HomeMy WebLinkAboutCLE201200263 Certified Engineer's Report 2013-01-07SIEMENS EnerM
January 7, 2013 Certified Mail /Return Receipt Requested
Ms. Rebecca Ragsdale
Senior Planner
Community Development Department
Division of Zoning and Current Development
401 McIntire Road
Charlottesville, VA 22902
Subject: Certified Engineer's Report for the Zoning Clearance Application
Siemens Energy, Inc. Ceramic Parts Manufacturing Facility
1641 Edlich Road, Charlottesville, VA 22911
Dear Ms. Ragsdale:
Siemens Energy, Inc. ( "SEI ") is completing initial construction activities and moving
towards start of operations for its ceramic parts manufacturing facility located at
1641 Edlich Road, Charlottesville, VA. In response to your December 19, 2012
email, please find attached the Certified Engineer's Report for our zoning
clearance application.
The following materials are enclosed:
1. Certified Engineer's Report Form (1 page)
2. Certified Engineer's Report (37 Pages)
If you have any questions or concerns regarding the enclosed materials, please
contact me at (434) 244 -4652.
Sincerely,
Siemens Energy, Inc.
Philip Hatherley
Plant Manager
Enclosures
Cc: Tim O'Loughlin, SEI Charlottesville
David Ocamb, SEI Orlando
Siemens Energy, Inc. 1641 Edlich Drive Phone +1 434 326 -0200
Charlottesville, VA 22911 Fax +1 434202-5231
USA _musa.siemens.com
t'IRGII�ZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
MEMORANDUM
TO: Zoning Clearance or Home Occupation Applicant
FROM: Zoning Division
RE: Request for Approval of Letter of Performance Standards or
Certified Engineer's Report
Proposed Business /Use:
Address:
Re CLE (Zoning Clearance Number):
HO (Home Occupation Number):
Contact Person:
Phone Number:
Fax Number:
Date Faxed to Applicant:
Please return this form along with all required documentation to the Zoning Division upon
completion.
Thank you.
To be completed by staff:
Approved:
Comments:
CER Packet Revised 2/11/09
Certified Engineer's Report
Zoning Clearance Application
C L E 2012 -263
Siemens Energy Inc.
1641 Ed I ich Road
Charlottesville, VA 22911
Prepared for:
County of Albemarle, Virginia
Community Development Department
Division of Zoning and Current
Development
401 McIntire Road
Charlottesville, VA 22902
January 7, 2013
Table of Contents
Professional Engineer Certification...,... ............................................... ...............................
ii
FacilityLocation ................................................................................... ..............................1
Natureof Operation .............................................................................. ..............................1
Performance Standards Review ........................................................... ..............................1
Noise(4.14.1) .. ................................................................................. ..............................1
Vibration(4.14.2) .............................................................................. ..............................1
Glareand Heat (4.14.3) .................................................................... ..............................1
Electrical Interference ( 4. 14. 4) .......................................................... ..............................2
Certified Engineers Report ( 4. 14. 5) ...................................................... ..............................2
Emissions and Discharges ( 4. 14. 5( a)( 2)) .......................................... ..............................2
Control of Emissions and Discharges ( 4. 14. 5( a)( 3)) .......................... ..............................2
Other Information — Air Emissions (4.14.5(a)(4)(a)) .......................... ..............................3
Other Information — Water Discharges ( 4. 14. 5( a)( 4)( b)) .................... ..............................3
Other Information — Radioactive Materials (4.14.5(a)(4)(c)) .............. ..............................3
Other Information — Flammable /Hazardous /Explosive Materials (4.14.5(a)(4)(d)) ...........
3
Other Information — Disposal of Waste and Spill Containment ( 4.14.5(a)(4)(e)) ..............3
Appendix A - Air Quality Permit ....................................................... ...............................
A -1
Appendix B - Wastewater Permit ..................................................... ...............................
B -1
Appendix C - Stormwater No Exposure Certificate .........................................................
C -1
Appendix D - X -ray Unit Registration ............................................... ...............................
D -1
Professional Engineer Certification
I hereby certify that I am familiar with the Siemens Energy, Inc. manufacturing
facility at 1641 Edlich Road, Charlottesville, VA and I have reviewed this report and
I am a duly Licensed Professional Engineer under the laws of the Commonwealth
of Virginia.
Name Sam,Cack(In�m *'����n
Signature ��
Date
�.�ucl N1.
djO
annack, Ir.
c. No . 3771 �� af�l�AL ��G
Type 2 Certified Engineer's Report — Letter of
Performance Standards
Facility Location
Name: Siemens Energy, Inc., Charlottesville Facility
Address: 1651 Eldrich Road, Charlottesville, VA 22911
Nature of Operation
Siemens Energy Inc. ( "SEI ") operates a light manufacturing facility producing ceramic molds used
in the fabrication casting of air foil turbine blades. Manufacturing activities include the production of
aluminum machining, sub -tools production, molds production, curing, sintering, cleaning and
finishing of ceramic parts and wax - coated ceramic parts. Raw materials are stored indoors at the
location.
SEI leased the pre- existing plant building to conduct the ceramic parts manufacturing. SEI is
completing an initial configuration of the facility with the installation of manufacturing equipment,
testing devices, and other ancillary equipment common at manufacturing facilities.
Performance Standards Review
The following discussion reviews the provisions of sections 4.14.1 through 4.14.4 for the zoning
requirements in County of Albemarle County Code for Chapter 18, Section 4.
Noise (4.14.1)
The manufacturing will not create sound or impact noise levels in excess of the values specified in
Section 4.18. The facility is located in the Airport Industrial Park near the Charlottesville Albemarle
Airport. All manufacturing is conducted inside the plant building. The major source of noise is
transport truck traffic for plant materials delivery and shipping of the manufactured product.
Vibration (4.14.2)
The equipment operated at the facility will not produce any detectable continuous or
impulsive vibrations.
Glare and Heat (4.14.3)
Except for parking lot lighting and exterior building safety lights, all lighting and associated
glare is indoors. There will be no direct or sky reflected glare beyond the facility's property
line. The facility will employ process equipment that will be heated but the equipment will have
no discernable emissions of heat beyond the property lines. A limited number of chimney
stacks will be installed oriented away from abutting lots.
1
Electrical Interference (4.14.4)
The manufacturing operation does not involve any equipment that would generate electrical
disturbances and adversely affect any machinery or equipment on other lots nor will the
manufacturing operation affect the navigation or control of aircraft.
Certified Engineers Report (4.14.5)
The following addresses the information required to comply with the Certified Engineers Report
under section 4.14.5.
Emissions and Discharges (4.14.5(a)(2))
The expected emissions and discharges from the normal plant operation include the following:
1. Air emissions of volatile organic compounds ( "VOC "), hazardous air pollutants
( "HAP ") as defined under the U.S. 1990 Clean Air Act Amendments, and other
criteria air pollutants primarily generated from fuel combustion include oxides of
nitrogen (NOX), carbon monoxide (CO), sulfur dioxide (SO2), and particulate
matter (PM).
2. Process and sanitary wastewater
3. Stormwater
4. General plant trash and rubbish
5. Universal wastes (e.g., fluorescent bulbs)
6. Waste oils
7. Potentially other waste materials (e.g., unpunctured aerosol cans, waste solvent)
that could be classified as hazardous waste following definitions under the U.S.
