WPO file number: WP0201400035
Erosion and Sediment Control Bond Estimate
Item Item No. Unit Unit Cost cost
Number installed
stablization (PS, TS)
45.0 acres
$5,000.00
$225,000.00
all fance(SF)
4700.0 ft
$5.00
$23,500.00
safety farm(SAF)
0.0 ft
$5.00
$0.00
diversion (DD, FD, RW D)
3700 ft
$13.00
$48,100.00
temporary slope drain(TSD)
pipe length
Oft
pipe diameter
Din
$0.00
$0.00
earthwork for trap #ST1
height of dam at toe
ft
cut at high side
4 it
height of fill at face
0 ft
cut at face
2 it
length of dam
0 it
length of cut
162 it
lap width
2.5 it
width of cut
10 it
(area above transition)
0 sf
(area below transition)
28 sf
(total width of dam)
0 ft
(total width of cut)
22 ft
(height below transition)
0 ft
(depth below lransilior
2 ft
(area below transition)
0 sf
(area above transition)
18 sf
(total fill volume)
0.0 by
(total fill volume)
276.0 cy
length of spillway
60 it
(TOAL CY estimate)
276 cy
$13.00
$3,588.00
width of spillway
10 it
(spillway stone tons)
34.5 tons
$50.00
$1,725.00
earthwork for trap #ST2
height of dam at ice
6 ft
cut at high side
6 it
height of fill at face
3 ft
cut at face
3 it
length of dam
50 it
length of cut
30 it
lap width
2.5 ft
width of cut
40 it
(area above transition)
25.5 at
(area below transition)
138 sf
(total width of dam)
12 ft
(total width of cut)
58 ft
(height below transition)
3 ft
(depth below lransilior
3 ft
(area below transition)
9 sf
(area above transition)
78 sf
(total fill volume)
63.9 cy
(total fill volume)
240.0 cy
length of spillway
12 it
(TOAL CY estimate)
261 cy
$13.00
$3,39100
width of spillway
25 it
(spillway stone tons)
17.3 tons
$50.00
$86500
earthwork for trap #ST4
height of dam at tae
6 it
cut at high all
4 ft
height of fill at face
4 it
cut at face
4 ft
length of dam
100 it
length of cut
100 ft
lap width
3 it
width of cut
30 ft
(area above transition)
44 at
(area below transition)
152 at
(total width of dam)
12 ft
(total width of cut)
46 ft
(height below transition)
2 ft
(depth below transitior
0 ft
(area below transition)
8 at
(area above transition)
0 at
(total fill volume)
191 by
(total fill volume)
563.0 cy
length of spillway
0 it
(TOAL CY estimate)
627 cy
$13.00
$8,151.00
width of spillway
Oft
(spillway stone tons)
0tons
$50.00
$000
earthwork for trap #MT1
height of dam at tae
1.5 it
cut at high all
0 ft
height of fill at face
1.5 it
cut at face
0 ft
length of dam
120 it
length of cut
0 ft
lap width
20 it
width of cut
0 ft
(area above transition)
34.5 at
(area below transition)
0 at
(total width of dam)
3 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitior
0 ft
(area below transition)
0 at
(area above transition)
0 at
(total fill volume)
153.3 by
(total fill volume)
0.0 cy
length of spillway
6 it
(TOAL CY estimate)
153 cy
$13.00
$1,989.00
width of spillway
12 it
(spillway stone tons)
41 tons
$50.00
$205.00
earthwork for trap #MT2
height of dam at tae
2 it
cut at high side
0 ft
height of fill at face
2 it
cut at face
0 ft
length of dam
60 it
length of cut
0 ft
lap width
22 it
width of cut
0 ft
area above transition)
52 at
(area below bans ion)
0 sf
(total width of dam)
4 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitior
0 ft
(area below transition)
0 at
(area above transition)
0 at
(total fill volume)
115.6 cy
(total fill volume)
0.0 cy
length of spillway
6 it
(TOAL CY estimate)
116 cy
$13.00
$1,508.00
width of spillway
12 it
(spillway stone tons)
41 tons
$50.00
$205.00
earthwork for basin #1
height of dam at tae
12 it
cut at high side
10 it
height of fill at face
6 it
cut at face
6 it
