Loading...
HomeMy WebLinkAboutSDP201200049 Legacy Document 2013-09-030 ALg� jRGII31P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 30, 2013 Alan Franklin Waterstreetstudio 111 Third Street SE Charlottesville, VA 22902 RE: SDP201200049_Church or Our Saviour — Preliminary /Initial Site Plan Mr. Franklin: The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced site plan. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of the final site plan. An Erosion and Sediment Control Permit may be issued after the following approvals are received: 1. Approval an Erosion and Sediment Control Plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. 2. Approval of a Stormwater Management Plan meeting the requirements of Chapter 17 of the Code. 3. Approval of all easements for facilities for stormwater management and drainage control. 4. Road Plan 5. Submittal of a tree conservation checklist. 6. Stormwater Management, Erosion and Sediment Control, and road plan, bonds to be posted. The final site plan will not be considered to have been officially submitted until the following items are received: 1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code. 2. A fee of $1,500. 3. Submittal of plans directly to each of the agencies /departments listed below necessary to satisfy the conditions of approval. The final site plan will not be approved until the following conditions are met: The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained: Planning Division Approval of: (2 Copies are required to be submitted for review) 1. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code. 2. A landscape plan meeting the requirements of section 32.7.9 of Chapter 18 of the Code, including a tree conservation checklist. 3. Outdoor lighting information including a photometric plan and location, description, and photograph or diagram of each type of outdoor luminaire [Sec. 32.7.8 & Sec. 4.17] 4. Pursuant to discussions had with the applicant on 8- 28 -13, the shared parcel boundary of TMP 61 -144 and TMP 61 -146D is to be vacated to render the two parcels into a single parcel. This will require a boundary line adjustment plat to be formally submitted for review under Chapter 14 -208.1 of the subdivision ordinance and approval by the County prior to final site plan approval. 5. [Chapter 18 Section 32.5.2(b), 4.12.6] On the plan provide the parking schedule /calculations for the proposed building (Proposed Annex/ Youth Center) to include the amount required and the amount provided. On the plan account for the required and provided spaces and where the spaces are to be located. 6. On sheet 1 of the site plan under Site Data assure the zoning of TMP 61 -144 makes note of the split zoning of the parcel which was a result of the recent rezoning (ZMA201200006), notably 0.487 acres of the parcel is zoned C -1, the rest is zoned R -2. Also for TMP 61 -144 there is an approved Special Use Permit w/ condition (SP2000 -60), assure this information is listed on sheet 1 under Site Data for the lot's zoning. 7. [14- 302(A)4 & 14 -317] The plan depicts proposed access modifications which will take place on TMP 61 -146 Vanderline Housing Inc. and TMP 61 -146A William/ Anne Debutts, TMP 61- 145 Church of our Saviour and TMP 61 -1456D Trustees of Church of Our Saviour. On sheet 1, under Site Data these parcels, their Zoning and property owners information shall be added to the final site plan. Also, prior to final site plan approval please provide signed off -site agreements for temporary grading and construction easements from all affected property owners. 8. The proposed widening of the right -of -way easement from 20' to 24' and the extension of the easement will require an easement plat to be formally submitted for review under Chapter 14 -208.2 of the subdivision ordinance and approval by the County prior to final site plan approval. All parties affected by this easement modification must sign the plat. With this modification to the easement a maintenance agreement shall also be developed by the applicants and reviewed /approved by the County Attorney prior to approval of the final site plan. All parties affected by this easement modification must sign the maintenance agreement. It is highly advisable that the applicant hold off on obtaining signatures on the above items until staff has indicated the draft submittals are approvable. 2 9. [Chapter 18 Section 21.7(c)] & 33.5)] As proposed the 20' buffer zone adjacent to residential districts is being disturbed w/ grading, retaining walls, additional parking and a paved access way. The above section of the ordinance states: No construction activity including grading or clearing of vegetation shall occur closer than twenty (20) feet to any residential district. Screening shall be provided as required in section 32.7.9. A "waiver" processed as a Special Exception by the Board of Supervisors is required prior to final site plan approval. Please request the waiver so that staff may process the item. 10. [Chapter 18 Section 21.7(c)] On the plan assure the required 20' buffer to residentially zoned property is depicted and labeled. 11. [Chapter 18 Section 4.2.5(b), 4.2.6a 32.6(d)] As proposed there is disturbance to critical slopes onsite. As such a Critical slope "waiver" processed as a Special Exception by the Board of Supervisors is required prior to final site plan approval. This item is being held until the other waiver mentioned above has been requested and processed. 