Resource Conservation and Recovery Act ( "RCRA ").
Control of Emissions and Discharges (4.14.5(a)(3))
Through interactions with the Virginia Department of Environmental Quality, SEI applied
for and received a Stationary Source Permit to Construct and Operate for the regulated air
emissions generating equipment. A copy of the July 2012 air permit is included in
Appendix A. The VOC /HAP air emissions associated with the curing of the ceramic parts
will be controlled via thermal incineration. Beryllium emissions related to the etching unit
will be controlled with a caustic scrubber system. Effective pollution control of these
devices will be realized by installing, operating, and maintaining the equipment following
vendors' specifications and by utilizing systems to continuously monitor thermal oxidation
temperatures and the scrubber water circulation rate and pH.
Process wastewater will be collected and combined with the facility's sanitary water prior
to discharge to the local public owned treatment works ( "POTW "). Stormwater associated
with the exterior ground surface and the plant roof downspouts discharges to the
stormwater ditches along the east/southeast side of the property.
All waste materials will be managed following applicable county, state, and federal
requirements with disposal and recycling completed by licensed, third -party waste
management companies.
2
Other Information - Air Emissions (4.14.5(a)(4)(a))
Virginia DEQ approved SEI's application for the construction and operation of the air
emission sources associated with the ceramic parts manufacturing. The July 2012 permit
is included in Appendix A. The permit established emission limits, pollution control duties,
monitoring, recordkeeping, and other responsibilities.
The etching process is subject to the beryllium standard under the U.S. EPA's National
Emission Standard for Hazardous Air Pollutants ( "NESHAP ") regulations codified at 40
CFR 61.30. The regulation requires the beryllium air emissions to be collected and
controlled.
Other Information - Water Discharges (4.14.5(a)(4)(b))
Process wastewater will be generated by the etch room scrubber and a silica solution
discharge. The process wastewater is combined with the sanitary wastewater and
discharged to the Moores Creek public wastewater treatment plant operated by the
Rivanna Water and Sewer Authority. The Rivanna Authority with the Albemarle County
Service Authority jointly issued a discharge permit to SEI for the facility wastewater. The
permit limits the amount of contaminants in the facility effluent, requires routine monitoring
and reporting, and includes other standard provisions.
While the site like any location has the potential for stormwater discharge, there is no
routine industrial activities conducted outdoors that could result in the offsite discharge of
contaminants with the stormwater. As such, SEI applied for and received from VaDEQ a
certificate of no exposure as presented in Appendix C.
Other Information - Radioactive Materials (4.14.5(a)(4)(c))
A self- contained X -ray machine will be used at the facility for product inspections. There
are no radioactive emissions or discharges associated with the machine operation.
Appendix D contains the license issued by the Virginia Department of Health for this
device.
Other Information - Flammable /Hazardous /Explosive Materials
(4.14.5(a)(4)(d))
Two primary fuels will be used at the site including natural gas for the comfort heating
system and liquefied propane for the portable emergency backup power generator(as
needed). The design and operation of these systems will align with applicable regulations
and good engineering practices. Note that two underground storage tanks were
previously installed by the property owner /past operator. No direct, explosive type
materials will be used by SEI at the site. The mold production area will utilize a liquid
ketone hydrocarbon which is classified as a flammable material. Appropriate flammable
liquid management practices will be employed.
Other Information - Disposal of Waste and Spill Containment
(4.14.5(a)(4)(e))
All waste materials will be diposed of or recycled through appropriate, third party waste
disposal contractors. The site will have very limited volumes of oil materials on site and
will not trigger the EPA 40 CFR 112 oil spill regulations. However, spill kits and response
equipment will be maintained on site.
9
Appendix A - Air Quality Permit
r_di
a
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
STATIONARY SOURCE PERMIT TO CONSTRUCT AND OPERATE
In compliance with the Federal Clean Air Act and the Commonwealth of Virginia
Regulations for the Control and Abatement of Air Pollution,
Siemens Energy, Inc.
1641 Edlich Road
Charlottesville, Virginia 22911
Registration No.: 81681
Plant ID No.: 51- 003 -0131
is authorized to modify and operate
located at
a ceramic part manufacturing facility
1641 Edlich Road
Albemarle County, Virginia
in accordance with the Conditions of this permit.
Approved on
LAm
Director, Valley
Permit consists of 14 pages.
Permit Conditions 1 to 40.
Attachment A — Source Testing Report Format (one page)
Siemens Energy, Inc.
Registration Number: 81681
Page 2
INTRODUCTION
This permit approval is based on the permit application dated March 8, 2012, including amended
information dated April 16, 2012, April 25, 2012 and June 11, 2012, and supplemental
information dated April 26, 2012 and May 15, 2012. Any changes in the permit application
specifications or any existing facilities which alter the impact of the facility on air quality may
require a permit. Failure to obtain such a permit prior to construction may result in enforcement
action.
Words or terms used in this permit shall have meanings as provided in 9 VAC 5 -10 -10 of the
State Air Pollution Control Board Regulations for the Control and Abatement of Air Pollution.
The regulatory reference or authority for each condition is listed in parentheses Q after each
condition.
Annual requirements to fulfill legal obligations to maintain current stationary source emissions
data will necessitate a prompt response by the permittee to requests by the DEQ or the Board for
information to include, as appropriate: process and production data; changes in control
equipment; and operating schedules. Such requests for information from the DEQ will either be
in writing or by personal contact.
The availability of information submitted to the DEQ or the Board will be governed by
applicable provisions of the Freedom of Information Act, §§ 2.2 -3700 through 2.2 -3714 of the
Code of Virginia, § 10.1 -1314 (addressing information provided to the Board) of the Code of
Virginia, and 9 VAC 5- 170 -60 of the State Air Pollution Control Board Regulations.
Information provided to federal officials is subject to appropriate federal law and regulations
governing confidentiality of such information.
PROCESS REQUIREMENTS
1. Equipment List — Equipment to be constructed at this facility consists of:
Ref. No.
Equipment Description
Rated Capacity
Federal
Requirements
Aluminum Machining
P -01 -01
P -02 -01
P -03 -01
Print Lab Room
0.42 ft2 /hr
P -04 -01
P -05 -01
Mori Seiki DMU 85
M -01 -01
Monoblock
0.083 ft2 /hr
Vertical Mill Center
M -02 -01
Haas TR Series 5 -Axis
0.083 ft2 /hr
Vertical Mill Center
Siemens Energy, Inc.
