Loading...
HomeMy WebLinkAboutWPO201400044 Review Comments Bond Estimate 2014-08-05Project Name: AT &T Erosion & Sediment Control Plan WPO file number: WP0201400044 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stal lization (PS, TS) 0.1 acres $5,000.00 $250.00 all fence (SF) 160.0 ft $5.00 $600.00 safety fence(SAF) 0.0 ft $5.00 $0.00 diversion (DD, FD, RW D) 0 ft $13.00 $0.00 temporary slope drain(TSD) pipe length Oft pipe diameter Din $0.00 $0.00 earthwork for trap /basin height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft lap width 0 ft width of cut 0 ft (area above transition) 0 sf (area below transition) 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transition) O ft (depth below lransilior 0 ft (area below transition) 0 sf (area above transition) 0 sf (total fill volume) 0.0 cy (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate) 0 cy $13.00 $0.00 width of spillway Oft (spillway stone tons) 0tons $50.00 $0.00 structures for basin riser height 0 ft riser diameter 0 in (rise unit price) $0.00 $0.00 barrel length 0 ft base plate or fda 0 $200.00 $0 barrel diameter 0 in (barrel unit price) So OO $0.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 sit fence inlet protection(IP) 0 $100.00 $0.00 stone inlet protection(IP) 0 $200.00 $0.00 outlet protection (OP) length 0 it width 0 ft 0 $0.00 $0.00 channel (SCC, matted) length 0 it width 0 ft 0 $0.00 check dam depth in channel 0 it channel width 0 ft 0 $0.00 $0.00 construction entrance (CE) 1 $2,000.00 $2,000.00 wash rack 0 $2,000.00 $0.00 paved construction entrance 0 $3,500.00 $0.00 rip-rap, placed depth 0 it length 0.0 ft width 0.0 (tons) 0 tons $60.00 $0.00 uri and layout (price par 0.1 mi.) acres 0 traps and basins 0 $0.00 mobilization $500.00 stream crossing (computed independently) $0.00 cost sum $3,550.00 prcj mgmt $532.50 contingency $406.25 Total $4,500 8/5/2014