TO: Ellie Ray Carter
FROM: Alexander J. Morrison, E.I.T., Civil Engineer
DATE: September 2, 2014
RE: Site Plan Technical Review for: SUB2014000126: Belvedere Phase IIB - Preliminary
Subdivision Plat
The below checked items apply to this site.
✓ 1. This site plan is within the Authority's jurisdictional area for:
✓
A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
✓ 2.
A 12 inch water line is located approximately on site distant.
3.
Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
✓ 4.
An 8 inch sewer line is located approximately on site distant.
5.
An Industrial Waste Ordinance survey form must be completed.
✓ 6.
No improvements or obstructions shall be placed within existing or future
easements.
7.
and plans are currently under review.
8.
and plans have been received and approved.
9.
No plans are required.
✓ 10.
Final water and sewer plans are required for our review and approval prior to
granting final approval on the final site development plan.
11.
Final site plan may /may not be signed.
12.
RWSA approval for water and /or sewer connections.
13.
City of Charlottesville approval for sewer.
✓
Comments:
- Submit 3 sets of final plans (utility plans) along with water /sewer data sheets to the ACSA, Attn:
Jeremy Lynn, P.E., for full construction review.
- The ACSA will be unable to recommend approval of the final SUB and SDP until all outstanding
construction inspection invoices with the ACSA are paid in full.
- The proposed FHA near Lot 1 is in conflict with the existing sewer.
- The existing watermain stub -out along Belvedere Drive is a 12 ", not an 8 ". Update the stub -out
size and existing offsite waterline sizes accordingly.
168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698
www.serviceauthority.org
Albemarle County
Service Authority
The Albemarle County Service Authority (ACSA) has no technical comments on the SUB
being reviewed. Engineering comments are usually reserved for the site plan review stage.
Subdivision plats should correctly show ownership of properties and existing easements. Recordation
of new easements should occur before dedication to and acceptance by the ACSA.
The ACSA can review the proposed subdivision plat and determine if it is included in the
jurisdictional area for water and /or sewer service. Water and /or sewer connections to the ACSA
system are allotted on a first come, first served basis at the time connection fees are paid. The ACSA
does not reserve capacity in its system for a specific project.