Loading...
HomeMy WebLinkAboutZMA200900001 Special Exception 2012-08-09WILLIAMS MULLEN Direct Dial: 434.951.5709 vlorig0a williamsmullen.com February 16, 2010 VIA HAND DELIVERY Claudette Grant Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 RE: ZMA 2009-01 Fifth Street / Avon Center Critical Slopes Waiver Request Dear Claudette: New Era Properties, LLC is submitting this request for a waiver of Section 4.2 of the zoning ordinance to allow disturbance of a critical slopes to develop the project known as "Fifth Street /Avon Center" consistent with the approved application plan per ZMA 2006-00009, and consistent with a proposed amendment to the approved application plan that is being reviewed as ZMA 2009-001. The subject parcels are identified on the County tax maps as parcels 76M1 -2A; 76M1 -2B; 76M1 -4A; and 77M1 -I IE (collectively, the "Property"). Overview: The project consists of a shopping center with associated site and infrastructure improvements, including Bent Creek Parkway. Generally, these improvements consist of access roads, travel ways, surface parking, utilities and Storm Water Management (SWM)Best Management Practice (BMP) facilities. The total project area is 89.6± acres, with approximately 55.0 acres of disturbance, and of the total project area, there are 21.8 acres of critical slopes. - The critical slopes to be disturbed primarily lay within proposedparking areas, travel ways and small portions of retail buildings. The layout was prepared with considerable effort to preserve existing floodplain limits, wetlands, and natural resource areas. In doing so, the site will be elevated on the northeast side, where the creation of man-made critical slopes are located. Attachment J A Professional Corporation NORTH CAROLINA • VIRGINIA • WASHINGTON, D.C. • LONDON 321 East Main St., Suite 400 Charlottesville, VA 22902-3200 Tel: 434.951.5700 Fax: 804.783.6507 or 434.817.0977 www.williamsmullen.com WILLIAMS MULLEN February 16, 2010 Page 2 Please refer to the following table for a breakdown of the critical slopes areas relative to this site: Critical Slopes Total Area of Critical Slopes 21.80 acres Existing Natural 10.66 acres (49%) Existing Man -Made 11.14 acres (51 %) Total Area of Disturbed Critical Slopes 12.01 acres Natural Area 2.34 acres (19%) Man -Made Area 9.76 acres (81 %) TECHNICAL PERFORMANCE STANDARDS: The applicant will address the five health, safety and welfare provisions of section 4.2 of the Zoning Ordinance (also known as the "Technical Performance Standards") below: 1. Rapid and/or large scale movement of soil and rock: Constriction of the site will require on-site earthwork moving operations, but will be phased. The areas of disturbance will be stabilized with erosion control measures that will be designed with the final engineering construction documents. The erosion control plan will consist of at least two (2) phases. The stabilization measures may include: • Silt fence • Super silt fence • Sediment traps Sediment basins • Diversion dikes Right-of-way diversion • Stabilization mats • Inlet protection Outlet protection Temporary seeding • Permanent seeding With these stabilization measures in place, there will not be a risk of rapid or large- scale movement of soil and rock. Attachment J WILLIAMS MULLEN February 16, 2010 Page 3 2. Excessive stormwater run-off The increase in runoff generated from the improvements will ultimately be controlled and detained by proposed SWM/BMP facilities. These facilities will detain the project site runoff and release it at or below the pre -developed runoff rate, such that excessive stormwater run-off will not occur. Erosion and sediment transport will be minimized or prevented as discussed in the previous item. 3. Siltation of natural and man-made bodies of water Currently onsite there is one man-made pond facility and Moore's Creek meanders along the western and northern boundary of the. site. The existing pond facility will be removed with the proposed site improvements. Several other facilities will be constructed on-site which will provide water quality, stabilization and detention measures that will prevent the discharge of silt into the nearby creek. 4. Loss of aesthetic resource The areas of critical slopes being disturbed on this site are not featured on the Open Space Plan maps, and over 80% of the slopes being disturbed are man-made. Although existing vegetation and trees will be removed to accommodate the project, the site plan construction documents will conform to landscaping and preservation requirements set forth on the approved Application Plan. This includes interior parking, landscaping, perimeter buffers and screening, road frontage setbacks, and open space areas within the site that provide landscaping opportunities. Additionally, as shown on the Application Plan, the project will provide for parks, trails, conservation areas and landscape enhancements areas within the Virginia Department of Transportation (VDOT) right-of-way. Therefore the overall end result of this project will not create a loss of aesthetic resources. Rather, it creates an opportunity to create a much more aesthetically pleasing community attraction. 