Registration Number: 81681
Page 3
Etching
E -OI -OI
E -02 -01
E -03 -01
E -04 -01
E -OS -Oi
Etch Lab Room
0.42 ft2 /hr
NESHAP
40 CFR 61,
E -06 -01
Subpart C
E -07 -01
E -08 -01
Etch Lab Scrubber
110,000 SCF/hr
NESHAP
40 CFR 61,
Sub -tool Production
Subpart C
L -01 -01
CH Rood PR6
Dis eraser
0.17 gal/hr
Laco Tech 24 "diameter x 48"
L -02 -01
long
0.083 molds/hr
Vacuum Chamber
L -03 -01
VWR Edmunds
Vacuum Pum p
1,300 ft'/hr
L -06 -01
Sheldon FX -14
Curing Oven
0.083 molds/hr
Ceramic Molding Processes
C -01 -01
Binder Dispenser
C -02 -01
Powder Dispensing
C -08 -01
Mikro - Slurry Mixer
8.3 kg/hr
C -09 -01
Edwards 30,23 CFM Powder
Vent Hood
--
C-17-01
Product Handling and
Transfer Conveyor
_
-
C -18 -01
Automated Slurry Mix and
Dispense
2.7 molds/hr
C -13 -01
Automated Casting Station
0.67 molds/hr
C -13 -02
Automated Casting Station
0.67 molds/hr
C -13 -03
Automated Casting Station
0.67 molds/hr
C -13 -04
Automated Casting Station
0.67 molds/hr
__
Kiln Firing, Debind, and Sintering Processes
Sheldon Labs 1390
Preheat Oven
0.67 fixtures/hr
qC-04-02FMC
Sheldon Labs 1380
Curing Oven
0.17 molds/hr
Technologies J -50
Curing Oven
0.17 molds/hr
Siemens Energy, Inc.
Registration Number: 81681
Page 4
C -16 -01
Automation Vertical Pre -Heat
0.92 fixtures/hr
-
Oven
C -19 -01
Automation Vertical Pre -Heat
0.92 fixtures/hr
--
Oven
C -16 -02
Automation Vertical Pre -Heat
0.92 fixtures/hr
--
Oven
C -19 -02
Automation Vertical Curing
0.92 molds/hr
Oven
C -16 -03
Automation Vertical Pre-Heat
0.92 fixtures/hr
Oven
C -19 -03
Automation Vertical Curing
0.92 molds/hr
--
Oven
K -01 -01
Harrop Shuttle Kiln
1 kg/hr
K -01 -02
Harrop Shuttle Kiln
1 kg/hr
K-01-03
Harrop Shuttle Kiln
1 kg/hr
K -01 -04
Harrop Shuttle Kiln
1 kg/hr
K -01 -05
Harrop Shuttle Kiln
1 kg/hr
K-01-06
Harrop Shuttle Kiln
1 kg/hr
K -01 -07
Harrop Shuttle Kiln
1 kg/hr
K-01-08
Harrop Shuttle Kiln
1 kg/hr
K -09 -01
Harrop Thermal Incinerator
0.083 kg/hr
K-09-02
Harrop Thermal Incinerator
0.083 kg/hr
-
K-09-03
Harrop Thermal Incinerator
0.083 kg/hr
-
K-09-04
Harrop Thermal Incinerator
0.083 kg/hr
K-09-05
Harrop Thermal Incinerator
0.083 kg/hr
K-09-06
Harrop Incinerator
0.083 kg/hr
--
K -09 -07
Harrop Thermal Incinerator
0.083 kg/hr
K -09 -08
Harrop Thermal Incinerator
0.083 kg/hr
Cleaning and Finishing
F -01 -01
NASA Machine Tools
0.083 ft3/hr
CNC Machine 1
F -01 -02
NASA Machine Tools
0.083 ft'/hr
CNC Machine 2
NASA Machine Tools Model
F -01 -03
1620
0.042 ft'/hr
CNC Machine 3
Diversa -Tech DD 3x6
F -02 -01
Hand Station 1 Down Draft
0.021 kg/hr
Table
Diversa -Tech DD 3x6
F -02 -02
Hand Station 2 Down Draft
0.021 kg/hr
Table
Siemens Energy, Inc.
Registration Number: 81681
Page 5
Equipment exempt from permitting:
Ref. No.
Diversa -Tech DD 3x6
Rated Capacity
Exem tion Citation
F -02 -03
Hand Station 3 Down Draft
0.021 kg/hr
--
HW -04 -02
Table
1.084 MMBtu/hr
9 VAC 5 -80 -1320 B.l.d
Diversa -Tech DD 3x6
F -02 -04
Hand Station 4 Down Draft
0.021 kg/hr
-
Table
F -03 -01
Robotic Dressing
0.083 kg/hr
-
F-03-02
Robotic Dressing
0.083 kg/hr
-
Wax Addition and Wax Handling
W -01 -01
MPI 55 -05 -30 Smart A
3.3 kg/hr
-
Station 1
W -01 -02
MPI 55 -05 -30 Smart A
3.3 kg/hr
-
Station 2
5 -01 -01
Sheldon Labs FX14 -2
4.2 L/hr
--
Drying Oven
S -01 -02
Laco- Tech �s Vacuum
4.2 L/hr
T
Emergency Generator
W -04 -01
Propane -fired Emergency
250 kW/hr
--
Generator
Equipment exempt from permitting:
Ref. No.
Equipment Descri tion
Rated Capacity
Exem tion Citation
Weil- McClain Natural Gas
HW -04 -02
Boiler
1.084 MMBtu/hr
9 VAC 5 -80 -1320 B.l.d
Model P -878 -W
Specifications included in the permit under this Condition are for informational purposes
only and do not form enforceable terms or conditions of the permit.
(9 VAC 5 -80 -1180 D 3)
2. Emission Controls — Beryllium emissions from the Etch Lab Room equipment (Ref. E -01-
01 through E- 07 -01) shall be controlled by caustic scrubber (Ref. E- 08 -01). The caustic
scrubber shall be provided with adequate access for inspection and shall be in operation when
the Etch Lab Room equipment is operating.
(9 VAC 5 -80 -1180 and 9 VAC 5 -50 -260)
Emission Controls — VOC emissions from the kiln- firing Debind Process, shall be
controlled by a thermal incinerator (Ref. K -09 -01 through K- 09 -08). The thermal incinerators
shall be provided with adequate access for inspection and shall be in operation when the
associated kiln- firing debind process is operating. The thermal incinerator is not required to
operate during the kiln -firing Sintering Process.
(9 VAC 5 -80 -1180 and 9 VAC 5 -50 -260)
Siemens Energy, Inc.
Registration Number: 81681
Page 6
4. Control Efficiency — During the kiln debind process, the thermal incinerators (Ref. K -09 -01
through K- 09 -08) shall maintain a destruction efficiency for VOC of no less than 95.0
percent. In lieu of meeting the 95 percent destruction efficiency requirement, the permittee
shall maintain the maximum thermal incinerator exhaust outlet concentration to 20 ppmv
VOC to be demonstrated through an initial stack test, as required in Condition 26.
(9 VAC 5 -80 -1180 and 9 VAC 5 -60 -260)
5. Control Parameters - The thermal incinerators (Ref. K -09 -01 through K- 09 -08) shall
maintain a minimum internal chamber temperature, as determined during the initial stack test
during the Debind Process. The temperature at which the Debind Process is complete and
the Sintering Process has begun, during which no further VOC is being emitted from the kiln
firing, will be determined during the initial stack test, as required in Condition 26.
(9 VAC 5 -80 -1180 and 9 VAC 5 -60 -260)
6. Monitoring Devices — Each kiln (Ref. K -01 -01 through K- 01 -08) and thermal incinerator
(Ref. K -09 -01 through K- 09 -08) shall be equipped with devices to continuously measure the
internal chamber temperature. Each monitoring device shall be installed, maintained,
calibrated and operated in accordance with the manufacturer's written requirements or
recommendations. Each monitoring device shall be provided with adequate access for
inspection and shall be in operation when the oxidizer is operating.
