Loading...
HomeMy WebLinkAboutARB201400102 Review Comments Miscellaneous Submittal 2014-08-22�'IRGINLP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 22, 2014 Bill Akers Capital Signs 11214 Howard Mills Road Glen Allen, VA 23059 RE: ARB- 2014 -102: BP- Fasmart Signs, 241 Rolkin Road Dear Ms. Akers, I have reviewed the above -noted sign application. The following revisions are requested to make the proposal consistent with the Entrance Corridor Sign Guidelines. 1. The $120 Architectural Review Board (ARB) application review fee has not been received. ARB approval cannot be issued until that fee has been received. On the check provided, indicate that it is for ARB201400100, BP- Fasmart Signs. 2. Regarding the proposed wall sign: a. ARB Sign Guidelines state that wall signs shall be integrated with the architecture of the building and not obscure architectural details. They also state that the size of a wall sign shall be coordinated with the size of the architectural element on which it is placed. The proposed sign appears to be oversized for the wall area, extending into the brick corner detailing to each side. Revise the proposal by reducing the overall length of the sign so that a minimum of 6 inches of wall area shows between each end of the sign and the brick corner detailing. b. Revise the sign drawing to indicate the Pantone color for the channel letter and graphic trim caps and returns. 3. Regarding the refaced cabinet panel: a. Revise the sign drawing to indicate the Pantone text and graphic colors. b. Indicate if lighting is existing, internal to remain. If LED is proposed, add the following note to the drawing: The level of illumination provided by the LED lights will not exceed the illumination produced by a single stroke of 30 milliamp (ma) neon. Please respond by email within 15 days of the date of this letter indicating whether you will or will not proceed with these revisions. Your decision to make the revisions will suspend the 60 -day review period associated with your original submittal. If you choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the application without further revisions. If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your revisions and completing this review with an approval letter. Sincerely, Brent Nelson Planner cc: ARB File