosion & Sediment Control Notes 4/17/2014 ATTACHMENT A: Royal Orchard vicinity map