Loading...
HomeMy WebLinkAboutWPO201300032 Review Comments WPO VSMP 2014-09-02� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Cascadia, blocks 4 -7 Plan preparer: Dominion Engineering, Mike Myers [mmyers @dominioneng.com] Owner or rep.: Redus VA Housing LLC., Charlie Armstrong [carmstrong@southern- development.com] Plan received date: 29 July 2014 Rev.A: 25 Aug 2014 Date of comments: 5 Aug 2014 Rev.A: 2 Sep 2014 Reviewer: Glenn Brooks, P.E. The Cascadia plans have received Engineering Review. The Following items will need to be adequately addressed prior to final approval: A. Street plan (SUB2013000091) (A separate road and drainage plan is required if the property is to be bonded for subdivision.) 1. VDOT approval is required. We are awaiting approval from VDOT. B. Site plan (SDP2013000025) (A site plan is a record of zoning compliance on the property. It should not include VSMP plans.) All comments appear to be addressed. The stormwater management plan and road plans will need to be approved before I can recommend approval to planning. C. Plat (SUB2014000106) (A plat is a record of property division or reservation. Code Chapter 14) 1. All streets and infrastructure must be approved and bonded prior to plat approval. 2. All easements must match approved stormwater and street plans. Please include all stormwater facility easements, access, and easements for mitigation areas, per the VSMP plans. D. VSMP: SWPPP and Pollution Prevention Plan (WP02013000032) (The Virginia stormwater management program, stormwater pollution prevention plan application and documents) 1. Please provide the DEQ coverage letter. E. VSMP: SWPPP: Stormwater Management Plan (WP020130000032) 1. Show vehicle access to all facilities with easements. Include easement to pond 1 from Delphi or an internal road. Include access to the biofilters and water quality swale. Engineering Review Comments Page 2 of 2 Rev.A: Acces to BF -1 and the Water Quality Swale was not found. It is not clear how vehicles get to the facility itself, or how the proposed access road gets beyond BF -2 and outfall. All accesses need to be a minimum 10' wide. Please update the other sheets of the plan to match. The erosion control sheets do not match. Regarding the water quality Swale: 12. Provide accurate details for the water quality swale. Show soil mixture, underdrain, minimum bottom width, maximum slope, side slopes and top width. Rev.A: The soil mixture and underdrain were not shown. The grassed swale option does not appear to obtain the needed removal rate. 13. Provide computations to show hydraulic adequacy per standard spec. 3.13. Rev.A: The calculations appear to show depths greater than the weirs. F. VSMP: SWPPP: Erosion and Sediment Control Plan (WPO2013000032) 1. The erosion and sediment control plan is approved. Comments have been addressed. G. Mitigation Plan (WPO2013000032) (A mitigation plan is a plan of buffer disturbances, and replanting or restorative measures) 1. The mitigation plan is approved. Buffers and easements for mitigation areas will need to be shown on final plats. H. Bond Estimate Request for VSMP plans (WPO2013000032) 1. The bond estimate request will be processed when all VSMP plans are approved. File: E13_ rp ,fsp,fpt,vsmp_GEB_Cascadia.doc