(9 VAC 5 -80 -1180 and 9 VAC 5 -50 -260)
7. Monitoring Device Observation - The readings taken by the kiln and thermal incinerator
monitoring devices, used to continuously measure internal chamber temperatures shall be
logged using chart or electronic recorders. If any of the temperatures is observed to be
outside of the range determined during the initial stack test to achieve the required
destruction efficiency, timely corrective action shall be taken.
(9 VAC 5 -80 -1180 D)
8. Monitoring Devices — The permittee must install a non - resettable hour meter on the
emergency generator (Ref. W- 04 -01) prior to the startup of the generator. The hour meter
shall be provided with adequate access for inspection.
(9 VAC 5 -80 -1180 and 9 VAC 5 -50 -260)
9. Monitoring Devices — The caustic scrubber (Ref. E- 08 -01) shall be equipped with devices to
continuously measure the liquid scrubbing flow rate of the packed tower. Each monitoring
device shall be installed, maintained, calibrated and operated in accordance with the
manufacturer's written requirements or recommendations. Each monitoring device shall be
provided with adequate access for inspection and shall be in operation when the caustic
scrubber is operating.
(9 VAC 5 -80 -1180)
Siemens Energy, Inc.
Registration Number: 81681
10. Monitoring Devices — The caustic scrubber Page 7 shall be continuously measure the pH of the packed tower. Each mo monitoring device shall be installed,
maintained, calibrated and operated in accordance with the manufacturer sped with devices to
requirements or recommendations. Each monitoring device shall be Provided tith adequate
access for inspection and shall be in operation when the
(9 VAC 5 -80 -1180) caustic scrubber is operating.
11. Monitoring Device Observation — The monitoring devices used to continuously measure
the liquid scrubbing flow rate and pH of the caustic scrubber (Ref. E- 08 -01) shall be
observed (either manually or electronically) by the permittee with a frequency of not less
than once per week. The permittee shall keep a log (either manual or electronic) of the
observations.
(9 VAC 5 -50 -20 C and 9 VAC 5 -80 -1180)
12. VOC Work Practice Standards — At all times the disposal of volatile organic compounds
shall be accomplished by taking measures, to the extent practicable, consis
Pollution control practices for minimizing . Volatile organic compounds shall not
emissions tent with air
be intentionally spilled, discarded in sewers which are not connected to a treatment plant, or
stored in open containers, or handled in any other manner that would result in evaporation
beyond that consistent with air pollution practices for minimizing emissions.
(9 VAC 5 -50 -20 F and 9 VAC 5 -80 -1180)
13. Emission Controls — Particulate matter emissions (PM and PM -10) from the downdraft
tables (Ref. F -02 -01 through F- 02 -04) shall be controlled by fabric filter. The fabric filter
shall be provided with adequate access for inspection and shall be in operation when the
downdraft tables are operating.
(9 VAC 5 -80 -1180)
14. Emissions Testing - The permitted facility shall be constructed so as to allow for emissions
testing upon reasonable notice at any time, using appropriate methods. Sampling ports shall
access shall be provided. provided when requested at the appropriate
ac locations and safe sampling platforms and
(9 VAC 5 -50 -30 F and 9 VAC 5 -80 -1180)
OPERATINGIEMISSION LIMITATIONS
15. Fuel - The approved fuel for the emergency generator (Ref. W- 04 -01) is liquefied petroleum
gas (LPG). A change in the fuel may require a permit to modify and operate.
(9 VAC 5 -80 -1180 and 9 VAC 5 -50 -260)
16. Operating Hours - The emergency generator (Ref. W- 04 -01) shall not operate more than
500 hours per year, calculated monthly as the sum of each consecutive 12-month Operate period.
Compliance for the consecutive 12 -month period shall be demonstrated monthly by adding
the total for the most recently completed calendar month to the individual monthly totals for
the preceding 11 months.
(9 VAC 5 -80 -1180 and 9 VAC 5 -50 -260)
Siemens Energy, Inc.
Registration Number: 81681
Page 8
17. Emergency Generator Operation - The operation of the emergency generator (Ref. W -04-
01) is limited to emergency situations including the generation of power for critical networks
or equipment (including power supplied to portions of a facility) when electric power from
the local utility (or the normal power source, if the facility runs on its own power production)
is interrupted. The emergency generator (Ref. W- 04 -01) may also be operated for the
purpose of maintenance checks and readiness testing, provided that the tests are
recommended by federal, state, or local government, the manufacturer, the vendor, or the
insurance company associated with the engine.
(9 VAC 5 -80 -1180)
18. Throughput — The VOC emissions from the ceramic molding processes, as described in
Condition 1, shall not exceed 21.7 tons per year, calculated monthly as the sum of each
consecutive 12 -month period. Compliance for the consecutive 12 -month period shall be
demonstrated monthly by adding the total for the most recently completed calendar month to
the individual monthly totals for the preceding 11 months.
(9 VAC 5 -80 -1180 and 9 VAC 5 -50 -260)
19. Emission Limits - Total emissions from the thermal incinerators (Ref. K -09 -01 through K-
09 -08) shall not exceed the following limits:
Nitrogen Oxides (as NO2) 1.6 lbs /hr 6.9 tons /yr
Volatile Organic Compounds 0.4 lbs /hr 1.8 tons /yr
Annual emissions shall be calculated monthly as the sum of each consecutive 12 month
period. Compliance with these emission limits shall be determined as stated in Conditions 3,
4, 5, and 26.
(9 VAC 5 -80 -1180 and 9 VAC 5 -50 -260)
20. Emission Limits - Total emissions from the ceramic molding processes, as described in
Condition 1, shall not exceed the limits specified below:
Volatile Organic Compounds
5.0 lbs /hr 21.7 tons /yr
Annual emissions shall be calculated monthly as the sum of each consecutive 12 month
period. Compliance with these emission limits shall be determined as stated in Conditions 18
and 25.
(9 VAC 5 -80 -1180 and 9 VAC 5 -50 -260)
Siemens Energy, Inc.
Registration Number: 81681
Page 9
21. Emission Limits - Total emissions from the Etching processes, as described in Condition 1,
shall not exceed the limits specified below:
Beryllium
0.022 lbs / 24 -hr period
Compliance with these emission limits shall be determined as stated in Conditions 2 and 27.
(9 VAC 5 -80 -1180 and 9 VAC 5- 60 -60)
22. Visible Emission Limit - Visible emissions from each kiln (Ref. K -01 -01 through K- 01 -08)
and associated thermal incinerator (Ref. K -09 -01 through K- 09 -08) shall not exceed five
percent opacity as determined by the EPA Method 9 (reference 40 CFR 60, Appendix A).
This condition applies at all times except during startup, shutdown, and malfunction.
(9 VAC 5 -80 -1180, 9 VAC 5 -50 -80 and 9 VAC 5 -50 -260)
23. Visible Emission Limit - Visible emissions from the emergency generator (Ref. W- 04 -01)
shall not exceed 10 percent opacity as determined by the EPA Method 9 (reference 40 CFR
60, Appendix A). This condition applies at all times except during startup, shutdown, and
malfunction.
