Loading...
HomeMy WebLinkAboutSDP201400050 Review Comments No Submittal Type Selected 2014-10-22�'II;GtNZ�' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 October 22, 2014 Scott Collins c/o Collins Engineering 200 Garrett Street, Suite K Charlottesville, VA 22902 RE: ARB201400090 Acme Stove and Fireplace Center Dear Mr. Collins: I have reviewed the plans with the revision date of October 8, 2014 submitted for the above referenced project against the conditions of approval outlined by the ARB at the meeting held on August 18, 2014. After reviewing the revised plans and consulting with the ARB, we have the following comments: 1. Revise the trellis detail to indicate that the oak used to wrap the steel columns will be stained or otherwise treated to ensure sustainability of the material. 2. Provide for review a complete lighting plan addressing all proposed site and exterior building lights, or indicate on the plan that no lighting is proposed. Also, please note that the ARB recommended, but did not require, that cap flashing be provided for the columns to provide additional weather protection. Please forward me two sets of revised drawings together with the attached resubmittal form and a memo summarizing the revisions you've made. If changes other than those requested have been made, identify those changes in the memo. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. When staff s review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner cc: ARB- 2014 -90 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Margaret Maliszewski DATE: PROJECT NAME: ARB201400090 Acme Stove Submittal Type Requiring Revisions O indicates Submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 Margaret Maliszewski Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2014 -90 2 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Margaret Maliszewski