Loading...
HomeMy WebLinkAboutSDP199300030 Application Minor Amendment 1993-05-03 • of_ai-e Countyof Albemarle Application for all modifications ��,,�®Fy ��Ki1Ulll*r Department of Planning and Community Development regarding existing °C�l :�r 401 McIntire Road SITE DEVELOPMENT PLANS Charlottesville,VA 22902-4596 804 296-5823 Rec'd by ❑ MAJOR AMENDMENT(Commission Review) Fee of$215 (12 copies required) MINOR AMENDMENT (alteration to parking, �3 /3 0"/), / circulation,building size,location) Fee of$75 plus 5 copies required / ❑ REINSTATE PLAN REJECTED AFTER SITE REVIEW Fee of$50 required REINSTATE PLAN DEFERRED BY APPLICANT: ❑ TO A SPECIFIC DATE Fee of$25 required ❑ INDEFINITELY Fee of$60 required ❑ RELIEF FROM CONDITIONS OF APPROVAL from Commission or landscape waiver by agent Fee of$140 ▪ EXTENSION OF APPROVAL prior to expiration of an approved plan Fee of$35 ❑ REHEARING of Site Development Plan by Commission or Board Fee of$150 ❑ APPEAL of Site Development Plan to Board Fee of$190 • TITLE OF PROJECT C utchf ield Corporation EXISTING FILE NUMBER ����' Tax Map/Parcel(s) 32 ( 17 B) Contact Person William G. Crutchfield, Jr. Daytime Phone 973-1811 Mailing Address 1 C'rutchf i el d Park Developer(If different from owner) Daytime Phone Mailing Address Surveyor/Architect/Land Planner Daytime Phone Mailing Address Owner's Name(As listed currently in Real Estate Department) Crutchfield Corporation Daytime Phone Mailing Address 1 Crutr-hf i el r1 Park , CharlotteSvi 11c , VA 22906 INTENDED USE OR JUSTIFICATION FOR REQUEST Add 30 additional parking spaces . S�l)ti AI./i�t{ COUNTY OF ALBEMARLE Department of Engineering 401 McIntire Road Charlottesville, Virginia 22902-4596 (804) 296-5861 June 29, 1993 RECEIVED Crutchfield Corporation JUN ,) 0 1993 1 Crutchfield Park Charlottesville, VA 22906 Planning Dept, Re: Crutchfield Corporation / Parking Addition Erosion Control Plan #1401 Gentlemen: The revised erosion control plan submitted on 06/29/93 is approved. Please be reminded that prior to an erosion control permit being issued, a preconstruction conference must be scheduled with the owner, contractor and the Albemarle County Engineering Department. If you have any questions, please do not hesitate to contact me. Sincerely, G�= Robert A. Shaw Erosion Control Officer RAS/ Copy: Rich Tarbell Jack Kelsey Reading File FAX (804) 972-4060