(9 VAC 5 -80 -1180 and 9 VAC 5- 50 -80)
24. Requirements by Reference - Except where this permit is more restrictive than the
applicable requirement, the NESHAP equipment, as described in Condition 1, shall be
operated in compliance with the requirements of 40 CFR 61, Subpart C.
(9 VAC 5 -80 -1180, 9 VAC 5 -60 -60 and 9 VAC 5- 60 -70)
RECORDS
25. On Site Records - The permittee shall maintain records of emission data and operating
parameters as necessary to demonstrate compliance with this permit. The content and format
of such records shall be arranged with the DEQ. These records shall include, but are not
limited to:
a. Annual hours of operation of the emergency generator (Ref. W- 04 -01), calculated
monthly as the sum of each consecutive 12 -month period.
b. Monthly and annual VOC emissions (in tons) from the following processes, as described
in Condition 1: Aluminum machining; Sub -tool Production; Ceramic Molding Processes;
and Kiln Firing, Debind, and Sintering Processes.
c. Monthly and annual beryllium emissions (in pounds) from the Etching processes, as
described in Condition 1.
d. Operation and control device monitoring records for the kilns (Ref. K -01 -01 through K-
01 -08) and thermal incinerators (Ref. K -09 -01 through K- 09 -08) as required in Condition
7, including corrective actions taken, if any.
Siemens Energy, Inc.
Registration Number: 81681
Page 10
e. Material Safety Data Sheets (MSDS), Certified Product Data Sheets (CPDS), or other
vendor information showing VOC content and hazardous air pollutant (MAP) content for
each machining coolant, wax coating, organic binder, volatile carrier, and sub -tool
material.
f. Operation and control device monitoring records for the caustic scrubber (Ref. E- 08 -01)
as required in Condition 11.
g. Results of all stack tests, visible emission evaluations and performance evaluations.
h. Records of Maintenance /Operating Procedures and training as required in Condition 34.
i. Records of bypass, malfunction, shutdown or failure of the facility or its associated air
pollution control equipment as required in Condition 35.
These records shall be available for inspection by the DEQ and shall be current for the most
recent five years.
(9 VAC 5 -80 -1180 and 9 VAC 5- 50 -50)
INITIAL COMPLIANCE DETERMINATION
26. Stack Testing - Initial performance tests shall be conducted for volatile organic compounds
(VOC) using EPA Reference Method 25 or 25A, unless an alternate method has been
approved by the DEQ, from each Thermal Incinerator (Ref. K -09 -01 through K- 09 -08), to
determine compliance with the emission limits and destruction efficiency requirements
contained in Conditions 4 and 19. The test on one incinerator will satisfy the initial testing
requirements for the other incinerators provided they are identical units. The results of the
test will be used to determine the minimum kiln temperature at which the Debind process is
complete and the minimum required destruction temperature for the incinerators. The tests
shall be performed within 60 days after achieving the maximum production rate at which the
facility will be operated but in no event later than 180 days after start-up of the permitted
facility. Tests shall be conducted and reported and data reduced as set forth in 9 VAC 5 -50-
30. The details of the tests are to be arranged with the DEQ. The permittee shall submit a
test protocol at least 30 days prior to testing. One copy of the test results shall be submitted to
the DEQ within 90 days after test completion and shall conform to the test report format
enclosed with this permit.
(9 VAC 5 -50 -30 and 9 VAC 5 -80 -1200)
27. Stack Testing - Initial performance tests shall be conducted for beryllium emissions from the
caustic scrubber exhaust, using either EPA Method 103 or 104 of appendix B of 40 CFR 61,
unless an alternate method has been approved by the DEQ, to determine compliance with the
emission limit in Condition 21. Samples shall betaken over such a period or periods as are
necessary to accurately determine the maximum emissions which will occur in any 24 -hour
period. Where emissions depend upon the relative frequency of operation of different types
of processes, operating hours, operating capacities, or other factors, the calculation of
maximum 24 -hour -period emissions will be based on that combination of factors which is
Siemens Energy, Inc.
Registration Number: 81681
Page 11
likely to occur during the subject period and which result in the maximum emissions. No
changes in the operation shall be made, which would potentially increase emissions above
that determined by the most recent source test, until a new emission level has been estimated
by calculation and the results reported. The initial stack testing shall be performed within 90
days of startup of the permitted beryllium emissions generating equipment. Tests shall be
conducted and reported and data reduced as set forth in 9 VAC 5- 50 -30. The details of the
tests are to be arranged with the DEQ. The permittee shall submit a test protocol at least 30
days prior to testing. All samples shall be analyzed and beryllium emissions shall be
determined within 30 days after the source test. One copy of the test results shall be
submitted to the DEQ by a registered letter dispatched before the close of the next business
day following such determination. The test results shall conform to the test report format
enclosed with this permit.
(9 VAC 5- 50 -30, 9 VAC 5 -60 -60 and 9 VAC 5 -80 -1200)
CONTINUING COMPLIANCE DETERMINATION
28. Stack Tests — Upon request by the DEQ, the permittee shall conduct additional performance
tests from any exhaust stack to demonstrate compliance with the limits contained in this
permit. The details of the tests shall be arranged with the DEQ.
(9 VAC 5 -50 -30 G)
29. Visible Emissions Evaluation - Upon request by the DEQ, the permittee shall conduct
visible emission evaluations from any exhaust stack to demonstrate compliance with the
visible emission limits contained in this permit. The details of the tests shall be arranged
with the DEQ.
(9 VAC 5 -50 -30 G)
NOTIFICATIONS
30. Initial Notifications - The permittee shall furnish written notification to the DEQ, of-
a. The actual date on which construction of the ceramic part manufacturing facility, as well
as major phases of construction of the facility commenced within 30 days after each such
date.
b. The actual start-up date of the ceramic part manufacturing facility, as well as major
phases of the facility within 15 days after each such date.
c. The actual start -up date of the beryllium emissions generating equipment within 15 days
after such date.
d. The anticipated date of the stack testing and visible emission evaluation postmarked at
least 30 days prior to such date.
Siemens Energy, Inc.
Registration Number: 81681
Page 12
Copies of the written notification referenced in items c through d above are to be sent to:
Associate Director
Office of Air Enforcement (3AP20)
U.S. Environmental Protection Agency
Region III
1650 Arch Street
Philadelphia, PA 19103 -2029
(9 VAC 5 -50 -50 and 9 VAC 5 -80 -1180)
31. Notification for Facility or Control Equipment Malfunction - The permittee shall furnish
notification to the DEQ, of malfunctions of the affected facility or related air pollution
control equipment that may cause excess emissions for more than one hour, by facsimile
transmission, telephone or telegraph. Such notification shall be made as soon as practicable
but no later than four daytime business hours after the malfunction is discovered. The
permittee shall provide a written statement giving all pertinent facts, including the estimated
duration of the breakdown, within two weeks of discovery of the malfunction. When the
condition causing the failure or malfunction has been corrected and the equipment is again in
operation, the permittee shall notify the DEQ.
