Loading...
HomeMy WebLinkAboutSDP199200097 Plan - Site Grading & Utility Plan 1992-09-01STORM DRAIN STRUCTURE SCHEDULE STRUCTURE NO. TYPE I" INV STATION / COORDINATE NOTES 1 ES-1 24 N/A 459.48 N615415.12 E1992086.37 2 MH-2 54 503.50 491.34 N615525.48 E1992225.23 2 492.00 3 B-4 48 511.00 497.62 N615614.29 E1992310.36 3 498.62 4 DI-2A 510.60 507.10 18+97.55 / 11.50 RIGHT 5 MH-2 48 513.85 510.85 21+11.58 / 11.50 RIGHT 6 DI-2A 515.19 511.69 21+62.08 / 11.50 LEFT 51 1 .44 7 DI-2A 515.19 512.19 21+62.08 / 11.50 RIGHT 8 DI-2A 519.02 515.52 23+45.08 / 11.50 LEFT 9 DI-2A 519.02 516.02 23+45.08 / 11.50 RIGHT 10 DI-2A 520.56 517.56 24+61.08 / 11.50 LEFT 1 1 DI-2A 525.14 522.14 26+32.08 / 11.50 LEFT 12 DI-2A 528.12 524.62 27+09.96 / 11.50 LEFT 13 DI-2A 528.12 525.12 27+09.96 / 11.50 RIGHT 15 DI-2A 510.60 507.60 18+97.55 / 11.50 LEFT 16 PROJ. END N/A 507.84 18+97.55 / 24.00 LEFT 17 DI-2A 510.87 507,87 18+56.89 / 11.50 LEFT 18 PLUG N/A 508.11 18+56.89 / 24.00 LEFT 19 DI-2A 516.18 513.18 16+75.58 / 11.50 RIGHT 512.93 20 DI-2A 517.80 514.80 16+52.58 / 39.00 RIGHT 20A PROJ. END N/A 515.04 16+40.08 / 39.00 RIGHT 21 DI-2A 518.64 1 515.14 16+04.08 / 11.50 LEFT 22 DI-2A 519.41 1 516.41 15+82.09 / 11.50 RIGHT 23 DI-2A 525.02 521.52 14+21.09 / 11.50 LEFT 24 DI-2A 525.02 522.02 14+21.09 / 11.50 RIGHT 25 DI-2A 531.80 528.80 12+92.53 / 11.50 LEFT 26 DI-2A 533.02 530.02 12+25.04 / 11.50 RIGHT 27 PROJ. END N/A 524.52 14+11.01 / 24.00 LEFT 28 DI-2A 528.26 524.76 14+11.01 / 11.50 LEFT 29 DI-2A 528.73 525.73 13+80.22 / 11.50 RIGHT 30 ES-1(24) N/A 460.00 N615145.39 E1992597.82 31 MH-2 48 479.50 476.00 N615178.95 E1992681.33 32 DI-2AA 499.00 491.00 N615247.77 E1992756.33 495.00 33 PROJ. END N/A 495.60 N615258.45 E1992767.55 34A PROJ. END N/A 506.64 N616346.44 E1993015.36 34 MH-2 48 514.50 507.29 10+52.75 / 135.28 LEFT 507.50 2 35 PIPE JCN N/A 507.88 10+52.75 / 68.28 LEFT 4 510.11 36 DI-2A 517.38 512.51 10+95.04 / 41.50 RIGHT 4 37 DI-2A 517.38 512.11 10+95.04 / 41.50 LEFT 4 38 DI-2A 521.81 518.81 11+45.04 / 41.50 LEFT 4 39 DI-2A 521.81 518.81 11+45.04 / 41.50 RIGHT 4 40 MH-2 72 496.00 479.40 N616423.47 E1992243.04 5 480.05 488.50 6 NOTES: 1, ALL INLETS INDICATED AS DI-2A SHALL BE MODIFIED PER DETAIL SHEET 12. 