HomeMy WebLinkAboutWPO201100042 Inspection 2013-03-210
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
EROSION CONTROL RE- INSPECTION INVOICE
DATE: March 1, 2013
INVOICE TO: Crown Motorcar Company, LLC
c/o George Karolis
2905 Premiere Pkwy, Suite 300
Duluth, GA 30097
RE: Crown BMW Retail Parts & Service Building
W PO- 2011 -00042
Notice to Comply dated 2/11/2013
DATE OF RE- INSPECTION: $250.00
RE- INSPECTION FEE: $250.00
By April 1, 2013 you should forward the re- inspection fee of $250.00 to continue your project.
To pay the re- inspection fee, please send a check payable to the County of Albemarle to my
attention along with the enclosed copy of this invoice.
If you should have any questions, please do not hesitate to contact me.
Sincerely
Ana D. Kilmer
Management Analyst
Administration
ADK/
Enclosure
I ZEMCommuniry DeveloprnrMAdministration DivisionV ilma \SOPS for Billing Reinspwion feminvoim.dao
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone(434)296 -5832 Fax (434) 972 -4126
February 11, 2013
Godsey & Son, Inc. 9 %Za/I' c'EiJG/ ✓oieE' iassi/
c/o Brandon T. Nelson �Yem Asa✓ fold
2461 Charles City Road ri �riy fr.eEj�.r ed-
Richmond, Virginia 23231
Re: Crown BMW Retail Parts & Service Building
WPO -2011 -00042
Notice to Comply
Dear Mr. Nelson:
Under Section 17 -213 of the Albemarle County Code, this is your NOTICE TO COMPLY with the
requirements of your Erosion Control Permit for the referenced project and to immediately take corrective
measures that address the erosion and sediment control deficiencies on the property. The specific deficiencies
and measures required to correct those deficiencies are as follows:
1. Deficiency: Mud is being tracked onto the roadway at People's Place and Richmond Road.
Required Corrections: Remove soil material from street and curb line. Install two (2)
construction entrance's, one on Richmond Road and one on People's Place as shown on the
approved plan.
2. Deficiency: Diversion dike or drainage swale not installed to prevent sediment -laden runoff from
washing out into the roadway at People's Place.
Required Corrections: Install diversion dike or drainage swale to channel sediment -laden runoff
into the sediment basin.
3. Deficiency: Silt fence has been destroyed by pipe material and equipment. Silt material can not be
allowed to wash onto the sidewalk and roadway on Richmond Road are People's Place..
Required Corrections: Install new silt fence and install silt fence not shown on the plan sheet in
areas that have been disturbed and left unprotected, like the water connection and soil stock pile at
Richmond Road entrance.
4. Deficiency: Sediment material from this project has entered the drainage structures on People's
Place.
Required Corrections: Clean material from the drainage structures.
The above noted corrections and/or repairs must be completed on or before the end of the workday
Wednesday, February 20, 2012. If you should have any questions, please do not hesitate to contact me at (434)
296 -5832, ext.3390.
Crown BMW Retail Parts and Service Building
August 28, 2012
Page 2
Sincerely
/ Ken Thacker
Erosion Control Officer
Inspection Division
KT
Copy: Crown Motorcar Company, LLC, 2905 Premiere Pkw, Suite 300, Duluth, GA 30097
Rickey & Donne Baumgardner, 1252 Still Meadow Ave, Charlottesville, VA 22901
Morlando Construction, LLC,8604 Cliff Cameron Drive, Suite 155, Charlotte, NC 28269
Reading File
.�''i1�i18i4Tfi
UAt0
�OF ALBn. �Q
_1_
a
�'�RGIN�P
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone(434)296 -5832 Fax(434)972 -4126
EROSION CONTROL RE- INSPECTION INVOICE #2
DATE: March 21, 2013
INVOICE TO: Crown Motorcar Company, LLC
c/o George Karolis
2905 Premiere Pkwy, Suite 300
Duluth, GA 30097
RE: Crown BMW Retail Parts & Service Building
W PO- 2011 -00042
Notice to Comply dated 2/11/2013
DATE OF RE- INSPECTION: 3/15/2013
RE- INSPECTION FEE: $250.00
By April 21, 2013 you should forward the re- inspection fee of $250.00 to continue your project.
To pay the re- inspection fee, please send a check payable to the County of Albemarle to my
attention along with the enclosed copy of this invoice.
If you should have any questions, please do not hesitate to contact me.
Sincerely
Ana D. Kilmer
Management Analyst
Administration
ADK/
Enclosure
1�EFMommunity Devebpmenn�dminiMzfm DivirionV(ilmerAWPS for Billing Rcinymnbn li -invoire.dm
Compliant ❑
Notice to Comply ❑
/ Stop Work ❑
Z j0,
Erosion Control Inspection Report
Project Name�+lbrti✓ !!� /�f�i�� f �[`3Wi/A;A; File Number:
County Inspector: l'S6,✓vy Inspection Date: . —�� �3 Time:
Initial controls ❑ Clearing ❑ Rough Grading ❑ Construction ❑ Finish Grading ❑ Stabilization ❑ swm conversion ❑
J
Compliance
Comments/Notes
va:
No
Silt, safety,
tree fence
Diversions,
Berms,
ditches
Inlet, culvert
protection
Stream
work,
crossings
Traps,
Basins
Stabilization
Entrances
Limits
f�E - /,rt 7�a✓ �� �NF/ iiAS .6FF.v�J�cfQ A�F.✓7AA�II.✓Gs 7i .� i
°f
�tAi E/ iC /�S��UO�i� �F�t:s �•✓ s%of s.�w /.� .:✓ �.✓i
/o cad rc� �✓.�e�ds 7% 6F elee;,. eW v/o.
J
Kenny Thacker
To: dmoriando @morlandoconstruction.com
Cc: Godsey & Son
Subject: Emailing: BMW (3), BMW (1), BMW (2)
Attachments: BMW (3).jpg; BMW (1).jpg; BMW (2).jpg
Mr. Morlando,
Because of snow on March 6, 2013, I delayed the re- inspection of this project until today. I
have attached the pictures that show stone has been placed at the entrance to your
construction trailer as requested. The sidewalk in front of the project is open to the
public, so it needs to be kept clean of debris and mud. Additional silt fence would help in
this area but most of all you just need someone to maintain it.
Your message is ready to be sent with the following file or link attachments:
BMW (3)
BMW (1)
BMW (2)
Note: To protect against computer viruses, e-mail programs may prevent sending or receiving
certain types of file attachments. Check your e-mail security settings to determine how
attachments are handled.
t'-