(9 VAC 5 -20 -180 C and 9 VACS 5 -80 -1180)
GENERAL CONDITIONS
32. Permit Invalidation - The portions of this permit to construct and operate a ceramic part
manufacturing facility shall become invalid, unless an extension is granted by the DEQ, if:
a. A program of continuous installation or modification is not commenced before the latest
of the following:
i. 18 months from the date of this permit;
ii. Nine months from the date that the last permit or other authorization was issued from
any other governmental entity;
iii. Nine months from the date of the last resolution of any litigation concerning any such
permits or authorization; or
b. A program of installation or modification is discontinued for a period of 18 months or
more, or is not completed within a reasonable time, except for a DEQ approved period
between phases of a phased construction project.
(9 VAC 5 -80 -1210)
Siemens Energy, Inc.
Registration Number: 81681
Page 13
33. Right of Entry - The permittee shall allow authorized local, state, and federal
representatives, upon the presentation of credentials:
a. To enter upon the permittee's premises on which the facility is located or in which any
records are required to be kept under the terms and conditions of this permit;
b. To have access to and copy at reasonable times any records required to be kept under the
terms and conditions of this permit or the State Air Pollution Control Board Regulations;
c. To inspect at reasonable times any facility, equipment, or process subject to the terms and
conditions of this permit or the State Air Pollution Control Board Regulations; and
d. To sample or test at reasonable times.
For purposes of this condition, the time for inspection shall be deemed reasonable during
regular business hours or whenever the facility is in operation. Nothing contained herein
shall make an inspection time unreasonable during an emergency.
(9 VAC 5 -170 -130 and 9 VAC 5 -80 -1180)
34. Maintenance /Operating Procedures — At all times, including periods of startup, shutdown,
and malfunction, the permittee shall, to the extent practicable, maintain and operate the
affected source, including associated air pollution control equipment, in a manner consistent
with good air pollution control practices for minimizing emissions.
The permittee shall take the following measures in order to minimize the duration and
frequency of excess emissions, with respect to air pollution control equipment and process
equipment which affect such emissions:
a. Develop a maintenance schedule and maintain records of all scheduled and non-
scheduled maintenance.
b. Have available written operating procedures for equipment. These procedures shall be
based on the manufacturer's recommendations, at a minimum.
c. Train operators in the proper operation of all such equipment and familiarize the
operators with the written operating procedures, prior to their first operation of such
equipment. The permittee shall maintain records of the training provided including the
names of trainees, the date of training and the nature of the training.
(9 VAC 5 -50 -20 E and 9 VAC 5 -80 -1180 D)
35. Record of Malfunctions — The permittee shall maintain records of the occurrence and
duration of any bypass, malfunction, shutdown or failure of the facility or its associated air
pollution control equipment that results in excess emissions for more than one hour. Records
shall include the date, time, duration, description (emission unit, pollutant affected, cause),
Siemens Energy, Inc.
Registration Number: 81681
Page 14
corrective action, preventive measures taken and name of person generating the record.
(9 VAC 5 -20 -180 J and 9 VAC 5 -80 -1180 D)
36. Violation of Ambient Air Quality Standard - The permittee shall, upon request of the
DEQ, reduce the level of operation or shut down a facility, as necessary to avoid violating
any primary ambient air quality standard and shall not return to normal operation until such
time as the ambient air quality standard will not be violated.
(9 VAC 5 -20 -180 I and 9 VAC 5 -80 -1180)
37. Change of Ownership -In the case of a transfer of ownership of a stationary source, the new
owner shall abide by any current permit issued to the previous owner. The new owner shall
notify the DEQ, of the change of ownership within 30 days of the transfer.
(9 VAC 5 -80 -1240)
38. Permit Copy -The permittee shall keep a copy of this permit on the premises of the facility
to which it applies.
(9 VAC 5 -80 -1180)
STATE -ONLY ENFORCEABLE REQUIREMENTS
Conditions 39 and 40 are included in this permit to implement the requirements of 9 VAC 5 -50-
130 et seq. and are enforceable only by the Virginia Air Pollution Control Board. Neither their
inclusion in this permit nor any resulting public comment period make these terms federally
enforceable.
39. Emission Controls - Odorous emissions from the kilns during the debind process (Ref. K-
01-01 through K- 01 -08) shall be controlled by thermal incinerator (Ref. K -09 -01 through K-
09-08). The thermal incinerators shall be provided with adequate access for inspection and
shall be in operation when each associated kiln (Ref. K -01 -01 through K- 01 -08) is operating
in the debind process.
(9 VAC 5 -50 -140 and 9 VAC 5 -80 -1180)
40. Odor Control - The ceramic part manufacturing facility shall be operated in such a manner
as to cause no odorous emissions in excess of those resulting from using best available
control technology as reflected in any condition of this permit. If the release of odorous
emissions is due to failure to meet any conditions of this permit, the ceramic part
manufacturing facility shall automatically be considered to be in violation of 9 VAC 5
Chapter 50, Article 2, Standards of Performance for Odorous Emissions.
(9 VAC 5 -50 -140 and 9 VAC 5 -80 -1180)
SOURCE TESTING REPORT FORMAT
Report Cover
1. Plant name and location
2. Units tested at source (indicate Ref. No. used by source in permit or registration)
3. Test Dates.
4. Tester; name, address and report date
Certification
1. Signed by team leader /certified observer (include certification date)
2. Signed by responsible company official
3. *Signed by reviewer
Copy of approved test protocol
Summary
I. Reason for testing
2. Test dates
3. Identification of unit tested & the maximum rated capacity
4. *For each emission unit, a table showing:
a. Operating rate
b. Test Methods
c. Pollutants tested
d. Test results for each run and the run average
e. Pollutant standard or limit
5. Summarized process and control equipment data for each run and the average, as required by
the test protocol
6. A statement that test was conducted in accordance with the test protocol or identification &
discussion of deviations, including the likely impact on results
7. Any other important information
Source Operation
1. Description of process and control devices
2. Process and control equipment flow diagram
3. Sampling port location and dimensioned cross section Attached protocol includes: sketch of
stack (elevation view) showing sampling port locations, upstream and downstream flow
disturbances and their distances from ports; and a sketch of stack (plan view) showing
sampling ports, ducts entering the stack and stack diameter or dimensions
Test Results
1. Detailed test results for each run
2. *Sample calculations
3. *Description of collected samples, to include audits when applicable
Appendix
1. *Raw production data
2. *Raw field data
3. *Laboratory reports
4. *Chain of custody records for lab samples
5. *Calibration procedures and results
6. Project participants and titles
7. Observers' names (industry and agency)
8. Related correspondence
9. Standard procedures
Not applicable to visible emission evaluations
Appendix B - Wastewater Permit
r15i
INDUSTRIAL WASTE DISCHARGE PERMIT
FOR
SIEMENS ENERGY, INCORPORATED
1641 Edlich Drive
Charlottesville, Virginia 22911
Permit Number 025
Effective Date: November 1, 2012
Expiration Date: June 30, 2013
Issued jointly by the Albemarle County Service Authority and
The Rivanna Water and Sewer Authority
Facility Owner: Siemens Energy, Inc., 4400 Alafaya Trail, Orlando, FL 32826
Facility Representative: Mr. Phil Hatherley, Plant Manager, 1641 Edlich Dr., Charlottesville, VA
22911
Permit No. 025
INDUSTRIAL WASTEWATER
DISCHARGE PERMIT
In accordance with the provisions of the Rules and Regulations of the Albemarle County Service
Authority, Section 9, Use of Sanitary Sewers, Siemens Energy, Incorporated is authorized to
discharge from a facility located at 1641 Edlich Drivel in the County to the sewerage system owned
and operated by the Albemarle County Service Authority and the Rivanna Water and Sewer
Authority in accordance with the discharge limitations, monitoring requirements and other
conditions set forth in this permit.
