Loading...
HomeMy WebLinkAboutARB201400116 Review Comments Miscellaneous Submittal 2014-09-10�'IRGINLP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 September 9, 2014 David Miller 1615 Elmwood Court Unit 203 Charlottesville, VA 22903 RE: ARB- 2014 -116: Kingdom Hall Sign Dear Mr. Miller, I have reviewed the above -noted sign application. The following revisions are requested to make the proposal consistent with the Entrance Corridor Sign Guidelines. 1. Albemarle County Architectural Review Board (ARB) Sign Guidelines indicate that logos and graphics should be incorporated as an integral part of the overall sign. The graphic /logo ( "JW.org "), in the proposed location on the monument post, does not have an integrated appearance with the two existing sign panels. The sign post was not designed to act as a location for signs or sign graphics. As a result, the graphic in that location has a disproportionate and awkward appearance, overcrowding the post. Redesigning the existing sign panel(s) to include the proposed graphic or locating the graphic on the brick base (below the horizontal brick header course) could have a more appropriate appearance. Locating the graphic on the brick base would require a revision to the approved planting plan, as shrubs are to be planted in front of the sign. 2. Revise the sign drawing by labeling the proposed sign materials and provide a sample of the sign colors or revise the drawing to indicate the Pantone color numbers for those colors (the blue background and text color). 3. The required $120 Architectural Review Board (ARB) application review fee has not been received. ARB approval cannot be issued until that fee has been received. On the check provided, indicate that it is for ARB201400116, Kingdom Hall Sign. Please respond by email within 15 days of the date of this letter indicating whether you will or will not proceed with these revisions. Your decision to make the revisions will suspend the 60 -day review period associated with your original submittal. If you choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the application without further revisions. If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your revisions and completing this review with an approval letter. Sincerely, Brent Nelson Planner cc: ARB File