TO: Sarah Baldwin
FROM: Alexander J. Morrison, EIT, Civil Engineer
DATE: August 8, 2013
RE: Site Plan Technical Review for: SDP201300041: Stonefield Blocks F and G
The below checked items apply to this site.
✓
1.
This site plan is within the Authority's jurisdictional area for:
✓
A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
✓
2.
A 12 inch water line is located approximately (on site).
3.
Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
✓
4.
An 8 inch sewer line is located approximately (on site).
5.
An Industrial Waste Ordinance survey form must be completed.
✓
6.
No improvements or obstructions shall be placed within existing or future
easements.
7.
and plans are currently under review.
8.
and plans have been received and approved.
9.
No plans are required.
✓
10.
Final water and sewer construction plans required for construction approval.
11.
Final site plan may /may not be signed.
12.
RWSA approval for water and /or sewer connections.
13.
City of Charlottesville approval for sewer.
✓
Comments:
• Final water and sewer construction plans required for final review and approval.
• The ACSA will request an easement on the western side of the site to connect a proposed sewer
from Commonwealth Drive that will parallel the two existing storm water pipes.