Loading...
HomeMy WebLinkAboutARB201300186 Review Comments Final Site Plan and Comps. 2014-08-12• ^�- 11�illr IlIIf1.�• COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 12, 2014 Michael Myers, RE Dominion Engineering 172 S. Pantops Dr. Charlottesville, Va 22911 RE: ARB- 2013 -186: Cascadia Blocks 4 -7 TMP 06200000002500, 07800000005900, 078000000059A0, 078E0000000 Dear Mike, I have reviewed the plan with revision date of 7/24/14 submitted for the above - referenced application. The revisions included in this set of drawings resolve the remaining outstanding conditions of ARB approval. You may consider this letter your Certificate of Appropriateness. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. Please note the following: 1. This application is approved with the condition that mechanical equipment shall not be visible from the Entrance Corridor. 2. Changes made to the site or architectural plans after issuance of a Certificate of Appropriateness can delay the signing of mylars and the approval of building permits. It is in the applicant's best interest to notify ARB staff of such changes and to initiate the review of amendments to ARB- approved plans to avoid future delays. 3. Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid. If there is no site plan required for the proposed work, the Certificate of Appropriateness is valid for 3 years. Applicants requesting an extension of the period of validity must do so in writing. The letter must be received by the Director of Planning prior to the expiration date. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Margaret Maliszewski Principal Planner cc: Cascadia Development LLC, 170 South Pantops Dr., Charlottesville VA 22911 File