HomeMy WebLinkAboutWPO201300032 Review Comments WPO VSMP 2014-09-16� OF AL
,. vIRGI1`IZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Cascadia, blocks 4 -7
Plan preparer: Dominion Engineering, Mike Myers [mmyers @dominioneng.com]
Owner or rep.: Redus VA Housing LLC., Charlie Armstrong [carmstrong@southern-
development.com]
Plan received date: 9 Sep 2014
Date of comments: 16 Sep 2014
Reviewer: Glenn Brooks, P.E.
The Cascadia plans have received Engineering Review.
A. Street plan (SUB2013000091)
(A separate road and drainage plan is required if the property is to be bonded for subdivision.)
1. VDOT approval is required. We are awaiting approval from VDOT.
B. Site plan (SDP2013000025)
(A site plan is a record of zoning compliance on the property. It should not include VSMP plans.)
All comments appear to be addressed. The stormwater management plan and road plans will need to
be approved before I can recommend approval to planning.
C. Plat (SUB2014000106)
(A plat is a record of property division or reservation. Code Chapter 14)
1. All streets and infrastructure must be approved and bonded prior to plat approval.
2. All easements must match approved stormwater and street plans. Please include all stormwater facility
easements, access, and easements for mitigation areas, per the VSMP plans.
D. VSMP: SWPPP and Pollution Prevention Plan (WP02013000032)
(The Virginia stormwater management program, stormwater pollution prevention plan application and
documents)
1. Please provide the DEQ coverage letter.
E. VSMP: SWPPP: Stormwater Management Plan (WP020130000032)
1. This is approved based on the grandfathering provisions.
F. VSMP: SWPPP: Erosion and Sediment Control Plan (WP02013000032)
Engineering Review Comments
Page 2 of 2
1. The erosion and sediment control plan is approved. Comments have been addressed.
G. Mitigation Plan (WPO2013000032)
(A mitigation plan is a plan of buffer disturbances, and replanting or restorative measures)
1. The mitigation plan is approved. Buffers and easements for mitigation areas will need to be shown on
final plats.
H. Bond Estimate Request for VSMP plans (WPO2013000032)
1. The bond estimate request will be processed when all VSMP plans are approved.
File: E14_ rp ,fsp,fpt,vsmp_GEB_Cascadia.doc