HomeMy WebLinkAboutSDP201300059 Review Comments Minor Amendment 2014-01-02Albemarle
•
Service �1uth6rity
TO: Sarah Baldwin
FROM: Alexander J. Morrison, Civil Engineer
DATE: January 2, 2013
RE: Site Plan Technical Review for: SDP201359- Rio Square Building G Minor
TM P #62A1 -05 --4
The below checked items apply to this site.
✓ 1. This site plan is within the Authority's jurisdictional area for:
✓
A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
✓
2.
A 4 inch water line is located approximately 17' distant.
3.
Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
✓
4.
A 8 inch sewer line is located approximately 22' distant.
5.
An Industrial Waste Ordinance survey form must be completed.
✓
6.
No improvements or obstructions shall be placed within existing or future
easements.
7.
and plans are currently under review.
8.
and plans have been received and approved.
9.
No plans are required.
10.
Final and plans are required for our review and approval prior to
granting tentative approval.
11.
Final site plan may /may not be signed.
12.
RWSA approval for water and /or sewer connections.
13.
City of Charlottesville approval for sewer.
✓
Comments:
• Show existing sewer main alignment upstream and downstream of SSMH shown on
plans (Existing SSMH Shown is RioSq -1 -3).
• Show existing waterline infrastructure which supplies the proposed fire -line and water
meter.
• Show existing ACSA easements on water and sewer infrastructure.
• Provide fixture counts when available so the water meter can be sized and the connection
fees can be calculated.