Loading...
HomeMy WebLinkAboutWPO201400063 Review Comments Bond Estimate 2014-09-12Project Name WPO file number: wpo201400 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not role drop inlet or grate manhole structure (per ft. nee) pipe, rap, Crop (15 to 48 ") 60.0 in d pipe, mp,cmp(15tu48 ") 30.0 in d pipe,mp.cmp(15tu48 ") 15.0 in d aggregate base or drainage stone 12.0 in d earthwork for trap/basin 0 ES-1,2 $450.00 height of dam at toe 260.0 ft height of fill at face 25.0 ft W length of dam 0 ft top width 0 ft (area above transition) 0 ft (total width of dam) 0 ft (height below transition 0 ft (area below transition) 0 ft (total FlII volume) 0 ft length of spillway 0 ft width of spillway structures for basin (area below transition) 0 at hear height 0 ft riser diameter 0 ft barrel length 0 ft barrel diameter tress shrubs seedlings underdmin (LF) bloflter soil mix (CV) trash hall and vortex devices maintenance access road (LF) rip-mp, placed depth 0 ft length width 0.0 (tons) rvey and layout (price per 0.1 mi.) acres 1 basins mobilization as -built drawings(mr facility) materials testing (par facility) compaction testing (W dam) manufactured facilities (attach manufacturers or contractor's pace as a base 0.0 ft 0 1 No. Unit Unit Cost Cost (installed) 0 ft 0 ES-1,0 $0.00 0 EC -1 $500.00 0 ES-1,1 5 as 0 EC -0 $17,500.00 0 ES-1,2 $450.00 0 EC -1 260.0 ft 60.0 Ill. 25.0 ft W 200.0 ft 0 ft cut at high side 0 ft $35.00 0 ft culalface 0 ft $3,675.00 0 ft length of cut 0 ft 0 ft width of cut 0 ft $2,000.00 0 sf (area below transition) 0 at $2,000.00 0 ft (total width of cut) 0 ft 0 ft (depth below transition 0 ft 0 sf (area above transition) 0 sf 0.0 Cy (total FlII volume) 0.0 cY 0 ft GOAL CV estimate) 0 cY 0 ft (spillway stone tons) 0 tons Oft 0 in (riser unit price) $000 0 ft base plate or ran 0 0 in (barrel unit price) $0.00 banal collars 0 baffle length 0 ft tress shrubs seedlings underdmin (LF) bloflter soil mix (CV) trash hall and vortex devices maintenance access road (LF) rip-mp, placed depth 0 ft length width 0.0 (tons) rvey and layout (price per 0.1 mi.) acres 1 basins mobilization as -built drawings(mr facility) materials testing (par facility) compaction testing (W dam) manufactured facilities (attach manufacturers or contractor's pace as a base 0.0 ft 0 1 No. Unit Unit Cost Cost (installed) 0 ft $13.00 $0.00 4 ea $500.00 $2,000.00 5 as $3,500.00 $17,500.00 32 ft $450.00 $14,400.00 260.0 ft $200.00 $52,000.00 200.0 ft $65.00 $13,000.00 205.0 ft $35.00 $7,175.00 105.0 ton $35.00 $3,675.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 4 as $150.00 $600.00 12 as $50.00 $600.00 0 as $5.00 $0.00 200 ft $5.00 $1,000.00 140 cy $38.00 $5,320.00 0 ft $1,500.00 $0.00 0 ft $50.00 $0.00 $60.00 $0.00 $1,000.00 $500.00 1 as $2,000.00 $2,000.00 1 as $2,000.00 $2,000.00 1 as $5,000.00 $5,000.00 SIMIll cost sum $127,770.00 proj mgmt $18,165.50 contingency $14,883.55 Total $161,630 9112/2014