2. MODIFIED OUTLET MANHOLE. SEE DETAIL SHEET 12 3. CMP RISER FITTED WITH VDOT STD. MH FRAME AND COVER. PIPE SIZE CHANGE 4. VANED GRATE(NEENAH FNDRY MODEL R-3580 OR EQUAL) INSTALLED WITH INLET 5. REMOVE EXISTING HEADWALLS AND EXTEND CMP CULVERTS AT LIKE SLOPES. 6. TEMPORARY SEDIMENT BASIN RISER CONNECTION SANITARY SEWER STRUCTURE SCHEDULE STRUCTURE NO. RIM INV IN INV OUT STATION / COORDINATE NOTES EXSS1 442.60 436.30 435.70 N615027.04 E1992563.89 1,2 EXSS2 487.00 481.50 481.00 N616230.91 E1993256.49 2 S1 478.00 472.00 471.80 N615178.99 E1992694.83 S2 504.00 498.70 498.50 N615317.97 E1992596.21 S3 513.00 506.00 505.80 21+18.09 / 28.00 RIGHT S4 514.00 508.20 508.00 17+18.09 / 28.00 RIGHT 5 S5 520.84 516.20 516.00 24+71.09 / 5.00 LEFT S6 491.50 488.10 487.90 N616242.06 E1993186.91 S7 1 517.00 1 512.00 503.70 N616178.20 E1993133.75 3 S8 526.50 520.50 520.30 12+10.71 / 104.66 LEFT 4 S9 531 523.7 523.5 11+96.38 / 59.25 RIGHT 4 NOTES: 1. CONTRACTOR TO USE NON -SHRINK GROUT TO SEAL NEW CONNECTION INTO R.W.S.A. MANHOLE WITH BITUMINOUS SEALER COATS INSIDE AND OUT. 2, PROPOSED INVERT IN TO BE CONSTRUCTED AT TOP OF EX. MANHOLE SHAPED BOTTOM SHELF. CONTRACTOR TO VERIFY ELEVATION PRIOR TO CONNECTION. 3. DROP MANHOLE TO BE INSTALLED PER DETAIL SHEET 14. 4. SIX INCH STUB WITH PLUG TO BE PROVIDED FOR FUTURE CONNECTION. 5. COMPACTION TEST TO BE PERFORMED AT 4' VERTICAL MIN. INCREMENTS AND RESULTS SUBMITTED TO ACSA FOR APPROVAL SANITARY SEWER PIPE SCHEDULE U/S ID D/S ID DIA DESCRIPTION NOTES S9 S8 8 160 LF @ 1.88% 2 S8 S7 8 228 LF @ 3.64% S7 S6 8 78 LF @ 20.00% 3 S6 EX SS2 8 66 LF 9.70% S5 S3 8 374 LF 2.67% S4 S3 8 396 LF @ 0.51 % 2 S3 S2 8 193 LF @ 3.68% S2 S1 8 166 LF @ 15.96% S1 EX SS 8 198 LF @ 17.93% NOTES: 1. PIPE LENGTHS PROVIDED ARE FROM INSIDE WALL OF STRUCTURE TO INSIDE WALL OF STRUCTURE (48" MH) 2. INSTALL 29 MIN. LENGTH DIP CENTERED ON WATERLINE 3. PIPE TO BE DUCTILE IRON WITH PIPE ANCHORS. PLAN NOTES: 1. SEE SHEET 2 FOR LEGEND AND GENERAL CONSTRUCTION NOTES 2. SEE SHEET 3 FOR ROAD AND SITE'FEATURE LAYOUT. 3. SEE SHEET 4 FOR STORM DRAIN AND SANITARY SEWER PIPE AND STRUCI URIC SCHEDULES. 4. SEE SHEET 13 FOR ROAD TURNOUT AND ENTRANCE DIMENSIONS. 