Loading...
HomeMy WebLinkAboutWPO201300052 Bond Estimates Bond Estimate 2014-06-30Project Name: Old Trail, 1 B -3C WPO file number: WP0201300052 Erosion and Sediment Control Bond Estimate Item Item 15 in Number out at high side 13 ft 1 stablization (PS, TS) 0 ft 2 sftfen -(SF) 180 ft 3 safelyfence(SAF) 50 ft 4 diversion (DD, FD, RWD) 0 at 5 standard manhole fame top (not inlet) 76 ft 6 manhde structure (per ft. rise) 13 ft 7 temporary slope drain(TSD) pipe length 8 dh -* for thap/man 2166.7 cy 9 (TOAL CV estimate) height of dam at toe 10 (spillway stone tons) height of fill at face 11 $2,000.00 length of dam 12 (riser unit price) top width 13 base plate or fdn (area above trensitm) 14 (barrel unit price) (total width of dam) 15 barrel cdlars (height below transition) 16 baffle length (area below transitlon) 17 (total fill wlume) 18 lengm of spillway 19 wi ith of spillway 20 structures for basin 21 near height 22 riser diameter 23 barrel length 24 barrel diameter 25 26 27 28 tree protection 29 silt fence inlet protection (I P) 30 stone inlet protection (I P) 31 outlet protection (OP) length 32 channel (SCC, matted) length 33 checkd- depth in channel 34 onstructim aMrnm(CE) 35 wash rack 36 pawed c,n,t,,bm enhance 37 riprap, placed (42" SWIM apron) depth width 3: rvey and layout (price per 0.1 mi.) acres 40 moblllcaton 41 stream crossing (computed independently) 42 43 44 45 0 ft pipe diameter 15 in 7.55 ft out at high side 13 ft 2.55 ft cut at face 0 ft 67 ft length of cut 180 ft 6 ft width of cut 50 ft 28.305 sf (area below transitlon) 0 at 15.1 ft (total width of cut) 76 ft 5 ft (depth below transitlon 13 ft 12.75 sf (area above transkion) 325 sf 101.9 cy (total fill wlume) 2166.7 cy 0 ft (TOAL CV estimate) 2201 cy 0 ft (spillway stone tons) 0 tons 0 f $2,000.00 $2,000.00 0 in (riser unit price) $0.00 0 ft base plate or fdn 0 0 in (barrel unit price) $0.00 barrel cdlars 1 baffle length 70 ft 13 ct. -50 -If material I tree 15 ft width 10 ft 1 ft width 10 ft 1 ft channel width 10 ft 1.5 ft length 22.0 ft 17.5 (tons) 33.20625 tons 1.54 traps and basins 1 No. Unit Unit Cost Cost in( sialledl $0 1.4 acres $5,000.00 $6,750.00 1260.0 ft $5.00 $6,300.00 1860.0 ft $5.00 $9,300.00 0 ft $13.00 $0.00 2 as $500.00 $1,000.00 18 ft $450.00 $7,875.00 0 $35.00 $0.00 $13.00 $28,613.00 $50.00 $0.00 $6000 $1,992.38 $1,270.00 $500.00 $0.00 cost sum $78,963.38 prof mgmt $11,844.51 contingency $9,080.79 Total $99,890 7/1/2014 $0.00 $200.00 $0 $0.00 $200.00 $200 $50.00 $3,500 650 ft $5.00 $3,250.00 0 $100.00 $0.00 22 $200.00 $4,400.00 0 $675.00 $0.00 $13.00 0 $225.00 $0.00 1 $2,000.00 $2,000.00 1 $2,000.00 $2,000.00 0 $3,500.00 $0.00 $6000 $1,992.38 $1,270.00 $500.00 $0.00 cost sum $78,963.38 prof mgmt $11,844.51 contingency $9,080.79 Total $99,890 7/1/2014 Project Name: Old Trail, 1 B -313 WPO file number: WP0201300052 Stormwater Management Plan Bond Estimate 531 LF 42" HDPE SWM pipe /outfall to Upper Ballard Pond + Misc Item Item Number 1 pips, rep, amp (15 to 48'), Old Tail Driee isW M) 42.0 in d, $ILF: Loudon 0 ES-1,2 2 pipe.'ack8bore, 42' HDPE 42.0 in d 0 ES-1,2 3 42' EW -2 cast- in- place.rdwall, Upper Ballard Pond No. Unit Unit Cost Cost (installed 0 EC -1 426.0 It $113.99 $48,559.74 0 EC -1 105.0 ft $666.00 $69,930.00 1.0 $4,723.00 $4,723.00 cost sum $123,212.74 pq mgmt $18,481.91 contingency $14,169.47 Total $155,870 7/1/2014