Loading...
HomeMy WebLinkAboutARB201400120 Review Comments Miscellaneous Submittal 2014-09-29�'IRGINLP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 September 29, 2014 Doug Stemler Hightech Signs 2165 Seminole Trail Charlottesville, VA 22901 RE: ARB- 2014 -120: Red Robin Sign Dear Mr. Stemler, I have reviewed the above -noted sign application. The following revisions are requested to make the proposal consistent with the Entrance Corridor Sign Guidelines. 1. The proposed Red Robin sign meets the definition of a roof sign because the structure it is attached to extends above the top of the wall of the structure. Roof signs are not permitted per Section 4.15.7 (c) 7 of the zoning ordinance. Revise the sign location so that it does not meet the definition of a roof sign. 2. Regarding the Red Robin sign, revise the drawing to indicate the Pantone number for the yellow return and to indicate the trim cap /return color (with Pantone number). 3. Regarding the GOURMET BURGERS sign, revise the drawing to clearly indicate the trim cap /return color (with Pantone number). 4. Regarding the AND BREWS sign, revise the drawing to clearly indicate the Pantone number for the yellow face and to indicate the trim cap /return color (with Pantone number). 5. Revise all sign drawings to show the limits (top, bottom and sides) of the sign band where each sign is located. Include the overall dimensions, width and height, of each sign band. 6. Revise all sign drawings, where LED is proposed, to include the following note regarding the limitation on LED intensity: "The level of illumination provided by the LED lights will not exceed the illumination produced by a single stroke of 30 milliamp (ma) neon." Please respond by email within 15 days of the date of this letter indicating whether you will or will not proceed with these revisions. Your decision to make the revisions will suspend the 60 -day review period associated with your original submittal. If you choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the application without further revisions. If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your revisions and completing this review with an approval letter. Sincerely, Brent Nelson Planner cc: ARB File