5. WATERLINE TO BE LOCATED 5' FROM LOOP ROAD CENTERLINE AND 10' FROM ENTRANCE DRIVE CENTERLINE UNLESS OTHERWISE NOTED ON PLANS. CONTRACTOR SHALL MAINTAIN 5' MIN. SEPARATION BETWEEN CENTERLINE PIPE AND STORM DRAINAGE PIPES AND STRUCTURES. 6. ALL PAD WATERLINE SERVICES FOR DOMESTIC AND FIRE FLOW REQUIREMENTS SHALL BE PROVIDED FROM 8-INCH STUBS INDICATED. VALVES SHOWN ARE TO BE LOCATED 5' BEHIND FACE OF CURB. 7. SANITARY SEWER SIDE SEWER LATERALS INDICATED ON PLAN SHALL BE 6- INCH AT 2.00% MINIMUM SLOPE. ENDS SHALL BE MARKED WITH 2X4 POSTS INDICATING LOCATION AND DEPTH TO INVERT. 8. IN FUTURE PARKING AREAS CONTRACTOR SHALL INSTALL COMPACTED FILL TO 8" BELOW GRADES INDICATED. 2" MIN TOPSOIL SHALL BE ADDED TO ALL DISTURBED SURFACES AND HYDROSEEDED PER EROSION CONTROL NARRATIVE. 9. PVC UTILITY CONDUITS SHOWN SHALL EXTEND Y BEYOND FACE OF CURB. PIPES TO BE INSTALLED 12" O.C. WITH 18" MIN. COVER. 10.GAS LINE INDICATED ON PLANS IS PROVIDED BY CHARLOTTESVILLE GAS. LOCATION SHOWN IS APPROXIMATE AND FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL CONTACT DEFT. OF PUBLIC WORKS - GAS DIVISION AT 971-3340 FOR EXACT DESIGN INFORMATION AND TO COORDINATE INSTALLATION. 1 \ \ \ \ \ \\ 11.ELECTRIC LINE LOCATION SHOWN IS APPROXIMATE AND SHOWN FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL CONTACT VA POWER AT 980-6725 FOR DESIGN INFORMATION AND TO COORDINATE INSTALLATION.. / V . i' )001 )001 I % i I I I I Gp ECf TO EX/�T/ / v 4" SEE / // / / 1 I / / l I Z i %3-4 TDL 9.vOs CLJPE- \ OE TA•/L -5 -U ft Al 3-7 Tp 01 i \ e/ 1 --\\ /, ii ,✓'>F /i/ 1 � / ?-t535.o 'S35.Oi� � \ STORM DRAIN PIPE SCHEDULE excludes pond outtails) U/S ID D/S ID DIA DESCRIPTION NOTES 2 1 24 177 LF @ 18.00% 3 2 96 120 LF @ 0.50% 2 4 3 24 34 LF @ 14.13% 5 4 18 214 LF @ 1.75% 6 5 18 50 LF @ 1.18% 7 6 15 23 LF @ 2.17% 8 6 15 183 LF @ 2.09% 9 8 15 23 LF P 2.17% 10 8 1 5 116 LF 1.76% 1 1 10 1 5 171 LF 2.68% 12 1 1 1 5 41 LF @ 6.05% 13 12 1 5 23 LF @ 2.17% 1 5 4 1 5 23 LF @ 2.17% 16 15 15 12 LF @ 2.00% 17 15 15 40 LF @ 0.68% 18 17 1 5 12 LF @ 2.00% 19 4 18 221 LF @ 2.64% 20 19 18 54 LF @ 3.46% 20A 20 1 8 12 LF 2.00% 21 19 18 71 LF @ 2.76% 22 21 24 33 LF @ 3.89% 23 21 24 183 LF @ 3.49% 24 23 18 23 LF 2.17% 25 23 18 128 LF @ 5.69% 26 25 18 64 LF @ 1.91% 28 27 18 12 LF @ 