This permit shall become effective upon execution and shall expire at midnight, June 30, 2013.
By authority of: Executive Director
Albemarle County Service Authority
Signed this j ST— day of N"Wl LVr 2012.
�r
'Connell
and: Executive Director
Rivanna Water and Sewer Authority
Signed this 2-6 day of OQ:�641- 2012.
*'IhP;Fre e ick, Jr.
Permit No. 025 Section A
Page 1 of 1
A. DISCHARGE LIMITATIONS AND MONITORING REQUIREMENTS
1. During the period beginning with the permit's effective date and lasting until the permit's
expiration date, the permittee is authorized to discharge as follows;
Discharge
Parameter
Cadmium, total
Chromium, total
Copper, total
Lead, total
Nickel, total
Silver, total
Zinc, total
Cyanide, total
otal oxr A
Organ��
Limitations (mg/1) Monitoring Requirements
DailM ax. Monthly Avg, Frequency Sample Type
0.05
2 /yr.
Grab
2.19 - --
2 1yr.
Grab
1.88 - --
2 /yr.
Grab
0.19 - --
2 /yr,
Grab
2.18 - --
2 /yr.
Grab
0.20 - --
2 /yr.
Grab
1.39 - --
2 /yr.
Grab
0.05 - --
2 /yr.
Grab
2.13 - --
2 /yr.
Grab
2. Samples collected in compliance with the above monitoring requirements are to be taken
from the sampling port at the downstream end of the pH adjustment tank and filters. Results
are to be reported for each period ending in June and December of each year in accordance
with the provisions of Section B. If, during either or both semi - annual reporting periods no
discharge of regulated wastewaters occurs, then sampling for that period(s) will not be
required.
3. Regardless of whether or not the Permittee discharges regulated wastewaters during any
given report period, the periodic monitoring report required in Part 2 above must include a
record of the measured or estimated average and maximum daily flow of the regulated
process wastestream and the total site discharge during the reporting period.
4. Parameters in the permittee's waste not specifically listed above shall not exceed the
limitations or characteristics of the applicable Sewer Use Ordinance.
Section B
Page 1 of 3
B. MONITORING AND REPORTING
1. Sampling and Analysis Methods
a) Required samples and measurements shall be representative of the volume and
nature of the monitored discharge.
b) Samples shall be deposited into containers properly prepared, of a material suitable
for the tests to be performed and that are appropriately preserved between the time
of collection and analysis in accordance with the provisions of 40 CFR Part 136.
C) Samples shall be collected and tested in accordance with the applicable procedures
identified in 40 CFR Part 136.
d) The sampling and analysis program to demonstrate compliance with the permit shall
conform to Section A of this permit.
2. Calibration and Maintenance
a) The permittee shall periodically calibrate and perform maintenance procedures on
all monitoring and analytical instrumentation at intervals that will insure accuracy of
measurements.
b) The permittee shall record the instrument, date, time and initials of person(s)
performing such calibration and maintenance.
3. Recording of Results
For each measurement or sample taken pursuant to the requirements of this permit,
the permittee shall record the following information:
a) The date, exact place, type (grab or composite), and time of sampling or
measurements;
b) The person(s) who performed the sampling or measurements;
C) The dates analyses were performed;
d) The person(s) who performed each analysis;
e) The analytical techniques or methods used; and
I) The results of such analyses and measurements.
Section B
Page 2 of 3
4. Records Retention
All records and information resulting from the monitoring activities required by this permit,
including all records of analyses performed and calibration and maintenance of
instrumentation and recordings from continuous monitoring instrumentation, shall be
retained for three (3) years. This period shall be extended automatically during the course
of any unresolved enforcement proceedings or litigation regarding the permitted discharge
or as requested by the Approving Authority.
5. Reporting Requirements
a) Routine Reports
1) The permittee shall submit to the Authority by the fifteenth (15th) of each
following month, a report containing the form provided in Attachment 1 of
this permit and all test results and other information specified in Section B.3.
collected from the sample point(s) specified in Section A.
2) Further, the permittee shall submit to the Authority the results of all self -
monitoring performed in accordance with Section A, including the results of
monitoring that is performed more frequently than required in Section A.
b) Non - Routine Reports
1) If, for any reason, the permittee does not comply with any discharge
limitation or other standard specified in this permit, the permittee shall
notify the Authority within 24 hours of becoming aware of the violation. A
repeat sample shall be collected and the results reported to the Authority
within 30 days.
2) The permittee shall further prepare and submit to the Authority within 5
days a written report containing the following information:
a) A description of the discharge and cause of noncompliance;
b) The period of noncompliance, including exact dates and times and/or
the anticipated time when the discharge will return to compliance;
and
C) Actions taken or to be taken to reduce, eliminate, and prevent
recurrence of the noncompliant discharge.
Section B
Page 3 of 3
All monitoring reports must contain the following certification statement and be
signed in accordance with the signatory requirements of 40 CFR 403.12(1):
"I certify under penalty of law that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure
that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those
persons directly responsible for gathering the information, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations."
Reports shall be submitted to:
Laboratory Director
Rivanna Water & Sewer Authority
695 Moores Creek Lane
Charlottesville, VA 22902
Section C
Page 1 of 4
C. GENERAL CONDITIONS
1. Duty to Comply
It is the permittee's responsibility to comply with all conditions of this permit and the
applicable Sewer Use Ordinance. Failure to do so may be grounds for administrative action
or more stringent enforcement proceedings including civil or criminal penalties and
injunctive relief.
Further, it is the permittee's responsibility to comply with all applicable Federal
pretreatment standards including those which may become effective during the term of this
permit.
2. Facility Operation
The permittee shall at all times maintain in good working order and operate as efficiently as
possible all pretreatment or control facilities or systems installed or used to achieve
compliance with the terms and conditions of this permit.
Any diversion or bypass of the above facilities is prohibited except where unavoidable to
prevent loss of life or severe property damage. The permittee shall immediately notify the
Authority Wastewater Manager at 977 -2970 ext. 112 of any such occurrence.
3. Removed Substances
Solids, sludges or other pollutants removed by the pretreatment or control of wastewaters
shall be disposed of in accordance with Section 405 of the Clean Water Act and Subtitles C
and D of the Resource Conservation and Recovery Act (RCRA).
4. Spills, Leaks and Slug Discharges
The permittee shall take all reasonable steps to prevent any slug discharges and to contain
and remove any accidental spill or leak which may be hazardous to the public sewerage
system or its employees. The permittee shall immediately upon such a discharge notify the
Authority Wastewater Manager 977 -2970 ext. 112. A complete written report of such
occurrence must be submitted to the Executive Director of the Authority within ten (10)
days of the event.
5. Duty o Mitigate
The permittee shall take all reasonable measures to minimize and correct the impact and
duration and severity of any spill or discharge that violates the provisions of this permit.
