Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SDP200500125 Review Comments Letter of Revision 2 2014-07-14
S� pF ALg� vo ®� �'IRGIISZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296-5832 Fax (434) 972 -4126 Eric Wooley 22 E. High Street Charlottesville, VA 22902 July 14, 2014 RE: SDP 2005 -125- Kenridge- Letter of Revision #2 Mr. Wooley: This letter is to approve the letter of revision: 1. Adjusting the storm drainage piping system based on in -field site conditions. as shown and described in the revised plan dated May 28, 2014 and letter of explanation dated June 18, 2014. No other changes that may show on the plan are approved with this letter of revision. This approval is viewed as your second Letter of Revision for the above - mentioned final site plan, entitled SDP2005 -125 Kenridge Final Site Plan. Please note that a total of three (3) Letters of Revisions are allowed before all changes to the site plan are required to be submitted in the form of a new site plan amendment. If you have any questions please feel free to contact me. Sincerely, Megan Yaniglos Senior Plamler, I n� \1700LLLT ENGINEERING Transmittal via Hand - delivery Date: June 18, 2014 To: Megan Yaniglos, Senior Planner County of Albemarle, Virginia Regarding: Kenridge: Letter of Revision to Site Plan SDP 2005 -125 Attachments: (4) full -size review set of plan documents Megan, Attached to this memo, you will find an LOR to the Kenridge Site Plan for the purpose of adjusting the storm drainage piping system based on in -field site conditions. Prior to previously submitted LOR in October 2013, all surface storm drainage for Kenridge subdivision lots 62 -65 flowed to the storm drains located in the yards fronting Colridge Drive. This LOR returns the storm drainage back to this original piping system. The last letter of revision submitted in October of 2013 included the addition of a retaining wall design, which necessitated the introduction of yard drains and stormwater drainage traveling across the rear of the houses through new yard drains, ( #321 to #320) which, would then tie into existing storm sewer structure #34. After encountering subsurface rock on lot 65 between yard drain #320 and existing storm sewer #34, the plan was revised to re -route the stormwater back to the front of the lots through the addition of yard drains #320B and #27B. Stormwater collected and originating at junction box #320B travels in a southward direction for 85 feet, along the property line for lots 64 and 65, through a 12" RCP pipe at a slope of 1.19% to Junction box #27B, which is a doghouse tie -in to the existing storm pipe that runs from storm drain #28 to #29. This letter of revision does not require any changes to storm watershed drainage areas and does not alter the existing downstream pipe capacity. If you should have any questions during your review, please do not hesitate to ask! Sincerely; Enc Woolley, PE WOOLLEY ENGINEERING 220 East I Iigli Strect (434) 973 - 0015 Charlottesville, Virginia 22902 copyright © 2013 by Woolley Engineering MANOR HOUSE WOOLLEY ENGINEERING TMP 60K -A / / / Consulting Civil Engineers 220 East High Street Charlottesville • Virginia 22902 1> (434) 760 • 5050 1 f (484) 29.5.7.540 LOT 61 TMP 60K -61 www•wcx>lley�ng.com (2) JUNIPERUS virginiana [Ht = 5'] \ \ \ \ p N ANT e , 6 �` / Prepared For: Craig Enterprise 338 Rio Road West Charlottesville, Virginia 22901 .......................... / LETTER '-- EX. RETAINING WALL OF \ \ -- - - - - - - - - - - - - - - - - - - - - _ _ / -- - - REVISION \ \ - z z , \ 321 / / b � � 7_34) \_ _j N O z - \ J I \ \ °-oG� �`�Ix <° >> 630.95 �TORM�STR./#32 - - ST M T 3 0 �OF DRAe �� 2� R DRA �LEA-DEMITH TOP "EL 2 .5 / 1 EX. STORM STIR. #34 0 CORE NEW INVERT IN I I 0 C/1 � 4, - > > \ \ y o �s. ,o = <o \ <o 24'' YA R D R N / TOP ELEV: 629.50 �- � C AN- TYP V. UT' 6 .5 ( � J ' n EX. TOP: 625. PROPOSED TOP: 623.25 W J I \ \ \ \ \ INV 1f : 6 .70 / / INV/OU :626.50 - LOT _L0' v / INV IN: 619.00 EX. INV. OUT: 615.00 � Q y- Q \ MO E STII�dG / / / / / T HENYLO E STORM STR. #3208 I I C� W m \ \ / / / 24" YARD DRAIN TOP ELEV: 630.50 I \ / I I VILLA III LOT 12 J W Q 640.26 \ / / / L I I.I� P / INV IN: 625.30 VI LLA I INV. OUT: 625.30 w \ I I � v O - O PEN SPACE _ / / � 1 \ \L T6�C / / / 632.14 631 .04 I z W - \ / 631.4 / 628.52 E _ I n1 \ -_ - - -- - � - -, - -� 6�y• i 630.25 1 1 I STORM STIR. 427B I W 627.08 ' 24'' JUNCTION BOX TOP ELEV: 628.60 I IN IN: 624.30 I I INV. OUT: 624.24 I GRADING \ � � 628.27 I \ \ 628.90 630.00 -- - - LL 626.8 _ -- - I I I27B AND SITE I - - - PLAN \ _ --- 30> � � - - - - - -- - - - - -- 628 � - 629 62q 2 7 26.83 �ONC. 625. 1 S Job Number: 627.42 ( 2 628.75 62 .35 T{/ \ \ 1370 62534 6 - - -- 626. / � L ----- - - - - -- 627.33 628.66 6 628.26 ; i � 6 5.53 \ � 625.2 - \ 23.95 626 .24 - - -- r-� Ix -_ r ,p - - - - TH OF P ✓ - J - \ ERIC W WOOLLE LIC NO 37088 (238 o �� ssl e RELOCATE EX. DRIVE ENTRANCE COLRIDGE DRIVE �� -�- oNAL Date. October 23, 2013 (224) EX. STORM STIR. #28 EX. STORM STIR. #27 PROPOSED TOP: 627.50 EX. STORM EX. STORM STIR. 929 STIR. . #28 PROPOSED TOP: 627.50 PROPOSED TOP: 628.50 EX. INVERT: 625.29 . . EX INVERT: 62389 Revision: PROPOSED TOP: 625.50 EX. INVERT: 623.44 EX. INVERT: 621.63 (PRIVATE ROAD) - - -_ - 1 May 28, 2014 NO\�N Scale: S� p�E NPp -a� � - - - - Sheet No.: - - _ LOT 5 LOT 6 L LOT 2 LOT 3 OT 4 C-300 i LOT 1 10' 0 10' 20' 2of5 copyright © 2013 by Woolley Engineering