Loading...
HomeMy WebLinkAboutARB201400095 Review Comments Final Site Plan and Comps. 2014-08-26Lrf2C;l1�ZA COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 26, 2014 Brian P. Smith, PE C/O Civil Eng. Inc. 4835 Three Chopt Road Troy, Va. 22974 RE: ARB201400095 Faith Christian Center International Dear Mr. Smith: The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, Augsut 18, 2014. The Board, by a vote of 4:0 approved the request, pending staff administrative approval of the following conditions: 1. Continue the corner bay detailing around the southwest corner of the building. 2. Consider using synthetic stucco instead of EIFS. 3. Add a material /color schedule to the elevation sheets and key the materials to the drawing. 4. Revise the site plan to include the building phase line. If it is anticipated that the phase 2 building will be visible from the EC, additional ARB review will be required. 5. Show on the landscape plan the plants intended to hide the pipes near the site entrance. 6. Make the light fixture cut sheets legible. 7. Indicate on the plan that the color of the light poles and fixtures will be bronze. Note that the 20' light height maximum includes poles and bases 8. Remove the note on sheet L5 that references a 500' ARB limit and correct the corresponding plant sizes. 9. Provide the landscape plan at a more legible scale. Make the key numbers easily legible. 10. Delete the text after the first sentence in note #4 on the landscape plan. 11. Clarify the intent of the Stream Buffer Mitigation notes on the landscape plan. If a replanting method other than that required as a condition of the Special Use Permit is proposed, submit an application to amend the Special Use Permit. Otherwise, provide details to clarify how the buffer replanting will be accomplished, consistent with the conditions of the Special Use Permit. 12. Coordinate the plans regarding the low wall located south of the building. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner CC: Faith Christian Center International Inc Po Box 2306 Charlottesville Va 22902 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Margaret Maliszewski DATE: PROJECT NAME: ARB201400095 Faith Christian Church Submittal Type Requiring Revisions ( ) indicates submittal Cade County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan MP 2 Margaret Maliszewski Waiver Request (WR) Stormwater Management Plan SWMP Road Plan (RP) Private Road Request, with private/ public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan PSP Final Site Plan (or amendment) (FSP) Final Plat FP Preliminary Plat (PP) Easement Plat EP Boundary Adjustment Plat (BAP) Rezoning Plan (REZ Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2014 -95 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Margaret Maliszewski