Section C
Page 2 of 4
6. Dilution Prohibited
The permittee shall not increase the use of potable or process water to dilute an effluent as a
substitute for adequate treatment to achieve compliance with the limitations contained in
this permit.
Right of Entry
The permittee shall allow properly identified Authority personnel access at all reasonable
times to perform inspection and sampling activities and to examine and copy records
required by this permit.
8. Non - Transferability
Industrial Waste Discharge Permits are issued to a specific user for a specific operation and
are not assignable to another user or location.
a) In the event of any change in ownership of facilities from which the discharge is
permitted, the permittee shall notify the succeeding owner of this permit by letter
with a copy forwarded to the Authority. The succeeding owner must apply for a
new permit within thirty (30) days of assuming ownership and comply with the
terms of this permit until a new permit is issued.
b) Any anticipated facility expansion, production increases, or process modifications
which will result in new, different or increased discharges of pollutants must be
reported to the Authority.
1) If such changes will not violate the discharge limitations specified in this
permit, the permit may be modified to specify and limit any pollutants not
previously limited.
2) If such changes violate the discharge limitations specified in this permit, this
permit will become void and a new permit application must be submitted.
9. Duty to Reapply
It is the permittee's responsibility to submit an application for a new permit at least 90 days
before the expiration date shown on this permit.
Section C
Page 3 of 4
10. Permit Modification, Suspension and Revocation
This permit may be modified, suspended or revoked in whole or in part during its term for
cause including, but not limited to the following:
a) Violation of any terms or conditions of this permit;
b) Obtaining this permit by misrepresentation or failure to disclose fully all relevant
facts;
c) A change in any condition that requires either a temporary or permanent reduction
or elimination of the permitted discharge; or
d) Failure to pay any and all costs as provided for in the applicable Sewer Use
Ordinance.
The permittee shall be informed of any proposed changes in the permit at least sixty (60)
days prior to the effective date of change. However, the Approving Authority is not
precluded from taking immediate action to temporarily modify a permit when there is
imminent risk of injury to the sewerage system or to the health and welfare of the public or
to the environment.
11. Severabilitv
The provisions of this permit are severable, and if any provision of this permit, or the
application of any provision of this permit to any circumstance is held invalid, the
application of such provision to other circumstances, and the remainder of this permit, shall
not be affected thereby.
12. Enforcement
If the Approving Authority determines that the conditions of this permit or any provisions
of the applicable Sewer Use Ordinance or State or Federal regulations have been violated or
is being violated, a Compliance Order shall be issued requiring the permittee to abate such
violation within thirty (30) days of the date of the order. Such order shall be sent to the
permittee at the address used for its utility bills by certified mail, return receipt requested.
In the event the permittee fails to comply with such order within the prescribed time period,
the Approving Authority shall suspend this permit and may terminate public water service
to the permittee's industrial facility.
Section C
Page 4 of 4
The Approving Authority may also initiate any appropriate action for permit violation as
allowed by the legal authority for this permit.
13. Appeals
The permittee has the right to appeal enforcement actions through the following appeals
procedure:
Notice to appeal shall be given in writing to the Executive Director of the Authority within
the time specified for compliance in the Compliance Order. Failure to file such notice
within such time limit shall be deemed a waiver of the right to appeal. Upon receipt of the
appeal request, the Executive Director shall appoint an Appeals Committee comprised of
one member each from the two organizations comprising the Approving Authority. The
Executive Director shall act as Committee Chairman. A hearing shall be held within thirty
(30) days of receipt of the appeal request. The hearing shall be held as an informal
consultation and conference at which the permittee, in person or by counsel, shall present
his argument, evidence, data and proof in connection with the issues submitted.
A representative from the Approving Authority will then present its factual basis for the
proposed enforcement action. The Appeals Committee shall not be bound by the usual
rules of evidence but may conduct the hearing in such a manner as in their judgment will
expeditiously and accurately determine the substantial rights of the permittee, and the
Approving Authority. The Appeals Committee shall make findings of fact and determine
the course of action to be followed by the Approving Authority in regard to the appeal.
Appendix C - Stormwater No Exposure Certificate
C -1
COMMONWEAL TH of VIR GINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
VALLEY REGIONAL OFFICE
Douglas w. Domenech 4411 Early Road, P.O. Box 3000, Harrisonburg, Virginia 22801 David K. Paylor
Secretary of Natural Resources (540) 574 -7800 Fax (540) 574 -7878 Director
www.deq.virginia.gov Amy Thatcher Owens
Regional Director
November 29, 2012
Mr. Timothy O'Loughlin
Operations Manager
Siemens Energy, Inc.
4400Alafaya Trail
Orlando, FL 32826
Re: No Exposure Certification — Siemens Energy, Inc.
Dear Mr. O'Loughlin:
The No Exposure Certification Form that you submitted for Siemens Energy, Inc. has
been reviewed and is acceptable.
We remind you that you are obligated to submit the No Exposure Certification Form to
the Department once every five years. If conditions change at the facility, and any industrial
materials or activities become exposed to storm water, you must obtain coverage under a VPDES
permit prior to any point source discharge of storm water from the facility.
If you have any questions, please feel free to contact me at (540) 574 -7877 or by email at
olive.critzer @deq.virginia.gov.
Sincerely,
a4�
cj� e �.
Olive B. Critzer
Water Permit Writer
cc: FileNet t.
Bill Maddox, Water Compliance Inspector
MEMORANDUM
DEPARTMENT OF ENVIRONMENTAL QUALITY
4411 Early Rd.
SUBJECT: Siemens Energy, Inc.
TO: Bill Maddox
r
FROM: Olive Critzer R2
DATE: November 28, 2012
Valley Regional Office
P.O. Box 3000 Harrisonburg, VA 22801
Attached for your review is a No Exposure Certification (NEC) received for the referenced facility.
Please provide any comments within the next S work days so I can process the approval or denial of this
NEC request.
If at any time you become aware of any specific and current reason to object to this NEC, please let me
7 nd it can be rescinded if the owner is unable to adequately address your concerns.
I have no comments at this time.
❑ I concur with the No Exposure. Certification.
❑ I do not concur with the No Exposure Certification. See comments below.
❑ I am currently working with the NEC applicant to get resolution to my concerns.
❑ I previously informed the NEC applicant of my concerns and they were not adequately
addressed.
❑ Other:
1
Signature ate
Appendix D - X -ray Unit Registration
D -1
Virginia Department of Health
Division of Radiological Health Radiation Safety DEPARTMENT
k + P. �. Box 2448 - Room 730 OF HEALTH
�(� ProlxlingY Richmond Vir inia 23218 ,___ Y _ 9 www.vdh.virginia.gov
Analytical X-ray Machine Registration
SIEMENS ENERGY, INC.
1641 EDLICH ROAD
CHARLOTTESVILLE, VA 22911
BRUKER D2PHASER 206137 MATERIALTESTING
According to our records, the Analytical X -ray machine(s) described above have been registered with this
office. If you should have any questions call the Radiological Health Program at (804) 864 -8150 or
(800) 468 -0138
MAUREEN E. DEMPSEY, M.D., FAAP. Stan Orchel, Jr. Assistant Director