HomeMy WebLinkAboutWPO201400044 Review Comments Bond Estimate 2014-08-05Project Name: AT &T Erosion & Sediment Control Plan
WPO file number: WP0201400044
Erosion and Sediment Control Bond Estimate
Item Item
No. Unit
Unit Cost
Cost
Number
installed
stal lization (PS, TS)
0.1 acres
$5,000.00
$250.00
all fence (SF)
160.0 ft
$5.00
$600.00
safety fence(SAF)
0.0 ft
$5.00
$0.00
diversion (DD, FD, RW D)
0 ft
$13.00
$0.00
temporary slope drain(TSD)
pipe length
Oft
pipe diameter
Din
$0.00
$0.00
earthwork for trap /basin
height of dam at toe
0 ft
cut at high side
0 ft
height of fill at face
0 ft
cut at face
0 ft
length of dam
0 ft
length of cut
0 ft
lap width
0 ft
width of cut
0 ft
(area above transition)
0 sf
(area below transition)
0 sf
(total width of dam)
0 ft
(total width of cut)
0 ft
(height below transition)
O ft
(depth below lransilior
0 ft
(area below transition)
0 sf
(area above transition)
0 sf
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
length of spillway
0 ft
(TOAL CY estimate)
0 cy
$13.00
$0.00
width of spillway
Oft
(spillway stone tons)
0tons
$50.00
$0.00
structures for basin
riser height
0 ft
riser diameter
0 in
(rise unit price)
$0.00
$0.00
barrel length
0 ft
base plate or fda
0
$200.00
$0
barrel diameter
0 in
(barrel unit price)
So OO
$0.00
barrel collars
0
$200.00
$0
baffle length
0 ft
$50.00
$0
sit fence inlet protection(IP)
0
$100.00
$0.00
stone inlet protection(IP)
0
$200.00
$0.00
outlet protection (OP)
length
0 it
width
0 ft
0
$0.00
$0.00
channel (SCC, matted)
length
0 it
width
0 ft
0
$0.00
check dam
depth in channel
0 it
channel width
0 ft
0
$0.00
$0.00
construction entrance (CE)
1
$2,000.00
$2,000.00
wash rack
0
$2,000.00
$0.00
paved construction entrance
0
$3,500.00
$0.00
rip-rap, placed
depth
0 it
length
0.0 ft
width
0.0
(tons)
0 tons
$60.00
$0.00
uri and layout (price par 0.1 mi.)
acres
0
traps and basins
0
$0.00
mobilization
$500.00
stream crossing (computed independently)
$0.00
cost sum
$3,550.00
prcj mgmt
$532.50
contingency
$406.25
Total
$4,500
8/5/2014