HomeMy WebLinkAboutWPO201400059 Review Comments Stormwater Management Plan 2014-07-14�pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Briarwood — Gas Station WPO Plan preparer: Scott Collins; Collins Engineering [200 Garrett St., Suite K, Charlottesville, VA 22902, scott(abcollins -en in�g com] Owner or rep.: Wendell Wood and Nena Harrell [ulcwww @embargmail.com] Woodbriar Associates [P. O. Box 5548, Charlottesville, VA 22905] Plan received date: 13 June 2014 Date of comments: 14 July, 2014 Reviewer: John Anderson Stormwater Management Plan (WP0201400059) 1. Comment applies to WP0201400059 [site], WP0201400030 [underground storage amendment], WP0201300072 [road plan WPO]): Furnish print or e -copy of state - issued Virginia Stormwater Management Program VPDES (General) Permit for Briarwood development. WPO technical review criteria depend upon General Permit status. We are in receipt of email explaining that project has VPDES permit; based upon Jul -8 email assurance, it is assumed that technical criteria listed at 9VAC25- 870- 93/ -99 (Part II C) apply, but criteria listed at 9VAC25- 870- 62/ -92 (Part II B) may apply, depending upon permit status. Further review and comment are contingent upon receipt of copy of VPDES GP. We have requested information of VDEQ as well. 2. As follow -up to conversation 25 -June, revised design will include 3.0" (min) DIA low -flow orifice at low point of 10' -DIA underground detention system. With this change, other system dimensions may change. SCS routing results may change. Please revise design, and provide revised routing calculations. Also, outfall control structure 1 should be modeled as an orifice with area equivalent to the circle segment shown in detail, sheet 4, rather than as a weir. 3. Grading and proposed 48' -15" HDPE or CMP shown within VDOT RW require VDOT permit. Explain maintenance plan for this outfall. VDOT will not maintain structure or riprap. 4. Provide specific depth, length, distance dimensions for Filterra -SWM detention system necessary to review, inspect, and construct these interconnected structures (supplement Americast typical detail on sheet 5). 5. Note —ACCD is in receipt of correspondence dated 6 -Jun 2014 from Filterra to Collins Engineering. Letter affirms design and is included with file. 6. Note - ACCD is in receipt of letters from Contech, dated 8 -Jul 2013 and 9 -Jun 2014, affirming designs of underground detention systems proposed north (WP0201400030) and south (gas station) of Briarwood Drive. Letters included with files. 7. Note - Further plan review revision request must be accompanied by a VSMP GP registration form, revised application fee, and additional information listed on a new VSMP application (WPO Virginia Stormwater Management Program Application.pdf). SWM/ESC application used as recently as Jun -30, 2014 has been replaced. New application is listed at: http : / /www.albemarle.ora/dotforms .asp ?department= cdenaMMo; it's the last in a list of .pdf files. Please feel free to call 434- 296 -583, ext. 3069 to discuss comments, especially #1 or 7. Erosion and Sediment Control Plan (WP0201400059 /plans dated 12- Jun -14) 1. Comment applies to WP0201400059 [commercial site], WP0201400030 [underground storage amendment], WP0201300072 [road plan WPO]): MS -19 — please reference Briarwood Channel Adequacy Engineering Review Comments Page 2 of 2 Report, Nov -4, 2013, rev Jun -9, 2014 (Also, e -mail, Michelle Roberge, April 4, 2014, 11:19AM). For portions of natural terrain that lie between outfalls of existing 24" CMP (MS -19 Cross Section #1) and existing 18" concrete pipe (MS -19 Cross Section #3) beneath U.S. Rte. 29 and Herring Branch: a. Photos indicate erosion down slope of pipe outfalls, an indication that receiving channels are inadequate. The computations should reflect this, and appropriate measures should be specified to correct the problem. The computations (roughness and velocities) appear to indicate conditions of adequacy that do not exist. 2. Show SF / SAF along south edge of Briarwood Drive. 3. Furnish perimeter control at NW corner of site. If site is developed prior to road (ref. SUB201400066), ESC is needed to prevent runoff at the NW corner. 4. Furnish sediment traps at low end of each diversion dike that ends at inlet (DI) of pipe beneath Briarwood Drive. IP alone is insufficient. Jul -7 -14 site visit indicates DI of pipe beneath Briarwood Drive is elevated well above existing grade, so runoff skirts this DI. Add note to modify existing grade at DI of pipe beneath Briarwood Drive to ensure that runoff from site development and road construction reaches inlet without bypassing onto paved surface of U.S. Rte. 29 (photos available). 5. Furnish IP at proposed relocated DI in the median of Rte. 29. 6. Show MU for areas to be mulched. 7. Show IP at existing inlet on the north side of Briarwood Drive, sheet 7. 8. Show crest of stone weir elevation, sheet 8 (detail), as 427'. 9. Land disturbance in VDOT RW requires VDOT permit. 10. Remove Stormwater Runoff Considerations note, sheet 6 (applies to WP0201300072). File: WP0201400059- briarwood -gas station- 071414rev