Loading...
HomeMy WebLinkAboutSUB201400079 Review Comments Bond Inspection 2014-09-22�RGICn4' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 Subdivision Bond Inspection Bond Title: Belvedere Town Center, phase 3 (Belvedere Way alley and parking lot) File Number: SUB201200133 Date of inspection: 18 Sep 2014 Reviewer: John Anderson Original Bond Amount: $162,230 Phone: (434) 296 -5832 x. 3069 Current Bond Amount: $38,510 Your bond inspection request has been processed. This list contains an update on the items received and approved. Received Y N ■ ❑ Completed inspection request and fee Approved Y N N/A VDOT ■ ❑ ❑ ❑ ■ ❑ As -built plan, updated, sealed to current date, per As -built policy ❑ ■ ❑ ❑ As -built plans, ' 06.26.14, sheets 1 -5, require PE signature. Certain items marked as incomplete, and RCP pipe labels, require revision, as nearly all storm lines are HDPE, and since certain items (marked incomplete) are complete. As -built should show and dimension pipe 113, show and label inlet 118A, Belvedere Way. ■ ❑ Copies of recorded plats for right -of -way, easements ■ ❑ ❑ ❑ ❑ ❑ VDOT approval AM -4.3, or partial completion via punchlist ❑ ❑ ■ ❑ ■ ❑ Letter from P.E. certifying improvements to date are built to plan ■ ❑ ❑ ❑ When ALL items are complete, please provide subsequent letter for this specific bond. Note changes from design, cite inspections, verifiable data, etc. ■ ❑ Current certification form completed by owner /developer ■ ❑ ❑ ❑ ■ ❑ CBR test reports for each road ■ ❑ ❑ ❑ Listed complete under prior bond reduction ■ ❑ Stone depth and material inspection reports (or core tests) ■ ❑ ❑ ❑ ■ ❑ Pavement depth and material inspection reports (or core tests) ■ ❑ ❑ ❑ ■ ❑ Compaction test reports for fill areas under road ■ ❑ ❑ ❑ ❑ ■ Pipe trench inspection reports —may not exist; to be addressed later. ❑ ❑ ❑ ❑ ■ ❑ Pipe interior inspections reports and video ❑ ■ ❑ ❑ Video should be reviewed to ensure VDOT IS -1 inlet shaping is provided at ea. MH. ■ ❑ Concrete test reports for structural concrete, curbing, aprons, etc. ■ ❑ ❑ ❑ Marked approved, 14 Mar 2014 subdivision bond inspection report ❑ ■ Structural inspection reports for any bridges or box culverts ❑ ❑ ■ ❑ ❑ ❑ County road name signs and posts, or a sign agreement for alt. posts ■ ❑ ❑ Field verified —19- Sep -14 Updated bond amount based on completed work: $38,510 Please refer to on -line content at http: / /www.albemarle.ora/del2tforms .asp ?department= cdengwTo for checklists and procedures. Additional bond reduction contingent upon: completing items noted on sheet 2, As -built plans, Notes 1 -4 (especially asphalt curb replacement /DI -7 grate work, Alley D); inlet shaping, per approved SUB201200122, sheet DP -3 (Many MHs visible in 11 videos of 18 viewed show need for MHfloor /inlet shaping. Video review suspended until MHs receive VDOT IS -1); and completing landscape plantings (95 of 134 street landscape plants installed). File: bond inspection checklist sub20l200133- belveder - phlll- 091914