12. [Chapter 18 Section 32.5.2 (i)] On the plan label Rio School Lane. 13. [Comment] Assure the proposed buildings' square footage is consistent throughout the plan. Currently sheet 3 lists it as 5,802 SF and sheet 1 under building square footage lists it as 5,900 SF. Revise. 14. [32.5.2 (1)] On sheet 3 the plan depicts /labels a gas meter being relocated; as such City Gas shall sign off on the relocation prior to the final site plan being approved. If it is not being relocated omit or revise the note from the final site plan. 15. [Comment] On sheet 1, under Land Use Breakdown, the plan makes note of "Open Space = 157,446 SF for 59% of the property ". To avoid confusion discontinue the use of the term "Open Space" as this area does not qualify as true "Open Space" per Section 4.7 of the ordinance. 16. [Comment] With regard to proposed entrance closings of the various existing entrances to TMP 61 -146A and 145 as commented on by VDOT. The final site plan shall depict all of these entrance closings. 17. Pursuant to discussions had with the applicant on 8- 28 -13, it is acknowledged that there is a proposal to phase the second entrance (school house lane) with the final site plan. If the phasing plan is submitted it must be reviewed and approved by the various review agencies prior to final site plan approval. 18. If the applicant does not intent to construct or bond the proposed upgraded second entrance and road as depicted on preliminary site plan the applicant shall work with Engineering, Planning and Fire & Rescue to determine an appropriate remedy to prevent through traffic (gate, fence, bollards, or some alternative). Engineering Division Approval of: (submit 3 copies of the revised plans, calculations, and narratives to Current Development Engineering alone with the required review fee and transmittal forms.) 1. An Erosion and Sediment Control Plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle 2. A Stormwater Management Plan meeting the requirements of Chapter 17 of the Code. 3. All easements for facilities for stormwater management and drainage control. 4. Road plans will be required to be submitted and approved prior to final site plan approval. 5. One parking space does not appear to be the minimum 9' width. 6. Final site plan will address all requirements of 18 -32.6 County Code. 7. VDOT approval required for final site plan approval. Albemarle County Architectural Review Board Approval of a Certificate of Appropriateness. (8 Copies are required to be submitted for review) 1. The new two -story building is expected to have some visibility from the Entrance Corridor, particularly during the winter months. It appears that the proposal will qualify for a "Countywide Certificate of Appropriateness for a structure located behind a structure that fronts the Entrance Corridor ". Approval of that application will be required prior to final site plan approval. ARB applications, checklists and guidelines are available on line at www.albemarle.org /arb. Albemarle County Fire & Rescue Approval. (1 Copy is required to be submitted for review) 1. Verify Fire Flow requirements of 1000 gpm. 2. Add a hydrant to maintain the required 400 ft spacing for commercial buildings. Preferred location would be located on the backside of the parking lot between the existing Church and the new building. Vireinia Department of Transportation Approval. (1 Copv is reauired to be submitted for review 1. As part of the construction of the new commercial entrance onto Route 631, Rio Road, the entrances for the loop in front of the church's thrift store and all entrances of the real estate office directly onto Rio Road must be physically closed. VDOT standard CG -6 needs to be replaced at each of these entrances to close them. 2. The western most entrance to the real estate office off of the new shared access needs to meet the minimum throat length per Appendix F of the Road Deign Manual. For one egress lane, the minimum throat length should be 35 feet. 3. The entrance width should be a minimum of 30 feet as shown on Figure 4 -10 in Appendix F of the Road Design manual. 4. It appears that an access management spacing exception will be necessary for the new entrance due to the spacing between the signalized entrance of the gas station to the south and the proposed entrance shown in this site plan. I can support this exception on the basis that as part of the construction of the new entrance, three other existing entrances will be removed. Albemarle Countv Service Authoritv Approval. (3 Copv is reauired to be submitted for review 1. Submit 3 copies of the final site plan to the ACSA for construction review. 2. Submit 3 copies of the final site plan to RWSA (ATTN: Victoria Fort) for construction review (fire hydrant connection approval). 3. Provide a new fire hydrant tapped off of the RWSA 30" water main between buildings 1165 and 1143. 4 4. Show a detail for the force main tie in and provide the invert. 5. Under the construction review the ACSA will evaluate any water meter relocations required at the proposed access off Rio Road. 6. Show entire existing sanitary sewer lateral for the 1143 building (if the building is on septic please note the location of the septic field). 7. Show entire existing water service lateral for the 1143 building. If you have any questions about these conditions or the submittal requirements please feel free to contact me at Extension 3443, cperez @albemarle.org Sincerely, Christopher P. Perez Senior Planner