HomeMy WebLinkAboutWPO201400063 Review Comments Bond Estimate 2014-09-12Project Name
WPO file number: wpo201400
Stormwater Management Plan Bond Estimate
Item Item
Number
permanent diversion or ditch
standard manhole frame top (not role
drop inlet or grate
manhole structure (per ft. nee)
pipe, rap, Crop (15 to 48 ")
60.0 in d
pipe, mp,cmp(15tu48 ")
30.0 in d
pipe,mp.cmp(15tu48 ")
15.0 in d
aggregate base or drainage stone
12.0 in d
earthwork for trap/basin
0 ES-1,2
$450.00
height of dam at toe
260.0 ft
height of fill at face
25.0 ft W
length of dam
0 ft
top width
0 ft
(area above transition)
0 ft
(total width of dam)
0 ft
(height below transition
0 ft
(area below transition)
0 ft
(total FlII volume)
0 ft
length of spillway
0 ft
width of spillway
structures for basin
(area below transition)
0 at
hear height
0 ft
riser diameter
0 ft
barrel length
0 ft
barrel diameter
tress
shrubs
seedlings
underdmin (LF)
bloflter soil mix (CV)
trash hall and vortex devices
maintenance access road (LF)
rip-mp, placed depth 0 ft length
width 0.0 (tons)
rvey and layout (price per 0.1 mi.) acres 1 basins
mobilization
as -built drawings(mr facility)
materials testing (par facility)
compaction testing (W dam)
manufactured facilities (attach manufacturers or contractor's pace as a base
0.0 ft
0
1
No. Unit Unit Cost Cost
(installed)
0 ft
0 ES-1,0
$0.00
0 EC -1
$500.00
0 ES-1,1
5 as
0 EC -0
$17,500.00
0 ES-1,2
$450.00
0 EC -1
260.0 ft
60.0 Ill.
25.0 ft W
200.0 ft
0 ft
cut at high side
0 ft
$35.00
0 ft
culalface
0 ft
$3,675.00
0 ft
length of cut
0 ft
0 ft
width of cut
0 ft
$2,000.00
0 sf
(area below transition)
0 at
$2,000.00
0 ft
(total width of cut)
0 ft
0 ft
(depth below transition
0 ft
0 sf
(area above transition)
0 sf
0.0 Cy
(total FlII volume)
0.0 cY
0 ft
GOAL CV estimate)
0 cY
0 ft
(spillway stone tons)
0 tons
Oft
0 in
(riser unit price)
$000
0 ft
base plate or ran
0
0 in
(barrel unit price)
$0.00
banal collars
0
baffle length
0 ft
tress
shrubs
seedlings
underdmin (LF)
bloflter soil mix (CV)
trash hall and vortex devices
maintenance access road (LF)
rip-mp, placed depth 0 ft length
width 0.0 (tons)
rvey and layout (price per 0.1 mi.) acres 1 basins
mobilization
as -built drawings(mr facility)
materials testing (par facility)
compaction testing (W dam)
manufactured facilities (attach manufacturers or contractor's pace as a base
0.0 ft
0
1
No. Unit Unit Cost Cost
(installed)
0 ft
$13.00
$0.00
4 ea
$500.00
$2,000.00
5 as
$3,500.00
$17,500.00
32 ft
$450.00
$14,400.00
260.0 ft
$200.00
$52,000.00
200.0 ft
$65.00
$13,000.00
205.0 ft
$35.00
$7,175.00
105.0 ton
$35.00
$3,675.00
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
4 as
$150.00
$600.00
12 as
$50.00
$600.00
0 as
$5.00
$0.00
200 ft
$5.00
$1,000.00
140 cy
$38.00
$5,320.00
0 ft
$1,500.00
$0.00
0 ft
$50.00
$0.00
$60.00
$0.00
$1,000.00
$500.00
1 as
$2,000.00
$2,000.00
1 as
$2,000.00
$2,000.00
1 as
$5,000.00
$5,000.00
SIMIll
cost sum $127,770.00
proj mgmt $18,165.50
contingency $14,883.55
Total $161,630
9112/2014