HomeMy WebLinkAboutSUB201400111 Review Comments Preliminary Plat 2014-08-19 (3)LjRGiNL�
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
August 28, 2014
Scott Collins
Collins Engineering
200 Garrett St., Suite K
Charlottesville, VA 22902
RE: SUB - 201400111 Wintergreen Farms — Preliminary Subdivision Plat
Mr. Collins:
Prior to approval of the Preliminary subdivision plat, revisions are required. The plat must be revised in
accordance with Chapter 14 of the Albemarle County Code (specific sections are cited below):
Sec. 14 -220 Revisions to preliminary plat to address required changes.
Each preliminary plat for which changes are required shall be revised as follows:
A. Requirements identified, letter to the subdivider. If the site review committee or the
architectural review board require or recommend revisions to the preliminary plat, the
agent shall promptly issue a letter to the subdivider stating the required changes that must
be made and the recommended changes that may, in the subdivider's discretion, be made.
The letter shall be sent by first class mail, be personally delivered or, if consented to by the
subdivider in writing, by fax or email.
B. Plat revised to address required changes. The subdivider shall revise the plat to address all of
the required changes before approval of the preliminary plat by the agent. The subdivider is
not required to revise the plat to address any recommendations of the site review
committee or the architectural review board.
The agent is requiring that the following changes to plat be made before preliminary plat approval is
given:
[2.4.1] Application of bonus factors. Amend lot sizes and density calculations to reflect the
following bonus density requirements:
a. Show boundary of Rural Area on the plat and any lots partially or wholly within this
district must meet the minimum requirements of R -1 standard level density (0.97
units /acre) as outlined in Section 13.3 of the Zoning Ordinance.
b. The bonus density for internal roads cannot be applied because the internal road system
is required by the ordinance.
c. Tree preservation areas within the stream buffer cannot be applied toward the density
bonus since preservation of the stream buffer is already required by the ordinance.
Show tree preservation bonus calculations and do not include any tree preservation
areas within the stream buffer.
[14.401] Double frontage lots. Amend layout to eliminate the double frontage lots. These
requirements can be varied or excepted by the agent as provided in section 14- 203.1. The
following are double frontage lots:
a. Lots 13 -14, 51 -52 and 55 -61.
b. Tax Parcels 90E -20, 90E -30 and 90E -40 within the Mosby Mountain subdivision (Pfiester
Drive can be relocated so that there is a minimum of 20' of open space between the
road and the rear property line to prevent these lots from being double frontage)
c. Lots 44 -46 appear to be double frontage (open space between the lots and the rear
street needs to be at least 20' wide to not be considered double frontage).
VDOT comment: The proposed street layout does not satisfy the Multiple Connections in
Multiple Directions standard as defined in the Secondary Street Acceptance Requirements. An
attempt to provide a connection onto Redfields Road appears to be necessary to meet this
requirement. If permission for a new connection onto Redfields Road cannot be obtained, a
second connection at the intersection of Sunset Avenue and Country Green Road or a
connection from one of the internal cul -de -sacs to proposed Pfister Drive would be necessary to
satisfy Secondary Street Acceptance Requirements (SSAR).
[14 -233] When private streets in development areas may be authorized. If connections are not
made in accordance with VDOT requirements and roads are not accepted into state secondary
road system by VDOT then the private streets must be authorized by the Planning Commission.
4. [14 -203] Fees. There is an outstanding balance of $214.90 for notice requirements. This must be
paid prior to preliminary approval.
The agent is recommending that the following changes to the plat be made before preliminary plat
approval is given:
[14 -409] Coordination and Extension. See comment #3 above from VDOT regarding street
connections. If extensions to property lines or adjacent streets cannot be made as suggested,
this requirement may be varied or excepted by the agent as provided in section 14- 203.1. If an
exception is granted by the agent for street extension, then a 50 foot right -of -way reserved for
future dedication upon demand from the county would need to be established. The
requirement for right -of -way may be varied or excepted by the commission as provided in
section 14- 203.1. Any variations or exceptions that are needed should be initiated as soon as
possible.
These revisions must be submitted within 6 months from the date of this letter or the application will be
deemed withdrawn. Once these revisions are made, staff will grant initial site plan approval with
conditions for the final site plan, and a separate letter will be given at that time. If you have any
questions please feel free to contact me at extension 3272 or rfalkenstein @albemarle.org.
Sincerely,
Yu U we��
Rachel Falkenstein
Senior Planner