length of dam
50 it
length of cut
130 it
lap width
8 it
width of cut
40 it
(area above transition)
120 at
(area below bans ion)
312 at
(total width of dam)
24 ft
(total width of cut)
72 ft
(height below transition)
6 ft
(depth below transitior
4 ft
(area below transition)
36 sf
(area above transition)
128 at
(total fill volume)
288.9 cy
(total fill volume)
2118.5 cy
length of spillway
0 it
(TOAL CY estimate)
2215 cy
$13.00
$28,795.00
width of spillway
Oft
(spillway stone tons)
0tons
$50.00
$0.00
structures for basin #1
riser height
6.5 it
riser diameter
42 in
(riser unit price)
$75.00
$487.50
barrel length
90 it
base plate or Ida
1
$200.00
$200
barrel diameter
24 in
(barrel unit price)
$50.00
$4,500.00
barrel collars
3
$200.00
$600
baffle length
4.8 ft
$50.00
$240
earthwork for basin #2
height of dam at tae
0 it
cut at high side
14 ft
height of fill at face
0 it
cut at face
8 ft
length of dam
50 it
length of cut
150 ft
tap width
8 it
width of cut
50 ft
(area above transition)
0 sf
(area below transition)
528 at
(total width of dam)
0 ft
(total width of cut)
94 ft
(height below transition)
0 ft
(depth below transitior
6 ft
(area below transition)
0 sf
(area above transition)
246 sf
(total fill volume)
0.0 by
(total fill volume)
4300.0 by
length of spillway
0 it
(TOAL CY estimate)
4300 by
$13.00
$55,900.00
width of spillway
Oft
(spillway stone tons)
0tons
$50.00
$0.00
7/23/2014
Project Name: Water Protection Ordinance Plan - Phase 1 - Amendment 1 for 5th Street Station
WPO file number: WP0201400035
Erosion and Sediment Control Bond Estimate
Item Item No. Unit Unit Cost cost
Number installed
earthwork for basin #3
structures for basin #3
sift fence inlet protection (IP)
stone inlet protection (IP)
ser height
riser diameter
barrel length
barrel diameter
height of dam at toe
height of fit at face
length of dam
lop width
(area some transition)
(total width of dam)
(height below transttion)
(area below transition)
(total fill volume)
length of spillway
width of spillway
ser height
er diameter
barrel length
barrel diameter
outlet protection (OP)
length
channel (SCC, matted)
length
check dam
depth in channel
construction entrance (CE)
base plate or fdn
wash rack
30 in
paved construction entrance
$65.00
rip -rap, placed
depth
1
width
rvey and layout (price per 0.1 mi.)
acres
mobilization
cut at high side
stream crossing (computed independently)
4 i
$144,443.00
$50.00
42 in
(rise unit price)
$75.00
70 it
base plate or fdn
1
30 in
(barrel umt price)
$65.00
$50.00
barrel collars
1
$100.00
baffle length
6 ft
20 it
cut at high side
0 ft
20 it
cut at face
0 ft
300 it
length of cut
0 ft
10 it
width of cut
0 ft
1000 at
(area below transition)
0 at
40 ft
(total width of cut)
0 It
O ft
(depth below lransilior
O ft
0 sf
(area above transition)
0 sf
11111.1 cy
(total fill volume)
0.0 cy
0 it
(TOAL CV estimate)
11111 cy
0 it
(spillway stone tons)
0 tons
8 i
48 in
(rise unit price)
$150.00
110 it
base plate or fdn
1
30 in
(barrel unit price)
$65.00
barrel collars
3
battle length
5.5 ft
15 it
width
10 ft
0 it
width
0 ft
0 ft
channel width
0 ft
0 it
length
1.0 ft
0.0
(tons)
0 tons
45
traps and basins
6
$300.00
$200.00 $200
$4,550.00
$200.00 $200
$50.00 $300
$13.00
$144,443.00
$50.00
$0.00
$1,200.00
$200.00
$200
$7,150.00
$200.00
$600
$50.00
$275
1 $100.00
$100.00
1 $200.00
$200.00
1 $675.00
$675.00
$0.00
1 $0.00
$0.00
1 $2,000.00
$2,000.00
1 $2,000.00
$2,000.00
1 $3,500.00
$3,500.00
$25,500.00
$500.00
$0.00
1 sum $602,844.50
pro
j j n t $90,426.68
contingency $69,327.12
Total $762,600