2.00% 29 28 18 38 LF 2.55% 31 30 2.4- 90 LF @ 17.78% 32 31 24 103 LF 14.56% 33 32 24 12 LF @ 5.00% 34A 34 1 5 65 LF @ 1.00% 3 35 34 54 65 LF @ 0.50% 2 37 35 15 50 LF @ 4.00% 36 37 1 5 80 LF @ 0.50% 38 37 1 5 50 LF 13.40% 39 36 1 5 50 LF @ 12.60% I I 1 I � 1 I 1 � 1 1. ALL PIPE TO BE CLIII RCP UNLESS NOTED. ' 2.3" x1" CMP DETENTION TANK. PIPE TO BE ALUMINUM, GALVINIZED STEEL OR STEEL WITH ASHALT TREATMENT. H2O LOADING REQUIRED, CONTRACTOR RESPONSIBLE FOR ! ANY ADDITIONAL REQUIREMENTS FOR CONSTRUCTION EQUIPMENT LOADING. - 3. CMP. 4. ALL LENGTHS PROVIDED ARE FROM CL STRUCTURE / I TO CL STRUCTURE. / II i \ Ex/sr. zo' o r � l 561 \V\ \ \ \ O c \ \\ \ M4 TC/- L /A/E S<lEET S r'4/V1z=j' McKEE/CARSON CONSULTING ENGINEERS LANDSCAPE ARCI IITECTS PLANNERS QUEEN CI IARLOTTE SQUARE 256 EAST HIGH STREET CI IARLOTTESVILLE, VA 22902 804-979-7522 O /r o ROBERT B. McKEE y U y� CECERTIFICATE No. �, ��,�,� Z7 83\�`� f 0 PROFESS I ONA� �� W;Cie za i } V (75 W 4-1 W N V r CieLLJ i-. zz 1 Z } W Revisions: i 9 - /7- 9Z Scale: / "= 50' Date: 7- /- 92 Project No: 9117 C1lecked By: Sheet No.: OF: 25 I J McKEE/CARSON CONSULTING ENGINEERS LANDSCAPE ARCI IITECI'S PLANNERS QUEEN CI IARLOTI'E SQUARE 256 EASI' 11IG1 I STREET CI IARLoTITESVILLE, VA 22902 804-979-7522 L ge-r R0?ERT B. M VKEE r CERTIFICATE No. Z703 ��PROfESS 10"lA� �� Y v� a ui W E N '� r. JW r t W U' Z Im r � H Revisions: e -/7- 9Z Scale: / "= 50 ' Date: 7- /- 92 Project No: 9117 Checked By: Sheet No.: 5 OF: 25 T �.Po�osEO /6 SAW W9TEP L/A/E M�}TCf 1 L /ti/E - EET 5 \ SO O �- 1 I I \ +A 49 45'BEit/e-I 512.1e 4g0 If ' \\ \ \ \ \ \\ �` � � PEMO ✓E 45'.BE.J2� / \ I I I I �' � I , \ EXIST/ti/� � 1! •- \ \ +sr.6 sn.G+ 1 ` 1 \ � \ \ I\ 470 EX. S/LT \CMB0d/7Z - I i \\ I I 1 I\ \ 11 I � J J I 1 \ 48 50 _ l 1 / .I III / III II'I _� it `\ •- _- -1 \ I 490 1 _ _ I I 1 490 ----- --— — — — — — - ------ 1 �i 1 I \ /11 /u `_ I Qa I _ /50 L . F CZ . I R114.04.0of/q sECr --------------_ Of If - 4---, --- - - - - - --- - _---_- -_-_ - / ` � � •. . ,_.- i 1 \ ''fib- _ — _ _ _ -- -- - - / PLAN NOTES: 1. SEE SHEET 2 FOR LEGEND AND GENERAL CONSTRUCTION NOTES 2. SEE SHEET 3 FOR ROAD AND SITE FEATURE LAYOUT. 3. SEE SHEET 4 FOR STORM DRAIN AND SANITARY SEWER PIPE AND STRUCTURE SCHEDULES. 