COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Rivanna Pump Station and Rivanna Interceptor Tunnel —VSMP Permit
Plan preparer: Hazen and Sawyer
Owner or rep.: Rivanna Water and Sewer Authority
Plan received date: 5 Sep 2014
Date of comments: 17 Oct 2014
Reviewer: Michelle Roberge
A. WPO (WP02013000038)
Engineering has completed the review of the Stormwater Pollution Prevention Plan
(SWPP) and the Pollution Prevention Plan (PPP). Please complete the attached documents and add
to the SWPP. Also, the SWPP and PPP should be signed by the operator. Please remove page 22 if
Hazen and Sawyer will not act as the operator.
Sincerely,
�P�
Michelle Roberge
Section 6. Pollution Prevention Plan.
(reference County Code 17 -404 and State Regulation 9VAC25- 880 -70 part II section AA)
A. Plan showing pollution activities and prevention practices
(l?rovi.de a reduced 1.1x1.7 copy of a site plan on. which. all oftla.e following activity locations are
clearly marked. Deep this plan up -to -date with ongoing site changes and inspections.)
C. Sources of Pollutants, continued. Common activities and minimum control and
Clearing, grading, excavating, and un-
stabilized areas
Paving operations
Concrete washout and
cement waste
Structure construction, stucco,
painting, and cleaning
Dewatering operations
Material delivery and storage
Land disturbance area
Roads and driveways
Current location and detail shown on
plan
Structures
Dewatering sites shown on plan
Designated area shown on plan
Follow Erosion and Sediment Control
Plan. Dispose of clearing debris at
acceptable disposal sites. Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip pans
and absorbentloil dry for all paving
machines to limit leaks and spills
Direct concrete wash water into a leak-
proof container or leak -proof settling basin
that is designed so that no overflows can
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
in a flat unpaved area. Prevent the
discharge of soaps, solvents, detergents
and wash water, paint, form release oils
Water shall be filtered, settled or simil
treated prior to discharge as shown on
Designated areas for material delivery and
storage. Placed near construction
entrances, away from waterways and
Material use during building process Building areas Follow manufacturer's instructions MSDS's attached.
waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
Current designated container areas on Waterway. Containers have lids covered
Solid waste disposal plan before periods of rain, or are in a covered
area. Scheduled collection to prevent
overfilling. MATERIALS NOT TO BE
BURIED ON -SITE
Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building
products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary
waste, and other materials present on the site to precipitation and to stormwater.
(Identify all non - stormwater discharges to occur on your site. Keep this plan up -to -date with
ongoing site changes and inspections. See C;GP, 9VAC;25- 884 -70 section E. for examples of
non- stornivvater discharges.)
Convenient and well- maintained portable
sanitary facilities will be provided, and
Sanitary waste
Current locations shown on plan
located away from waterways or inlets.
Such facilities shall be regularly
maintained.
Apply fertilizers in accordance with
Landscaping operations
Landscape areas shown on plan
manufacturer's recommendations and not
during rainfall events
To be %treated in a sediment basin or better
control as specified on plan. Minimize
Wash Waters
Wash areas shown on plan
the discharge of pollutants from
equipment and vehicle washing
Vehicle and equipment washing
Designated areas and details shown on
Provide containment and filtering for all
plan
wash waters per the plan
Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building
products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary
waste, and other materials present on the site to precipitation and to stormwater.
(Identify all non - stormwater discharges to occur on your site. Keep this plan up -to -date with
ongoing site changes and inspections. See C;GP, 9VAC;25- 884 -70 section E. for examples of
non- stornivvater discharges.)
E. Persons responsible for pollution prevention practices
(Provide the names and contact information for all persons responsible for prevention practices
as listed above.)
F. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and
implement chemical spill and leak prevention and response procedures as follows.
Respond to all spills, leaks and discharges as follows;
Report all spills, leaks and discharges as follows;
(Provide detailed response and reporting practices according to 9VAC'25-880-70, Part 11', section.
AA.e.)
G. Pollution Prevention Awareness
(Describe training and procedures to provide awareness and compliance for all measures in. this
document; tAraste management, wash. waters, prevention measures, etc.)
Section 7. Discharges to impaired waters, surface waters within an
applicable TMDL wasteload allocation, and exceptional waters.
(Provide detailed measures for any applicable TMDL)
Section 8. Qualified personnel
The following personnel are responsible for inspections;
(Provide the telephone number, mid qualifications of the qwffi.fied personnel conducting
inspections.)
Section 9. Signed Certification
(Provide certification according, to 9VAC`25- 870 -370)
CERTIFICATION
" I certify under penalty of law that this document and all attachments were prepared under my
direction or supervision in accordance with a system designed to assure that qualified personnel
properly gather and evaluate the information submitted. Based on my inquiry of the person or
persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including. the possibility of fine and imprisonment for knowing violations."
Operator Name:
Company:
Title:
Signature:
Date:
Section 10. Delegation of authority.
(.Provide the persons or posi.tians With. a tbority to sign fii. pection :reports or to modify the
storm ,,vater pollution prevention plan. A forrnal, signed delegation of authority is needed.)
Delegation of Authority
I, (name), hereby designate the person or specifically described position
below to be a duly authorized representative for the purpose of overseeing compliance with
environmental requirements, including the Construction General Permit, at the
construction site. The designee is authorized to sign any
reports, stormwater pollution prevention plans and all other documents required by the permit.
(name of person or position)
(company)
(address)
(city, state, zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation
as set forth in the Construction General Permit (CGP), and that the designee above meets the
definition of a "duly authorized representative ".
Operator Name:
Company:
Title:
Signature:
Date: