HomeMy WebLinkAboutSDP201400036 Review Comments Final Site Plan and Comps. 2014-07-24� OF AL
,. vIRGI1`IZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Out of Bounds
Plan preparer: Shimp Engineering [Justin Shimp [Justin @chimp- engineering.com]]
Owner or rep.: Vito Cetta [vitocetta @me.com]
Plan received date: 2 July 2014, and 11 July 2014
Date of comments: 24 July 2014
Reviewer: Glenn Brooks, P.E.
A. Final Site Plan (SDP201400036)
1. Provide evidence of VDOT approval, especially for the inadequate pipe at the entrance on Barracks
Rd.
2. The ribbon curb is confusing. It is not clear exactly what it is. Perhaps it is the gutter, without curb. A
detail was not found. If CG -91) is provided, it would appear to connect most everywhere, leaving no
room for curbing. In addition, the CG -91) is built to connect at standard curb height where the radius
terminates (section B -B). This would ideally be a detail of your road plans.
B. Road and drainage plans (SDP200400042)
1. A road plan has not been provided separate from the site plan. In order for bonds to be processed for
these roads, a separate road plan will be required. This will be needed before final plat approvals.
C. VSMP: SWPPP: PPP
A stormwater pollution prevention plan has not been provided. A pollution prevention plan has not
been provided. A copy of the registration statement or a letter of permit coverage have not been
provided. No VSMP fees have been provided. If these have been submitted to the state, and permit
coverage has been obtained, please submit the approval letter, and a copy of the full SWPPP
documents.
D. VSMP: SWPPP: Stormwater Management Plan (WP0201400024)
1. Please clarify the berm at the rear of the site above the lots on Smithfield Road. Show this clearly on
the plan behind all townhouse units to ensure that no runoff is directed or overflows into the existing
neighborhood. On the cross - section detail of the pipe system, draw and label the berm on the proposed
ground elevation.
E. VSMP: SWPPP: Erosion Control Plan (WP0201400024)
1. This plan is satisfactory.
File: E10 _vsmp,fsp_GEB_OutofBounds.doc