5. Greater travel distance of septic effluent No septic systems are being proposed as part of the project, thus this provision is.not applicable. ANALYSIS OF SECTION 4.2.5(a)(3) CRITERIA: Section 4.2.5(a)(3) allows the Planning Commission to waive the restrictions against disturbing critical slopes upon a finding that: Attachment J WILLIAMS MULLEN February 16, 2010 Page 4 • the waiver would not be detrimental to the public health, safety or welfare; and Granting the waiver would not be detrimental to the public health, safety or welfare, for the project will ensure that none of the "health, safety and welfare" factors discussed above will be compromised. In other words, the applicant can reasonable design the project using engineering measures and techniques to protect against the adverse impacts of disturbing the slopes. • the waiver would not be detrimental to the orderly development of the area; and The Planning Commission, Board of Supervisors and Community Development staff spent many hours reviewing the proposed project, proffers and Application Plan, and by approving ZMA 06-09, determined that the project was appropriate for this area and in conformance with the Comprehensive Plan. Thus, granting the waiver would not be detrimental to the orderly development of the area since it is consistent with the Comprehensive Plan. i • the waiver would not be detrimental to adjacent properties; and Granting the waiver would not be detrimental to adjacent properties because the project will utilize measures to ensure that adverse impacts associated with disturbing the critical slopes do not occur. Concerns such as siltation of Moore's Creek, excessive stormwater runoff will not occur, as described above. In fact, by approving the waiver and allowing the project to move forward, the applicant will be able to carry out many measures that will actually enhance adjacent properties. 0 the waiver would not be contrary to sound engineering practices; The waiver request is based on sound engineering practices. AND at least one of the following: 1. A strict application of these provisions would not forward the purposes of the Zoning Ordinance or otherwise serve the public health, safety or welfare; OR The combination of the proposed engineering practices, the constraints and requirements of the approved Application Plan, the proffers, and the site plan ordinance requirements will ensure the protection of the public health, safety and welfare, such that strict application of the section 4.2 provisions would not forward the purposes of the Zoning Ordinance or otherwise serve the public health, safety or welfare. Attachment J 0 WILLIAMS MULLEN February 16, 2010 Page 5 2. Alternatives proposed by the developer would satisfy the intent and purposes of Section 4.2 at least to an equivalent degree; OR The engineering alternatives proposed by the applicant, as discussed in more detail above, will satisfy the intent and purposes of Section 4.2 at least to an equivalent degree, in that the adverse impacts often associated with the disturbance of critical slopes are not expected to occur. Furthennore, several elements of the project will actually further the intent and purposes of the ordinance even further by contributing toward the improvement in the health of Moore's Creek, such as the proposed improvements to the former landfill property and the addition of the proposed BMP facility adjacent to Interstate 64. 3. Due to its unusual size, topography, shape of the property, location of the property or other unusual conditions, excluding the proprietary interest of the developer, the requirements of section 4.2 would.effectively prohibit or unreasonably restrict the use of the property or would result in significant degradation of the site or adjacent properties; OR . Due to the unusual shape of the property, topography and location, the strict adherence to Section 4.2 would effectively restrict the use of the property. The site is bound by natural resource areas including wetlands, floodplain and Moore's Creek. Careful planning, research and significant effort has been put forth with the current location of travel ways, surface parking, buildings and needed infrastructure to adequately serve the site. As a result of the planning and research efforts, impacts to the natural resources such as Moore's Creek will be prevented or significantly minimized under accepted County and State regulations. It provides for appropriate balance between natural resource preservation and use of the property that is located within the County's designated development area. The intention and theme with this project is to create a "life style" center that will be a major attraction to the residents within the County as well as generating vital tax revenue for the government. 