4. SEE SHEET 13 FOR ROAD TURNOUT AND ENTRANCE DIMENSIONS. 5. WATERLINE TO BE LOCATED 5' FROM LOOP ROAD CENTERLINE AND 10' FROM ENTRANCE DRIVE CENTERLINE UNLESS OTHERWISE NOTED ON PLANS. CONTRACTOR SHALL MAINTAIN 5' MIN. SEPARATION BETWEEN CENTERLINE PIPE AND STORM DRAINAGE PIPES AND STRUCTURES. 6. ALL PAD WATERLINE SERVICES FOR DOMESTIC AND FIRE FLOW REQUIREMENTS SHALL BE PROVIDED FROM 8-INCH STUBS INDICATED. VALVES SHOWN ARE TO BE LOCATED 5' BEHIND FACE OF CURB. 7. SANITARY SEWER SIDE SEWER LATERALS INDICATED ON PLAN SHALL BE 6- INCH AT 2.00% MINIMUM SLOPE. ENDS SHALL BE MARKED WITH 2X4 POSTS INDICATING LOCATION AND DEPTH TO INVERT. CZ [ P/P PA/' Cti4it/n /EL SEE 5EG T/OA,/ A -A SA/T /2 8. IN FUTURE PARKING AREAS CONTRACTOR SHALL INSTALL COMPACTED FILL TO 8" BELOW GRADES INDICATED. 2" MIN TOPSOIL SHALL BE ADDED TO ALL DISTURBED SURFACES AND HYDROSEEDED PER EROSION CONTROL NARRATIVE. 9. PVC UTILITY CONDUITS SHOWN SHALL EXTEND Y BEYOND FACE OF CURB. PIPES TO BE INSTALLED 12" O.C. WITH 18" MIN. COVER. 10.GAS LINE INDICATED ON PLANS IS PROVIDED BY CHARLOTTESVILLE GAS. LOCATION SHOWN IS APPROXIMATE AND FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL CONTACT DEPT. OF PUBLIC WORKS - GAS DIVISION AT 971-3340 FOR EXACT DESIGN INFORMATION AND TO COORDINATE INSTALLATION. 11.ELECTRIC LINE LOCATION SHOWN IS APPROXIMATE AND SHOWN FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR SHALL CONTACT VA POWER AT 980-6725 FOR DESIGN INFORMATION AND TO COORDINATE INSTALLATION.. n-Iy 7-Cl/ L /A/E 3-/EET S .' AQ �\+• 1 I v I 1 �1 11 I I v '�'�• r l / � it � // �' � / /l / \ \ \\ I + \ I 1 4/ ✓2"/✓7/A/ OO✓EP- TO P.PD ✓/OE HMO D rN / jl % , if / / ll l l A,?./-/ EX. / If / Spy T.Z' \v v A ` v \\� v i 19/.e / I I I 1 •� i ,1 �',` �, I 1 I 1 � I I� � � // // // JEE �fEC7/p' CA , I ' / W I / 49T.a If Ix PESOUiPICE /2,4PO7E6 T/OA/ II I ,I r 4 I I I \ i i r ,0/V1Z=J, McKEE/CARSON CONSULTING ENGINEERS LANDSCAPE ARCI IITECTS PLANNERS QUEEN CHARLOTTE SQUARE 256 EAST HIGH STREET CI IARLOTTESVILLE, VA 22902 804-979-7522 �. rr ROBERT B. MCKEE i CERTIFICATE No. Z783 � � �� PROFESS I ONA� Revisions: 0 d-/7- 92 Scale: / "_ 50 ' Date: 7- /- 92 Project No: 9117 Checked By: Sheet No.: OF: 25