COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
August 26, 2014
Scott Collins
C/O Collins Engineering
200 Garrett Street, Suite K
Charlottesville, Va 22902
RE: ARB201400090 Acme Stove
Dear Mr. Collins:
The Albemarle County Architectural Review Board reviewed the above noted item at its
meeting on Monday, Augsut 18, 2014. The Board, by a vote of 4:0 approved the request,
pending staff administrative approval of the following conditions:
1. Indicate the tower entrances on the site plan.
2. Coordinate the sidewalk location with the tower entrance.
3. Provide detail drawings for the trellis and canopies. With specification of material
that has proven to perform successfully in an exterior application over an
extended period of time.
4. Add window glass notes to the architectural drawings showing that visible light
transmittance (VLT) shall not drop below 40% and visible light reflectance (VLR)
shall not exceed 30 %.
5. Provide a detail for the dumpster screening wall and identify the wall materials.
6. Increase the height of the equipment screening shrubs to fully screen the
equipment at planting.
7. Add the standard mechanical equipment note to the architectural drawings.
"Visibility of all mechanical equipment from the Entrance Corridor shall be
eliminated."
8. Provide a lighting plan including all site and exterior building lighting for review.
9. Correct the lighting note on the cover sheet to include the standard language:
"Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial
lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect
light away from adjoining residential districts and away from adjacent roads. The
spillover of lighting from luminaires onto public roads and property in residential
or rural areas zoning districts shall not exceed one -half footcandle."
10. Revise the IG and IC shrub heights to 24" minimum at planting.
11. Revise the design of the signs on the tower to include a more restrained palette
that is consistent with the architecture of the building.
Please provide:
1. Two full sets of revised drawings addressing each of these conditions. Include
updated ARB revision dates on each drawing.
2. A memo including detailed responses indicating how each condition has been
satisfied. If changes other than those requested have been made, identify those
changes in the memo also. Highlighting the changes in the drawing with "clouding"
or by other means will facilitate review and approval.
3. The attached "Revised Application Submittal" form. This form must be returned with
your revisions to ensure proper tracking and distribution.
When staff's review of this information indicates that all conditions of approval have been
met, a Certificate of Appropriateness may be issued.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Margaret Maliszewski
Principal Planner
CC: IWE LLC
905 Resort Dr
Massanutten Va 22840
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County staff
has indicated below what they think will be required as a resubmission of revisions. If you need to submit
additional information please explain on this form for the benefit of the intake staff. All plans must be
collated and folded to fit into legal size files, in order to be accepted for submittal.
TO: Maraaret Maliszewski
PROJECT NAME: ARB201400090 Acme Stove
DATE:
Submittal Type Requiring Revisions ( ) indicates Submittal Cade
County Project Number
# Copies
Erosion & Sediment Control Plan (E &S)
# Copies
Distribute To:
Mitigation Plan MP
2
Margaret
Maliszewski
Waiver Request (WR)
Stormwater Management Plan SWMP
Road Plan (RP)
Private Road Request, with private/ public comparison (PRR)
Private Road Request — Development Area (PRR -DA)
Preliminary Site Plan PSP
Final Site Plan (or amendment) (FSP)
Final Plat FP
Preliminary Plat (PP)
Easement Plat EP
Boundary Adjustment Plat (BAP)
Rezoning Plan REZ
Special Use Permit Concept Plan (SP -CP)
Reduced Concept Plan (R -CP)
Proffers (P)
Bond Estimate Request (BER)
Draft Groundwater Management Plan (D -GWMP)
Final Groundwater Management Plan (F -GWMP)
Aquifer Testing Work Plan (ATWP)
Groundwater Assessment Report (GWAR)
Architectural Review Board (ARB)
ARB2014 -90
Other: Please explain
(For staff use only)
Submittal Code
# Copies
Distribute To:
Submittal Code
# Copies
Distribute To:
ARB
2
Margaret
Maliszewski