Loading...
HomeMy WebLinkAboutARB201300187 Review Comments Final Site Plan and Comps. 2014-08-28• ^�- 11�illr IlIIf1.�• COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 27, 2014 Daniel R. Hines, PE Bohler Engineering 28 Blackwell Park Lane, Suite 201 Warrenton, VA 20186 RE: ARB- 2013 -187 Fifth Street Station Final Site Plan - Wegman's Dear Daniel, I've reviewed the recently submitted plans (site plan and road plan with revision date of 8/14/2014, architectural elevations dated 8/22/14) for the above - referenced project. The revisions included in these drawings resolve the outstanding Entrance Corridor site plan issues. You may consider this letter your Certificate of Appropriateness. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. Please note the following: 1. This application is approved with the condition that mechanical equipment shall not be visible from the Entrance Corridor. The parapet height has been adjusted to accomplish this screening. However, the parapet height increase has altered the proportions of the wall facing the I64 Entrance Corridor. ARB confirmation that the revised wall design is acceptable is required. This confirmation is required prior to Design Planner sign -off on the building permit for the Wegman's store. We will contact you after the September 2 ARB meeting if additional information or revisions are required for permit approval. 2. Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid. If there is no site plan required for the proposed work, the Certificate of Appropriateness is valid for 3 years. Applicants requesting an extension of the period of validity must do so in writing. The letter must be received by the Director of Planning prior to the expiration date. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Margaret Maliszewski Principal Planner cc: ARB- 2013 -187