HomeMy WebLinkAboutSP201200009 Legacy Document 2012-09-24�� pF AL8
��IRGIl`IZP
COUNTY OF ALBLMARLF
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832
September 14, 2012
Paul Huddleston
1 Boars Head Pointe, Suite 123
Charlottesville, Va. 22903
RE: SP201200009 Southwood Boys & Girls Club Expansion
TAX MAP /PARCEL: 090Al 0000001 DO
Dear Mr. Huddleston:
Fax (434) 972 -4126
On September 5, 2012, the Albemarle County Board of Supervisors took action on SP
#201200009 to allow the expansion of the existing Community Center on approximately 1 acre
on the above noted Tax Map Parcel number in the Scottsville District. This special use permit
was approved based on the following conditions:
1. Development shall be in general accord with the concept plan titled Southwood Boys
and Girls- Club Expansion, dated April 13, 2012 (hereafter "Concept Plan "), as
determined by the Director of Planning and the Zoning Administrator. To be in general
accord with the Concept Plan, the proposed building and existing building renovation -
and use shall reflect the following major elements within the site essential to the design
of the site, as shown on the Concept Plan:
• Location of buildings, uses, and structures, inclusive of the minimum setback for
the new structure from Bitternut Lane must be fifteen (15) feet;
• Location of parking areas; and
• Location of outdoor play area
Minor modifications to the plan which do not conflict with the elements above may be
made to ensure compliance with the Zoning Ordinance; and
2. The parking study is based on a maximum of one hundred twenty (120) children. There
shall be no more than one hundred twenty (120) children at any one time served at this
location .of the Boys and Girls Club.
Please be advised that although the Albemarle County Board of Supervisors took action
on the project noted above, no uses on the property as approved above may lawfully
begin until all applicable approvals have been received and conditions have been met.
This includes:
• compliance with conditions of the SPECIAL USE PERMIT;
• approval of and compliance with a SITE PLAN amendment; and
• approval of a ZONING COMPLIANCE CLEARANCE.
In the event that the use, structure or activity for which this special use permit is issued is not
commenced within twenty -four (24) months from the date of Board approval, it shall be deemed
abandoned and the permit terminated. The term "commenced" means "construction of any
structure necessary to the use of the permit."
If you have questions or comments regarding the above -noted action, please do not hesitate to
contact Rebecca Ragsdale at 296 -5832.
Sincerely,
David Benish
Chief of Planning Services
Email CC: Rebecca Ragsdale
File