Loading...
HomeMy WebLinkAboutARB201400090 Review Comments Final Site Plan and Comps. 2014-08-18Lrf2C;l1�ZA COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 26, 2014 Scott Collins C/O Collins Engineering 200 Garrett Street, Suite K Charlottesville, Va 22902 RE: ARB201400090 Acme Stove Dear Mr. Collins: The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, Augsut 18, 2014. The Board, by a vote of 4:0 approved the request, pending staff administrative approval of the following conditions: 1. Indicate the tower entrances on the site plan. 2. Coordinate the sidewalk location with the tower entrance. 3. Provide detail drawings for the trellis and canopies. With specification of material that has proven to perform successfully in an exterior application over an extended period of time. 4. Add window glass notes to the architectural drawings showing that visible light transmittance (VLT) shall not drop below 40% and visible light reflectance (VLR) shall not exceed 30 %. 5. Provide a detail for the dumpster screening wall and identify the wall materials. 6. Increase the height of the equipment screening shrubs to fully screen the equipment at planting. 7. Add the standard mechanical equipment note to the architectural drawings. "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 8. Provide a lighting plan including all site and exterior building lighting for review. 9. Correct the lighting note on the cover sheet to include the standard language: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one -half footcandle." 10. Revise the IG and IC shrub heights to 24" minimum at planting. 11. Revise the design of the signs on the tower to include a more restrained palette that is consistent with the architecture of the building. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner CC: IWE LLC 905 Resort Dr Massanutten Va 22840 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Maraaret Maliszewski PROJECT NAME: ARB201400090 Acme Stove DATE: Submittal Type Requiring Revisions ( ) indicates Submittal Cade County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan MP 2 Margaret Maliszewski Waiver Request (WR) Stormwater Management Plan SWMP Road Plan (RP) Private Road Request, with private/ public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan PSP Final Site Plan (or amendment) (FSP) Final Plat FP Preliminary Plat (PP) Easement Plat EP Boundary Adjustment Plat (BAP) Rezoning Plan REZ Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2014 -90 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Margaret Maliszewski