4. Granting such modification or waiver would serve a public purpose of greater import than would be served by strict application of section 4.2. Granting the waiver would enable the project to move forward, which enables the applicant to address a number of problems that already exist. For instance, the proffers set forth a detailed plan for addressing the former landfill property, which will dramatically improve the health of Moore's Creek. In addition, the revised proffers will propose a SWM/BMP facility to capture drainage from an off-site area that is currently flowing untreated into Moore's Creek. This proposed BMP facility will therefore also contribute to the health of the Creek. Attachment J WILLIAMS MULLEN February 16, 2010 Page 6 In addition, granting the waiver will facilitate the reasonable and orderly development of property within the designated development area that carefully balances the protection and enhancement of existing natural resources. Given that 80% of the critical slopes to be disturbed are man-made, and the proposed engineering measures to be utilized will avoid any adverse impacts, granting the waiver would serve a public purpose of greater import than would be served by strict application of Section 4.2. Conclusion: Therefore, the proposed waiver effectively addresses the Technical Performance Standards, and satisfies all of the criteria of Section 4.2.5(a)(3). Should you require any other information to review this waiver request, please contact me at 951-5709. Sincerely, VA'�� WJ-L Valerie W. Long Enclosures cc: Alan Taylor, River Bend Management, Inc. 6884443 2.DOC Attachment J SPECIAL EXCEPTION TO DISTURB CRITICAL SLOPES The applicant has submitted a request and justification for a special exception to disturb critical slopes. (See Attachment J) The attached critical slopes waiver request was based on a plan dated December 17, 2009. The revised plan, dated June 6, 2012 is significantly different than the plan submitted with the critical slopes waiver request and dated December 17, 2009. Based on the plan dated June 6, 2012 staff does not have enough information to analyze this request to address the provisions of the Ordinance. Engineering staff is deferring review of the special exception to disturb critical slopes to the site plan process when more detailed information is submitted regarding the proposed development. Section 4.2.3.2 of the Zoning Ordinance restricts earth -disturbing activity on critical slopes, while Section 4.2.5 (a) establishes the criteria by which a request to disturb critical slopes is evaluated. Under Section 31.8 (b), the Board must consider the factors, standards, criteria, and findings delineated in Section 4.2.5 (a), but it is not required to make specific finds in support of its decision. The Application Plan shows so little detail, there is not enough information to adequately process this waiver request Section 4.2.5(a) Review of the request by Engineering staff: Staff does not have enough information to adequately process this waiver request. Description of critical slope area and proposed disturbance: Areas Acres Total site area Area of critical slopes man-made & natural Total critical slopes area Man-made = Natural = %of development % of development % of development Total critical slopes disturbed % of critical slopes Exemptions for driveways, roads and utilities without reasonable alternative locations: Description of critical slope area and proposed disturbance: Compliance with Zoning Ordinance 18-4.2: "movement of soil and rock" "excessive stormwater runoff' "siltation" "loss of aesthetic resource" "septic effluent" Attachment I Review of the request by Planning staff: There is not enough information to adequately process this waiver request. Summary of review of modification of Section 4.2: Section 4.2.5 establishes the review process and criteria for granting a waiver of Section 4.2.3. The preceding comments by staff address the provisions of Section 4.2.5(a). Staff has included the provisions of Section 4.2.5(a)(3) here, along with staff comment on the various provisions. Under 31.8, the Board may modify or waive any requirement of section 4.2 based on these provisions, however, no specific finding is required in support of the Board's decision on the special exception. A. Strict application of the requirements of section 4.2 would not forward the purposes of this chapter or otherwise serve the public health, safety or welfare; B. Alternatives proposed by the developer or subdivider would satisfy the intent and purposes of section 4.2 to at least an equivalent degree; C. Due to the property's unusual size, topography, shape, location or other unusual conditions, excluding the proprietary interest of the developer or subdivider, prohibiting the disturbance of critical slopes would effectively prohibit or unreasonably restrict the use of the property or would result in significant degradation of the property or adjacent properties, or D. Granting the modification or waiver would serve a public purpose of greater import than would be served by strict application of the regulations sought to be modified or waived. SUMMARY AND RECOMMENDATION: RECOMMENDATION OF SPECIAL EXCEPTION FOR CRITICAL SLOPES DISTURBANCE: Staff recommends deferral of review of the special exception to disturb critical slopes for the site plan process when more detailed information is submitted regarding the proposed development. Attachment I